CUY-IR 480/Transportation Blvd
CUY County · est $4.7M
Bid dateThursday, February 1—
CUY County · est $4.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 276 more items below.
| Item | Quantity | R1Great Lakes Construction CO | R2Independence Excavating INC | R3J D Williamson Construction CO INC | R4Terrace Construction CO INC | R5Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|---|
| 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4 | 190,100 LB | $2.25 | $1.92 | $1.85 | $2.30 | $1.75 | 16% |
| 305E13010 9" CONCRETE BASE, CLASS QC1 | 5,870 SY | $60.00 | $70.00 | $74.00 | $57.00 | $63.00 | 13% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 506 CY | $600 | $850 | $450 | $590 | $450 | 11% |
| Item | Quantity | R1Great Lakes Construction CO | R2Independence Excavating INC | R3J D Williamson Construction CO INC | R4Terrace Construction CO INC | R5Karvo Companies INC |
|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $220 | $300 | $750 | $503 | $785 |
| 202E23000 PAVEMENT REMOVED | 1,543 SY | $18.00 | $10.00 | $14.00 | $11.50 | $13.75 |
| 202E23500 WEARING COURSE REMOVED | 2,337 SY | $4.00 | $5.00 | $5.00 | $4.75 | $6.00 |
| 202E30000 WALK REMOVED | 3,043 SF |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 203E10000 EXCAVATION |
| 12,695 CY |
| $15.00 |
| $6.00 |
| $20.00 |
| $12.50 |
| $20.00 |
| 7% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 155,832 LB | $1.00 | $0.78 | $0.90 | $1.25 | $1.00 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $150,000 | $150,000 | $170,000 | $353,806 | $270,000 | 6% |
| 304E20000 AGGREGATE BASE | 1,593 CY | $77.00 | $50.00 | $57.00 | $50.00 | $76.00 | 5% |
| 608E10000 4" CONCRETE WALK | 18,402 SF | $5.50 | $6.00 | $6.20 | $4.75 | $5.25 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $200,000 | $166,077 | $220,000 | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 9,750 SF | $9.00 | $9.25 | $9.40 | $10.50 | $21.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $80,000 | $35,000 | $20,000 | $43,000 | $13,500 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $80,000 | $107,000 | $175,000 | $108,120 | $292,500 | 3% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (462 CY | $165 | $170 | $170 | $197 | $173 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 397 CY | $188 | $195 | $195 | $225 | $194 | 3% |
| 809E69101 STOP-BAR RADAR DETECTION, AS PER PLAN | 10 EACH | $6,600 | $6,800 | $6,925 | $6,653 | $6,600 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 449 CY | $138 | $140 | $145 | $165 | $132 | 2% |
| 511E42010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS | 61 CY | $1,000 | $1,850 | $880 | $1,114 | $850 | 2% |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 1,367 CY | $40.00 | $45.00 | $55.00 | $44.00 | $54.00 | 2% |
| 516E12201 STRUCTURAL STEEL EXPANSION JOINT, AS PER PLAN (SLI | 54 FT | $975 | $1,100 | $500 | $655 | $500 | 2% |
| 203E20000 EMBANKMENT | 11,627 CY | $4.25 | $6.00 | $16.00 | $12.00 | $5.50 | 2% |
| $1.10 |
| $1.00 |
| $1.45 |
| $0.90 |
| $1.90 |
