CRA-SR 98-07.87
CRA County · est $2.0M
Bid dateThursday, February 15—
CRA County · est $2.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 95 more items below.
| Item | Quantity | R1Elite Excavating Company Of Ohio INC | R2Underground Utilities INC | R3Helms And Sons Excavating | R4Rietschlin Construction INC | R5Shelly & Sands INC | R6Complete General Construction Company | R7Karvo Companies INC | R8Trucco Construction CO INC | R9Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,269 CY | $139 | $140 | $172 | $169 | $147 | $147 | $167 | $181 | $154 | 12% |
| 608E10000 4" CONCRETE WALK | 34,448 SF |
| Item | Quantity | R1Elite Excavating Company Of Ohio INC | R2Underground Utilities INC | R3Helms And Sons Excavating | R4Rietschlin Construction INC | R5Shelly & Sands INC | R6Complete General Construction Company | R7Karvo Companies INC | R8Trucco Construction CO INC | R9Eclipse CO LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E26500 STUMP REMOVED, 18" | 19 EACH | $50.00 | $30.00 | $96.86 | $22.00 | $150 | $125 | $125 | $20.00 | $263 |
| 201E26510 STUMP REMOVED, 30" | 12 EACH | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $4.00 |
| $4.50 |
| $5.21 |
| $4.00 |
| $4.00 |
| $4.50 |
| $4.10 |
| $6.70 |
| $5.73 |
| 9% |
| 611E07400 18" CONDUIT, TYPE B | 869 FT | $145 | $146 | $115 | $122 | $90.00 | $100 | $112 | $115 | $157 | 9% |
| 611E04400 12" CONDUIT, TYPE B | 1,057 FT | $115 | $127 | $83.98 | $72.25 | $70.00 | $66.00 | $58.00 | $102 | $104 | 8% |
| 609E24511 CURB, TYPE 4-C, AS PER PLAN | 7,553 FT | $14.00 | $15.00 | $16.29 | $10.00 | $18.00 | $10.00 | $12.75 | $14.00 | $18.68 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $32,928 | $40,000 | $100,000 | $100,000 | $98,000 | $100,000 | $100,000 | 7% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (633 CY | $136 | $138 | $172 | $147 | $147 | $147 | $185 | $180 | $154 | 6% |
| 611E98470 CATCH BASIN, NO. 2-2B | 32 EACH | $2,200 | $1,800 | $1,545 | $1,856 | $2,000 | $1,300 | $2,000 | $700 | $1,720 | 5% |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 10 EACH | $6,500 | $6,000 | $4,202 | $8,000 | $3,550 | $2,130 | $4,900 | $2,500 | $3,917 | 4% |
| 611E10400 24" CONDUIT, TYPE B | 401 FT | $160 | $148 | $120 | $101 | $100 | $95.00 | $90.00 | $375 | $161 | 4% |
| 605E05111 4" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 7,553 FT | $8.00 | $7.00 | $7.93 | $11.75 | $8.50 | $12.00 | $11.00 | $7.00 | $9.97 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $25,000 | $81,293 | $24,000 | $80,000 | $100,000 | $193,000 | $61,374 | $66,000 | 4% |
| 610E50010 RETAINING WALL, MISC.: MODULAR WALL | 467 SF | $105 | $70.00 | $48.27 | $77.00 | $68.00 | $100 | $108 | $65.00 | $54.46 | 3% |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 966 SY | $45.00 | $48.00 | $54.65 | $46.00 | $55.00 | $70.00 | $41.00 | $51.00 | $72.28 | 3% |
| 452E15011 12" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, A | 909 SY | $44.00 | $65.00 | $40.94 | $50.00 | $60.00 | $56.00 | $56.25 | $92.50 | $76.60 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (APPROX 2" DEPT | 22,527 SY | $1.60 | $1.50 | $2.24 | $1.35 | $2.55 | $2.55 | $1.75 | $1.50 | $2.68 | 2% |
