CHP-SR 4-02.17
CHP County · est $0.8M
Bid dateThursday, January 25—
CHP County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 45 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2J & J Schlaegel INC | R3R B Jergens Contractors INC | R4Double Z Construction Company | R5Shelly & Sands INC | R6Complete General Construction Company | R7Brumbaugh Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 515E12051 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 22 EACH | $10,000 | $13,910 | $9,748 | $9,800 | $10,300 | $11,000 | $10,000 | 32% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 124 CY | $750 | $865 | $655 | $570 | $785 | $500 | $850 | 13% |
| Item | Quantity | R1Eagle Bridge CO | R2J & J Schlaegel INC | R3R B Jergens Contractors INC | R4Double Z Construction Company | R5Shelly & Sands INC | R6Complete General Construction Company | R7Brumbaugh Construction INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $2,500 | $2,500 | $2,000 | $1,094 | $3,000 | $2,000 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 644 SY | $9.00 | $8.50 | $7.20 | $12.00 | $10.00 | $10.00 | $10.00 |
| 202E23500 WEARING COURSE REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, |
| 1 LS |
| $90,000 |
| $34,000 |
| $60,000 |
| $76,800 |
| $42,000 |
| $55,000 |
| $50,000 |
| 13% |
| 530E00200 SPECIAL - STRUCTURES: TRANSVERSE POST-TENSIONING O | 1 LS | $39,000 | $11,000 | $77,900 | $75,000 | $79,736 | $71,000 | $95,000 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 193 CY | $185 | $172 | $171 | $155 | $164 | $155 | $175 | 5% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 150 SY | $175 | $258 | $228 | $200 | $230 | $240 | $215 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 25,251 LB | $0.90 | $0.77 | $0.78 | $1.00 | $0.80 | $0.80 | $1.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $24,700 | $20,000 | $40,000 | $20,000 | $20,000 | $14,970 | 3% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 53 CF | $375 | $400 | $390 | $335 | $334 | $314 | $450 | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 193 FT | $103 | $102 | $142 | $102 | $109 | $119 | $150 | 3% |
| 304E20000 AGGREGATE BASE | 205 CY | $75.00 | $42.00 | $53.40 | $100 | $55.00 | $66.00 | $60.00 | 2% |
| 526E90010 TYPE A INSTALLATION | 127 FT | $110 | $130 | $122 | $102 | $151 | $170 | $100 | 2% |
| 203E20000 EMBANKMENT | 519 CY | $25.00 | $18.00 | $9.05 | $20.00 | $18.00 | $18.00 | $28.00 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 57 CY | $221 | $183 | $226 | $205 | $218 | $205 | $225 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (57 CY | $200 | $177 | $209 | $190 | $201 | $190 | $215 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $9,600 | $8,500 | $8,500 | $5,287 | $14,170 | $18,000 | 1% |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 88 EACH | $100 | $95.00 | $88.20 | $75.00 | $72.00 | $75.00 | $75.00 | 1% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,889 | $1,885 | $1,968 | $1,885 | $2,000 | $1,885 | $2,100 | 1% |
| 202E22900 APPROACH SLAB REMOVED | 245 SY | $30.00 | $25.00 | $30.00 | $30.00 | $33.00 | $40.00 | $18.00 | 1% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 57 SF | $125 | $95.00 | $154 | $110 | $117 | $110 | $115 | 1% |
| 600 SY |
| $6.01 |
| $6.50 |
| $11.30 |
| $6.00 |
| $5.00 |
| $10.00 |
| $10.00 |
| 202E38000 GUARDRAIL REMOVED | 350 FT | $1.50 | $3.50 | $3.70 | $4.00 | $3.00 | $5.00 | $7.00 |
| 203E10000 EXCAVATION | 375 CY | $15.00 | $13.00 | $18.60 | $18.00 | $9.00 | $10.00 | $17.00 |
| 204E10000 SUBGRADE COMPACTION | 1,294 SY | $3.00 | $1.25 | $2.20 | $5.00 | $4.00 | $6.00 | $1.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 200 FT | $17.39 | $17.35 | $22.60 | $17.35 | $19.00 | $17.35 | $24.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 3 EACH | $1,944 | $1,940 | $2,257 | $1,940 | $2,052 | $1,940 | $2,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $687 | $685 | $1,024 | $685 | $725 | $685 | $1,100 |
| 623E40500 REFERENCE MONUMENT | 2 EACH | $1,500 | $950 | $1,772 | $800 | $360 | $1,000 | $600 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1 CY | $100 | $150 | $184 | $300 | $422 | $750 | $60.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $100 | $105 | $100 | $93.00 | $100 | $150 |
