SHE-SR-SR 47/SR 274-22.35/15.19
SHE County · est $0.3M
Bid dateThursday, January 11—
SHE County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1J & J Schlaegel INC | R2R B Jergens Contractors INC | R3Vtf Excavation LLC | R4Eagle Bridge CO | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 63 CY | $600 | $505 | $650 | $625 | $696 | 15% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $35,500 | $32,000 | $46,821 | $38,000 | $18,500 | 14% |
| 611E94920 8' X 7' CONDUIT, TYPE A, 706.05 (2 FT COVER) | 47 FT | $739 | $781 | $970 | $825 | $1,592 | 14% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 |
| Item | Quantity | R1J & J Schlaegel INC | R2R B Jergens Contractors INC | R3Vtf Excavation LLC | R4Eagle Bridge CO | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $3,500 | $1,800 | $3,000 | $15,000 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 252 SY | $7.00 | $14.00 | $6.49 | $17.00 | $11.00 |
| 202E38000 GUARDRAIL REMOVED | 363 FT | $2.50 | $4.40 | $3.42 | $1.50 | $1.50 |
| 203E10000 EXCAVATION | 80 CY | $20.00 | $15.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 95 CY |
| $218 |
| $118 |
| $280 |
| $219 |
| $206 |
| 8% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 96" CMP | 118 FT | $155 | $168 | $151 | $145 | $175 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,500 | $24,000 | $31,725 | $27,500 | $65,000 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $13,500 | $10,000 | $9,360 | $10,000 | $37,991 | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $10,000 | $9,500 | $7,166 | $10,000 | $11,783 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 30 CY | $280 | $183 | $288 | $281 | $320 | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $1,800 | $1,890 | $2,160 | $1,804 | $1,856 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,700 | $4,500 | $5,503 | $6,500 | $12,341 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,946 LB | $1.20 | $2.00 | $1.17 | $2.25 | $1.50 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 3 EACH | $1,975 | $2,389 | $2,730 | $1,980 | $2,036 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,200 | $2,500 | $3,240 | $3,500 | $6,500 | 2% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 42 SY | $120 | $110 | $194 | $165 | $133 | 2% |
| 659E10000 SEEDING AND MULCHING | 1,282 SY | $3.50 | $1.80 | $1.86 | $3.00 | $3.50 | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 250 FT | $17.75 | $25.20 | $31.83 | $17.79 | $18.50 | 2% |
| 659E00300 TOPSOIL | 142 CY | $30.00 | $28.00 | $40.17 | $20.00 | $56.50 | 2% |
| 622E41000 PORTABLE BARRIER, 32" | 420 FT | $10.00 | $18.00 | $19.20 | $15.00 | $22.00 | 2% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 118 FT | $32.00 | $12.80 | $46.02 | $35.00 | $67.50 | 2% |
| $12.51 |
| $25.00 |
| $18.00 |
| 203E20000 EMBANKMENT | 132 CY | $25.00 | $10.00 | $13.13 | $25.00 | $16.50 |
| 204E10000 SUBGRADE COMPACTION | 441 SY | $1.25 | $2.00 | $0.75 | $5.00 | $2.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $700 | $1,050 | $1,200 | $702 | $722 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $820 | $1,500 | $554 | $1,000 | $1,296 |
| 601E11000 RIPRAP, TYPE D | 16 SY | $120 | $277 | $66.22 | $300 | $110 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 13 CY | $85.00 | $90.00 | $75.20 | $65.00 | $96.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1 CY | $85.00 | $182 | $78.62 | $150 | $172 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $115 | $120 | $200 | $155 |
| 659E14000 REPAIR SEEDING AND MULCHING | 64 SY | $1.00 | $1.80 | $1.86 | $1.00 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.17 TON | $550 | $861 | $900 | $1.00 | $2,062 |
| 659E31000 LIME | 0.26 ACRE | $250 | $287 | $300 | $10.00 | $258 |
| 659E35000 WATER | 7 MGAL | $10.00 | $11.50 | $12.00 | $10.00 | $10.50 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.4 CY | $2,500 | $3,026 | $1,727 | $1,400 | $1,228 |
| 605E31100 AGGREGATE DRAINS | 123 FT | $14.00 | $15.00 | $7.36 | $8.00 | $15.50 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $8.00 | $29.50 | $13.31 | $6.00 | $26.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $8.00 | $16.50 | $5.30 | $4.00 | $23.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $8.00 | $16.50 | $5.30 | $4.00 | $23.00 |
| 611E10600 24" CONDUIT, TYPE C, 706.02 | 16 FT | $130 | $131 | $90.40 | $110 | $107 |
| 304E20000 AGGREGATE BASE | 70 CY | $42.00 | $39.50 | $48.68 | $65.00 | $47.00 |
| 407E10000 TACK COAT | 31 GAL | $4.00 | $3.55 | $24.00 | $4.01 | $3.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1 EACH | $5.00 | $50.00 | $75.77 | $8.00 | $47.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 7 EACH | $10.00 | $10.50 | $12.00 | $10.02 | $10.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28 FT | $9.00 | $14.70 | $16.80 | $9.02 | $10.50 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $40.00 | $94.50 | $108 | $40.09 | $129 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $20.00 | $42.00 | $48.00 | $20.05 | $20.50 |
| 642E00094 EDGE LINE, 6" | 0.18 MILE | $6,430 | $6,751 | $7,716 | $6,445 | $6,628 |
| 642E00290 CENTER LINE | 0.09 MILE | $6,570 | $6,898 | $7,884 | $6,585 | $6,773 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 10 EACH | $10.00 | $10.50 | $12.00 | $6.00 | $10.50 |
| 614E13360 OBJECT MARKER, TWO WAY | 10 EACH | $13.00 | $15.80 | $15.60 | $9.00 | $13.50 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.33 MILE | $6,072 | $6,375 | $7,286 | $6,300 | $6,259 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 24 FT | $8.00 | $8.40 | $9.60 | $8.00 | $8.50 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $3,500 | $23,000 | $4,221 | $26,500 | $7,378 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 57 SY | $25.00 | $22.50 | $9.22 | $40.00 | $31.00 |
| 512E33000 TYPE 2 WATERPROOFING | 88 SY | $15.00 | $22.00 | $13.19 | $20.00 | $50.50 |
| 512E33010 TYPE 3 WATERPROOFING | 60 SY | $28.00 | $32.50 | $36.15 | $35.00 | $92.50 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 40 SF | $6.00 | $5.15 | $3.57 | $6.00 | $9.50 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 20 CY | $85.00 | $71.70 | $75.18 | $90.00 | $114 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $2,850 | $2,543 | $4,000 | $18,500 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $550 | $1,200 | $2,400 | $2,400 | $1,100 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 63 CY | $600 | $38k | 13% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $35,500 | $36k | 12% |
| 611E94920 8' X 7' CONDUIT, TYPE A, 706.05 (2 FT COVER) | 47 FT | $739 | $35k | 12% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 95 CY | $218 | $21k | 7% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 96" CMP | 118 FT | $155 | $18k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,500 | $15k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $13,500 | $14k | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $10,000 | $10k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 30 CY | $280 | $8k | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $1,800 | $7k | 2% |