| 608E52000 CURB RAMP -TYPE C1 MODIFIED | 3,343 SF | $10.00 | $9.00 | $12.33 | $10.75 | $10.00 | $8.00 | $9.00 | $10.00 | $22.96 | 2% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $30,000 | $5,000 | $10,321 | $20,000 | $25,000 | $9,205 | $18,913 | $27,300 | $5,671 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,000 | $30,000 | $20,460 | $22,000 | $60,000 | $135,000 | $36,460 | $5,500 | $23,631 | 2% |
| $100 |
| $96.86 |
| $90.00 |
| $350 |
| $135 |
| $135 |
| $83.00 |
| $394 |
| 201E26520 STUMP REMOVED, 48" | 5 EACH | $200 | $200 | $96.87 | $189 | $490 | $145 | $145 | $175 | $525 |
| 202E00201 RAILROAD CROSSING REMOVED, AS PER PLAN | 1 LS | $7,500 | $1,000 | $595 | $4,900 | $5,000 | $7,500 | $4,000 | $9,000 | $13,539 |
| 202E23000 PAVEMENT REMOVED | 2,615 SY | $7.00 | $4.00 | $4.53 | $14.75 | $12.00 | $13.00 | $22.50 | $30.00 | $15.15 |
| 202E30000 WALK REMOVED | 26,807 SF | $1.00 | $0.50 | $1.74 | $1.15 | $0.50 | $1.50 | $1.75 | $1.00 | $1.60 |
| 202E32000 CURB REMOVED | 4,853 FT | $6.00 | $1.00 | $2.89 | $2.75 | $1.50 | $5.50 | $4.50 | $6.00 | $5.78 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $700 | $2,000 | $272 | $1,175 | $225 | $570 | $800 | $800 | $2,331 |
| 202E58100 CATCH BASIN REMOVED | 24 EACH | $500 | $200 | $396 | $900 | $185 | $540 | $420 | $400 | $1,026 |
| 202E98400 REMOVAL MISC.:REMOVE EXISTNG RETAIN WALL | 567 SF | $5.00 | $2.00 | $3.13 | $10.50 | $6.50 | $8.00 | $6.00 | $7.00 | $6.34 |
| 203E10000 EXCAVATION | 925 CY | $20.00 | $18.00 | $15.21 | $30.00 | $15.00 | $40.00 | $31.00 | $30.00 | $30.78 |
| 203E20000 EMBANKMENT | 1,267 CY | $15.00 | $12.00 | $17.96 | $16.25 | $12.00 | $14.00 | $11.50 | $12.00 | $24.09 |
| 204E13000 EXCAVATION OF SUBGRADE | 500 CY | $20.00 | $16.00 | $20.35 | $18.00 | $12.00 | $14.00 | $26.00 | $30.00 | $32.68 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 20 TON | $125 | $200 | $131 | $135 | $50.00 | $100 | $100 | $105 | $127 |
| 690E65020 SPECIAL - WORK INVOLVING WATER | 100 GAL | $10.00 | $30.00 | $13.64 | $15.00 | $3.50 | $100 | $20.00 | $17.50 | $8.40 |
| 690E65024 SPECIAL - WORK INVOLVING REGULATED WATER | 100 GAL | $8.00 | $35.00 | $9.74 | $15.00 | $2.00 | $3.00 | $27.00 | $35.00 | $8.77 |
| 202E30200 STEPS REMOVED | 48 FT | $15.00 | $25.00 | $18.73 | $46.50 | $16.00 | $29.00 | $25.00 | $10.00 | $25.09 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 689 FT | $20.00 | $20.00 | $6.85 | $56.00 | $14.00 | $16.00 | $14.00 | $30.00 | $25.36 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 25 FT | $10.00 | $50.00 | $31.12 | $66.00 | $70.00 | $31.00 | $24.00 | $50.00 | $65.30 |
| 623E38500 MONUMENT ASSEMBLY | 12 EACH | $200 | $1,000 | $751 | $815 | $1,275 | $830 | $900 | $1,030 | $1,264 |
| 623E40500 REFERENCE MONUMENT | 14 EACH | $100 | $150 | $308 | $54.00 | $330 | $705 | $130 | $770 | $268 |
| 659E00300 TOPSOIL | 412 CY | $55.00 | $28.00 | $36.73 | $21.00 | $50.00 | $27.00 | $28.00 | $30.00 | $49.94 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 7,085 SY | $2.00 | $4.00 | $2.18 | $2.75 | $0.92 | $2.00 | $0.83 | $0.90 | $1.42 |
| 832E15001 STORM WATER POLLUTION PREVENTION PLAN, AS PER PLAN | 1 LS | $2,500 | $4,000 | $5,238 | $2,700 | $1,500 | $1,075 | $1,575 | $1,000 | $1,129 |