| 202E32000 CURB REMOVED | 2,069 FT | $2.00 | $2.00 | $4.00 | $2.25 | $4.75 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 445 FT | $12.00 | $15.00 | $11.00 | $6.00 | $22.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 8 FT | $60.00 | $20.00 | $18.00 | $41.00 | $49.00 |
| 202E38000 GUARDRAIL REMOVED | 747 FT | $1.60 | $1.50 | $1.65 | $2.00 | $1.60 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $800 | $250 | $500 | $328 | $900 |
| 202E58100 CATCH BASIN REMOVED | 12 EACH | $500 | $250 | $600 | $164 | $400 |
| 202E75000 FENCE REMOVED | 1,103 FT | $1.80 | $1.75 | $2.00 | $2.25 | $1.80 |
| 202E98100 REMOVAL MISC.:BOLLARD | 14 EACH | $120 | $40.00 | $40.00 | $33.00 | $85.00 |
| 204E10000 SUBGRADE COMPACTION | 9,609 SY | $2.00 | $1.00 | $3.50 | $0.40 | $1.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 1,367 CY | $24.00 | $15.00 | $19.00 | $20.50 | $27.00 |
| 204E45000 PROOF ROLLING | 11 HOUR | $315 | $150 | $250 | $197 | $150 |
| 606E15050 GUARDRAIL, TYPE MGS | 488 FT | $19.60 | $20.00 | $20.00 | $23.00 | $19.60 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 3 EACH | $1,895 | $1,900 | $2,000 | $2,242 | $1,895 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $775 | $800 | $800 | $917 | $775 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $2,045 | $2,100 | $2,150 | $2,420 | $2,045 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $450 | $450 | $475 | $532 | $450 |
| 607E20000 FENCE, TYPE CL | 792 FT | $18.70 | $19.00 | $20.00 | $22.00 | $18.70 |
| 608E52000 CURB RAMP | 2,636 SF | $12.00 | $12.50 | $10.00 | $13.50 | $11.00 |
| 609E16000 CURB, TYPE 2-B | 2,938 FT | $12.50 | $28.00 | $6.00 | $5.50 | $17.75 |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 159 FT | $35.00 | $50.00 | $30.00 | $30.00 | $43.00 |
| 609E26000 CURB, TYPE 6 | 1,883 FT | $19.00 | $25.00 | $16.00 | $21.00 | $12.00 |
| 609E96000 MEDIAN, MISC.:GRASS PAVER | 165 SY | $39.00 | $55.00 | $50.00 | $81.00 | $66.00 |
| 622E24840 CONCRETE BARRIER END SECTION, TYPE B | 2 EACH | $8,700 | $8,000 | $7,500 | $9,828 | $7,500 |
| 622E90000 BARRIER, MISC.:CONCRETE BARRIER, TYPE B | 132 FT | $285 | $250 | $150 | $197 | $150 |
| 690E50600 SPECIAL - BOLLARD | 68 EACH | $110 | $110 | $110 | $148 | $125 |
| 861E10000 GEOGRID FOR SUBGRADE STABILIZATION | 3,601 SY | $1.55 | $2.00 | $2.45 | $1.50 | $2.65 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 1,998 FT | $1.50 | $4.00 | $2.50 | $2.25 | $3.50 |
| 202E30700 CONCRETE BARRIER REMOVED | 80 FT | $40.00 | $40.00 | $16.00 | $26.00 | $20.00 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 6 SY | $260 | $150 | $200 | $173 | $370 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 22 CY | $140 | $112 | $175 | $226 | $165 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $50.00 | $200 | $237 | $200 |
| 659E00300 TOPSOIL | 1,753 CY | $21.00 | $15.00 | $21.00 | $25.00 | $21.00 |
| 659E10000 SEEDING AND MULCHING | 15,797 SY | $0.73 | $0.90 | $0.75 | $0.85 | $0.73 |
| 659E14000 REPAIR SEEDING AND MULCHING | 790 SY | $1.00 | $0.90 | $1.00 | $1.25 | $1.00 |
| 659E15000 INTER-SEEDING | 790 SY | $0.10 | $0.90 | $0.40 | $0.12 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 2.2 TON | $700 | $600 | $730 | $828 | $700 |
| 659E31000 LIME | 3.26 ACRE | $0.10 | $30.00 | $30.00 | $59.00 | $0.01 |