| 659E00300 TOPSOIL | 230 CY | $10.00 | $30.00 | $44.70 | $20.00 | $15.00 | $20.00 | $35.00 |
| 659E10000 SEEDING AND MULCHING | 2,076 SY | $1.75 | $1.40 | $1.50 | $3.00 | $1.60 | $1.40 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 104 SY | $1.50 | $1.40 | $1.50 | $1.40 | $1.00 | $1.40 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.28 TON | $1,000 | $625 | $657 | $625 | $708 | $625 | $650 |
| 659E31000 LIME | 0.43 ACRE | $10.00 | $110 | $116 | $110 | $162 | $110 | $5.00 |
| 659E35000 WATER | 11 MGAL | $10.00 | $1.00 | $1.05 | $1.00 | $1.06 | $1.00 | $5.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 185 FT | $8.00 | $12.00 | $18.00 | $12.00 | $18.00 | $11.50 | $8.00 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $7.00 | $8.00 | $27.50 | $10.00 | $7.00 | $6.00 | $5.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $5.00 | $8.00 | $16.00 | $6.00 | $7.00 | $6.00 | $5.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $5.00 | $8.00 | $16.00 | $6.00 | $11.00 | $6.00 | $5.00 |
| 407E10000 TACK COAT | 113 GAL | $1.00 | $10.00 | $2.20 | $2.00 | $3.00 | $2.00 | $2.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $8.00 | $25.00 | $43.70 | $20.00 | $40.00 | $15.00 | $60.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BIDIRECTIONAL) | 10 EACH | $9.02 | $9.00 | $9.95 | $9.00 | $10.00 | $9.00 | $10.00 |
| 646E10010 EDGE LINE, 6" | 0.2 MILE | $9,286 | $9,265 | $13,495 | $9,265 | $9,800 | $12,852 | $20,500 |
| 646E10200 CENTER LINE | 0.1 MILE | $12,494 | $12,465 | $18,155 | $12,465 | $13,181 | $17,291 | $22,500 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 10 CY | $40.00 | $60.00 | $61.00 | $90.00 | $97.00 | $85.00 | $85.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 10 CY | $40.00 | $70.00 | $56.50 | $90.00 | $124 | $85.00 | $100 |
| 616E10000 WATER | 1 MGAL | $10.00 | $10.00 | $250 | $60.00 | $22.00 | $60.00 | $5.00 |
| 202E23500 WEARING COURSE REMOVED | 698 SY | $7.00 | $6.50 | $6.80 | $8.00 | $7.00 | $9.00 | $9.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,000 | $2,500 | $5,326 | $5,000 | $18,852 | $9,500 | $5,500 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 56 EACH | $15.00 | $30.00 | $36.90 | $30.00 | $28.00 | $20.00 | $22.00 |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 4 CY | $1,250 | $2,500 | $1,697 | $1,800 | $1,921 | $2,210 | $1,600 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 167 SY | $25.00 | $25.00 | $17.10 | $25.00 | $27.00 | $25.00 | $30.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 26 SF | $10.00 | $10.00 | $6.50 | $18.00 | $42.00 | $11.00 | $3.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 158 FT | $28.00 | $30.00 | $29.30 | $25.00 | $28.00 | $45.00 | $20.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 44 EACH | $6.00 | $15.00 | $30.50 | $25.00 | $16.00 | $65.00 | $16.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 38 CY | $80.00 | $85.00 | $66.90 | $90.00 | $82.00 | $150 | $50.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 222 FT | $8.00 | $20.00 | $16.90 | $14.00 | $13.00 | $14.00 | $12.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $10,000 | $6,300 | $5,500 | $4,746 | $8,000 | $10,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $1,500 | $12,310 | $3,500 | $2,700 | $10,000 | $5,000 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $1,750 | $550 | $1,200 | $2,300 | $3,800 | $2,500 | $1,700 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $5,000 | $6,700 | $5,000 | $12,588 | $3,000 | $4,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12051 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 22 EACH | $10,000 | $220k | 28% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 124 CY | $750 | $93k | 12% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $90,000 | $90k | 11% |
| 530E00200 SPECIAL - STRUCTURES: TRANSVERSE POST-TENSIONING O | 1 LS | $39,000 | $39k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 193 CY | $185.43 | $36k | 4% |
| 526E10000 REINFORCED CONCRETE APPROACH SLABS (T=12") | 150 SY | $175 | $26k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 25,251 LB | $0.9 | $23k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 53 CF | $375 | $20k | 2% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 193 FT | $102.59 | $20k | 2% |