| 611E00901 6" CONDUIT, TYPE B, AS PER PLAN (707.45) | 370 FT | $60.00 | $95.00 | $70.56 | $69.50 | $52.00 | $132 | $89.00 | $70.00 | $125 |
| 611E05900 15" CONDUIT, TYPE B | 94 FT | $115 | $145 | $82.80 | $76.75 | $88.00 | $96.00 | $69.00 | $81.00 | $121 |
| 611E05901 15" CONDUIT, TYPE B, AS PER PLAN (RAILROAD) | 59 FT | $145 | $143 | $102 | $120 | $125 | $96.00 | $72.00 | $95.00 | $141 |
| 611E16400 36" CONDUIT, TYPE B | 60 FT | $415 | $391 | $323 | $500 | $375 | $263 | $270 | $500 | $521 |
| 611E98510 CATCH BASIN, NO. 2-3 | 1 EACH | $3,500 | $3,500 | $2,067 | $3,000 | $2,800 | $2,600 | $2,950 | $1,500 | $2,191 |
| 611E99500 INLET, MISC.: SANITARY CLEANOUT & CAP AND CAST IRO | 8 EACH | $500 | $500 | $733 | $600 | $650 | $820 | $1,200 | $1,710 | $1,437 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN (SANITARY) | 11 EACH | $500 | $7,000 | $6,752 | $5,375 | $500 | $2,340 | $3,200 | $3,200 | $7,190 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 13 EACH | $1,100 | $300 | $494 | $900 | $750 | $465 | $900 | $1,500 | $510 |
| 611E99700 SPECIAL - GAS VALVE BOX ADJUSTED TO GRADE | 81 EACH | $60.00 | $30.00 | $308 | $90.00 | $150 | $240 | $140 | $600 | $299 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $2.00 | $2.00 | $1.30 | $1.25 | $1.80 | $1.00 | $1.50 | $1.40 | $5.06 |
| 895E10010 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 1 | 1 EACH | $20,000 | $28,000 | $32,246 | $28,000 | $25,000 | $25,500 | $16,000 | $6,800 | $22,350 |
| 611E96500 CONDUIT RECONSTRUCTEDAS PER PLAN | 200 FT | $125 | $215 | $82.11 | $300 | $235 | $105 | $350 | $415 | $435 |
| 204E10000 SUBGRADE COMPACTION | 440 SY | $2.00 | $2.00 | $3.75 | $5.40 | $4.00 | $5.00 | $2.00 | $2.00 | $4.97 |
| 204E45001 PROOF ROLLING, AS PER PLAN | 2 HOUR | $100 | $150 | $110 | $108 | $150 | $85.00 | $140 | $100 | $224 |
| 251E01020 PARTIAL DEPTH PAVEMENT REPAIR (442) | 300 SY | $35.00 | $45.00 | $30.64 | $29.00 | $65.00 | $65.00 | $48.50 | $70.95 | $68.27 |
| 253E01000 PAVEMENT REPAIR | 40 SY | $100 | $75.00 | $59.80 | $87.00 | $110 | $110 | $215 | $120 | $116 |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 40 SY | $100 | $120 | $47.24 | $120 | $260 | $260 | $112 | $122 | $273 |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 115 CY | $154 | $240 | $279 | $167 | $250 | $250 | $201 | $250 | $263 |
| 304E20000 AGGREGATE BASE | 227 CY | $65.00 | $55.00 | $47.89 | $57.50 | $70.00 | $55.00 | $74.00 | $129 | $71.91 |
| 407E10000 TACK COAT | 2,618 GAL | $2.00 | $2.25 | $2.21 | $2.50 | $1.75 | $1.75 | $1.75 | $2.20 | $1.84 |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $235 | $450 | $210 | $254 | $147 | $147 | $270 | $333 | $154 |
| 452E11010 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 418 SY | $50.00 | $53.00 | $57.78 | $50.00 | $50.00 | $72.00 | $50.50 | $59.00 | $67.42 |
| 608E40000 CONCRETE STEPS, TYPE A | 48 FT | $100 | $210 | $149 | $120 | $136 | $230 | $115 | $590 | $115 |
| 608E52000 CURB RAMP - TYPE A2 | 165 SF | $10.00 | $10.00 | $13.97 | $12.00 | $26.00 | $15.00 | $13.50 | $16.00 | $23.74 |
| 608E52000 CURB RAMP - TYPE B3 | 647 SF | $10.00 | $10.00 | $13.82 | $10.75 | $23.00 | $12.00 | $12.50 | $15.00 | $24.98 |
| 617E10100 COMPACTED AGGREGATE | 83 CY | $50.00 | $50.00 | $24.76 | $52.00 | $110 | $100 | $105 | $120 | $85.29 |