| 659E35000 WATER | 88 MGAL | $0.10 | $1.00 | $1.00 | $1.25 | $0.01 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $5,000 | $1,500 | $6,439 | $1,155 |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $15,000 | $20,000 | $25,000 | $17,220 | $19,105 |
| 602E20000 CONCRETE MASONRY | 2 CY | $2,100 | $1,000 | $3,000 | $2,184 | $2,290 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 746 FT | $15.00 | $14.00 | $12.00 | $10.00 | $13.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, 7 | 3,173 FT | $12.00 | $14.00 | $12.00 | $10.00 | $12.00 |
| 605E31100 AGGREGATE DRAINS | 20 FT | $7.00 | $15.00 | $12.00 | $23.50 | $15.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 275 FT | $27.00 | $30.00 | $20.00 | $14.00 | $22.00 |
| 611E00900 6" CONDUIT, TYPE B | 70 FT | $17.00 | $40.00 | $25.00 | $42.00 | $51.00 |
| 611E01100 6" CONDUIT, TYPE C | 142 FT | $17.00 | $30.00 | $16.00 | $32.00 | $19.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $14.00 | $40.00 | $15.00 | $28.00 | $12.00 |
| 611E01800 8" CONDUIT, TYPE B | 50 FT | $27.00 | $42.00 | $30.00 | $47.00 | $44.00 |
| 611E02000 8" CONDUIT, TYPE C | 50 FT | $18.00 | $42.00 | $25.00 | $33.00 | $19.00 |
| 611E04400 12" CONDUIT, TYPE B | 426 FT | $93.00 | $65.00 | $95.00 | $89.00 | $108 |
| 611E04600 12" CONDUIT, TYPE C | 463 FT | $80.00 | $50.00 | $50.00 | $90.00 | $72.50 |
| 611E05900 15" CONDUIT, TYPE B | 27 FT | $140 | $110 | $160 | $192 | $180 |
| 611E06100 15" CONDUIT, TYPE C | 10 FT | $173 | $85.00 | $90.00 | $143 | $180 |
| 611E13600 30" CONDUIT, TYPE C | 95 FT | $145 | $120 | $90.00 | $161 | $115 |
| 611E20900 48" CONDUIT, TYPE B | 8 FT | $370 | $410 | $400 | $365 | $1,000 |
| 611E98150 CATCH BASIN, NO. 3 | 9 EACH | $3,350 | $2,600 | $3,500 | $3,481 | $4,700 |
| 611E98180 CATCH BASIN, NO. 3A | 7 EACH | $2,350 | $2,300 | $2,100 | $2,717 | $3,000 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $2,150 | $2,200 | $2,500 | $2,647 | $2,900 |
| 611E98470 CATCH BASIN, NO. 2-2B | 4 EACH | $1,400 | $2,200 | $1,250 | $2,304 | $2,000 |
| 611E98571 CATCH BASIN, NO. 2-5, AS PER PLAN | 1 EACH | $8,100 | $7,400 | $6,500 | $5,028 | $8,100 |
| 611E99574 MANHOLE, NO. 3 | 11 EACH | $3,000 | $3,600 | $2,500 | $5,494 | $4,300 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $600 | $800 | $500 | $941 | $1,000 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 4 EACH | $2,650 | $1,800 | $1,350 | $1,041 | $1,200 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 5 EACH | $300 | $825 | $240 | $346 | $230 |
| 407E13900 TACK COAT, 702.13 | 803 GAL | $3.80 | $4.00 | $4.00 | $4.50 | $2.75 |
| 407E20000 NON-TRACKING TACK COAT | 1,353 GAL | $7.30 | $8.00 | $7.65 | $8.50 | $3.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $288 | $300 | $300 | $345 | $325 |
| 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (8 CY | $220 | $230 | $230 | $263 | $255 |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 54 CY | $230 | $240 | $240 | $275 | $255 |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 62 CY | $190 | $200 | $200 | $227 | $215 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 82 SY | $74.00 | $115 | $85.00 | $72.00 | $87.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 534 LB | $1.25 | $1.00 | $1.30 | $1.50 | $4.85 |