| 617E20000 SHOULDER PREPARATION | 1,483 SY | $2.00 | $1.00 | $15.34 | $1.75 | $6.00 | $0.79 | $1.00 | $6.00 | $10.63 |
| 638E00700 6" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, MEC | 66 FT | $175 | $250 | $104 | $233 | $300 | $120 | $112 | $205 | $596 |
| 638E01300 8" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, MEC | 18 FT | $700 | $300 | $116 | $200 | $575 | $370 | $1,400 | $500 | $637 |
| 638E01900 10" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, ME | 20 FT | $450 | $400 | $136 | $317 | $860 | $250 | $900 | $380 | $661 |
| 638E02500 12" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, ME | 8 FT | $500 | $500 | $219 | $391 | $1,275 | $390 | $1,000 | $420 | $946 |
| 638E07800 6" GATE VALVE AND VALVE BOX | 8 EACH | $1,100 | $1,200 | $1,058 | $2,010 | $850 | $780 | $700 | $1,080 | $1,765 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 21 EACH | $300 | $250 | $378 | $550 | $375 | $280 | $450 | $370 | $299 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 78 EACH | $75.00 | $30.00 | $378 | $90.00 | $345 | $190 | $175 | $240 | $299 |
| 638E98600 WATER WORK, MISC.: REPLACE LEAD WATER SERVICES, AS | 400 FT | $50.00 | $60.00 | $102 | $46.75 | $60.00 | $95.00 | $65.00 | $80.00 | $103 |
| 638E10200 6" FIRE HYDRANT | 8 EACH | $3,500 | $4,500 | $3,875 | $4,725 | $3,350 | $2,800 | $3,000 | $2,700 | $4,077 |
| 638E10480 FIRE HYDRANT REMOVED | 8 EACH | $500 | $100 | $261 | $1,200 | $330 | $305 | $375 | $1,200 | $1,083 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $65.00 | $50.00 | $31.00 | $70.00 | $31.00 | $70.00 | $65.00 | $85.00 | $68.27 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $10,000 | $6,500 | $7,020 | $17,500 | $12,000 | $6,500 | $6,500 | $5,776 |
| 614E12500 REPLACEMENT SIGN | 10 EACH | $125 | $125 | $125 | $135 | $150 | $190 | $125 | $125 | $184 |
| 614E12600 REPLACEMENT DRUM | 25 EACH | $75.00 | $55.00 | $55.00 | $59.40 | $65.00 | $44.00 | $55.00 | $55.00 | $78.77 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $150 | $300 | $173 | $182 | $240 | $220 | $185 | $250 | $201 |
| 614E13360 OBJECT MARKER, TWO WAY | 10 EACH | $9.00 | $8.95 | $8.95 | $10.00 | $18.00 | $9.00 | $8.95 | $9.00 | $18.91 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 12 SNMT | $600 | $900 | $900 | $972 | $940 | $900 | $900 | $900 | $1,103 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 2 MILE | $450 | $450 | $450 | $486 | $400 | $400 | $450 | $450 | $420 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1 MILE | $1,000 | $1,000 | $1,000 | $1,080 | $1,000 | $1,000 | $1,000 | $1,000 | $1,050 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 2 MILE | $575 | $575 | $575 | $621 | $500 | $500 | $575 | $575 | $525 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 400 FT | $3.00 | $2.80 | $2.80 | $3.02 | $3.00 | $3.00 | $2.80 | $2.80 | $3.15 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 200 FT | $2.00 | $1.95 | $1.95 | $2.11 | $2.00 | $2.00 | $1.95 | $1.95 | $2.10 |
| 621E00100 RPM | 124 EACH | $50.00 | $44.00 | $40.69 | $44.00 | $75.00 | $44.00 | $38.75 | $40.69 | $49.36 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 84 EACH | $10.00 | $3.50 | $6.20 | $28.00 | $20.00 | $10.00 | $12.00 | $6.50 | $9.52 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 426 FT | $9.00 | $8.50 | $8.50 | $9.25 | $8.50 | $8.50 | $8.50 | $8.50 | $9.45 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 200 FT | $9.00 | $8.50 | $8.50 | $9.25 | $8.50 | $8.50 | $8.50 | $8.50 | $11.03 |
| 630E80100 SIGN, FLAT SHEET | 195 SF | $15.00 | $15.00 | $15.00 | $16.20 | $15.00 | $15.00 | $15.00 | $15.00 | $15.54 |
| 630E80510 SIGN, STREET NAME | 60 EACH | $60.00 | $60.00 | $60.00 | $65.00 | $60.00 | $60.00 | $60.00 | $60.00 | $121 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 87 EACH | $7.00 | $6.50 | $6.50 | $7.00 | $6.50 | $6.50 | $6.50 | $6.50 | $10.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 51 EACH | $9.00 | $9.00 | $9.00 | $10.25 | $9.00 | $9.00 | $9.00 | $9.00 | $10.50 |
| 644E00100 EDGE LINE, 4" (WHITE) | 2.39 MILE | $2,100 | $2,100 | $2,102 | $2,300 | $2,093 | $2,902 | $2,093 | $2,093 | $3,048 |
| 644E00100 EDGE LINE, 4" (YELLOW) | 0.2 MILE | $2,100 | $2,100 | $2,100 | $2,300 | $2,100 | $2,900 | $2,100 | $2,100 | $3,046 |
| 644E00200 LANE LINE, 4" | 0.07 MILE | $2,000 | $2,000 | $2,059 | $1,950 | $1,775 | $2,574 | $1,765 | $1,765 | $2,703 |
| 644E00300 CENTER LINE (DASHED-SOLID) | 1.04 MILE | $3,900 | $3,850 | $3,861 | $4,200 | $3,850 | $6,017 | $3,824 | $3,825 | $6,320 |
| 644E00400 CHANNELIZING LINE, 8" | 380 FT | $2.00 | $1.50 | $1.50 | $1.75 | $1.50 | $1.50 | $1.50 | $1.50 | $1.58 |
| 644E00500 STOP LINE | 242 FT | $5.00 | $5.00 | $5.00 | $5.50 | $5.00 | $6.00 | $5.00 | $5.00 | $6.30 |
| 644E00600 CROSSWALK LINE | 1,176 FT | $3.00 | $2.55 | $2.55 | $2.75 | $2.60 | $2.00 | $2.55 | $2.55 | $2.10 |
| 644E00700 TRANSVERSE/DIAGONAL LINE (WHITE) | 200 FT | $5.00 | $4.50 | $4.50 | $5.00 | $4.50 | $4.00 | $4.50 | $4.50 | $4.20 |
| 644E00700 TRANSVERSE/DIAGONAL LINE (YELLOW) | 174 FT | $5.00 | $4.70 | $4.70 | $5.00 | $4.75 | $4.00 | $4.70 | $4.70 | $4.20 |
| 644E01000 RAILROAD SYMBOL MARKING | 4 EACH | $565 | $565 | $565 | $611 | $565 | $600 | $565 | $565 | $630 |
| 644E01300 LANE ARROW | 6 EACH | $85.00 | $85.00 | $85.00 | $92.00 | $85.00 | $85.00 | $85.00 | $85.00 | $89.27 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $10,000 | $2,500 | $3,049 | $36,200 | $2,500 | $1,000 | $5,000 | $3,440 | $5,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,000 | $25,000 | $15,178 | $17,000 | $15,000 | $16,000 | $30,000 | $16,000 | $75,934 |
| 619E16000 FIELD OFFICE, TYPE A | 10 MNTH | $1,600 | $200 | $1,896 | $1,400 | $2,500 | $1,780 | $1,750 | $1,300 | $1,100 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1,269 CY | $139 | $176k | 8% |
| 608E10000 4" CONCRETE WALK | 34,448 SF | $4 | $138k | 6% |
| 611E07400 18" CONDUIT, TYPE B | 869 FT | $145 | $126k | 6% |
| 611E04400 12" CONDUIT, TYPE B | 1,057 FT | $115 | $122k | 6% |
| 609E24511 CURB, TYPE 4-C, AS PER PLAN | 7,553 FT | $14 | $106k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 5% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (633 CY | $136 | $86k | 4% |
| 611E98470 CATCH BASIN, NO. 2-2B | 32 EACH | $2,200 | $70k | 3% |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 10 EACH | $6,500 | $65k | 3% |
| 611E10400 24" CONDUIT, TYPE B | 401 FT | $160 | $64k | 3% |