| 638E03000 16" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, PU | 231 FT | $155 | $225 | $165 | $244 | $255 |
| 638E04900 1" COPPER SERVICE BRANCH | 50 FT | $29.00 | $48.00 | $20.00 | $58.00 | $24.00 |
| 638E05000 1-1/2" COPPER SERVICE BRANCH | 50 FT | $30.00 | $55.00 | $30.00 | $61.00 | $25.00 |
| 638E05100 2" COPPER SERVICE BRANCH | 50 FT | $36.00 | $62.00 | $30.00 | $66.00 | $30.00 |
| 638E07480 6" GATE VALVE | 4 EACH | $1,265 | $1,500 | $1,000 | $880 | $2,100 |
| 638E10200 6" FIRE HYDRANT | 4 EACH | $6,570 | $4,600 | $4,000 | $7,400 | $5,200 |
| 638E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE | 1 EACH | $3,570 | $2,000 | $1,600 | $2,955 | $3,100 |
| 638E10480 FIRE HYDRANT REMOVED | 4 EACH | $1,250 | $400 | $800 | $2,960 | $800 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 5 EACH | $150 | $225 | $150 | $428 | $500 |
| 638E98000 WATER WORK, MISC.:16" PCCP TO DIP ADAPTOR/CLOSURE | 2 EACH | $4,800 | $5,500 | $6,500 | $8,072 | $10,000 |
| 638E98000 WATER WORK, MISC.:EXTEND WATER SERVICE CONNECTION | 8 EACH | $1,800 | $845 | $700 | $2,683 | $1,000 |
| 638E98000 WATER WORK, MISC.:RETAP AND RECONNECT 1" WATER SER | 1 EACH | $2,600 | $1,065 | $1,250 | $2,757 | $3,900 |
| 638E98000 WATER WORK, MISC.:RETAP AND RECONNECT 1-1/2" WATER | 1 EACH | $3,500 | $1,910 | $1,600 | $4,391 | $5,000 |
| 638E98000 WATER WORK, MISC.:RETAP AND RECONNECT 2" WATER SER | 1 EACH | $4,800 | $2,190 | $2,100 | $4,861 | $5,400 |
| 638E98000 WATER WORK, MISC.:TEMPORARY SERVICE CONNECTION | 4 EACH | $1,450 | $2,795 | $500 | $790 | $2,200 |
| 638E98000 WATER WORK, MISC.:WATER METER ADJUSTED TO GRADE | 1 EACH | $1,650 | $785 | $500 | $242 | $800 |
| 638E98100 WATER WORK, MISC.:AS-BUILT WATERLINE DRAWINGS | 1 LS | $1,500 | $1,000 | $2,000 | $1,466 | $4,800 |
| 638E98100 WATER WORK, MISC.:CITY OF CLEVELAND WATER DEPARTME | 1 LS | $23,000 | $12,500 | $5,000 | $10,000 | $20,000 |
| 638E98600 WATER WORK, MISC.:6" WATER MAIN DUCTILE IRON PIPE | 50 FT | $125 | $90.00 | $40.00 | $58.00 | $185 |
| 638E98600 WATER WORK, MISC.:8" WATER MAIN DUCTILE IRON PIPE | 50 FT | $145 | $96.00 | $45.00 | $65.00 | $195 |
| 638E98600 WATER WORK, MISC.:WATER MAIN REMOVED | 210 FT | $36.00 | $39.00 | $20.00 | $36.00 | $69.00 |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN (SANIT | 3 EACH | $2,650 | $2,500 | $3,000 | $858 | $1,500 |
| 625E00450 CONNECTION, FUSED PULL APART | 50 EACH | $80.00 | $83.00 | $85.00 | $80.00 | $80.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 63 EACH | $80.00 | $83.00 | $85.00 | $75.00 | $80.00 |
| 625E00481 CONNECTION, UNFUSED PERMANENT, AS PER PLAN | 1 EACH | $90.00 | $93.00 | $95.00 | $229 | $90.00 |
| 625E10490 LIGHT POLE, CONVENTIONAL, A25, B35 | 4 EACH | $2,885 | $3,000 | $3,000 | $2,250 | $2,885 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT10, B35 | 2 EACH | $1,725 | $1,800 | $1,800 | $1,759 | $1,725 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15, B35 | 8 EACH | $1,860 | $1,935 | $1,950 | $1,859 | $1,860 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT20, B35 | 1 EACH | $2,100 | $2,185 | $2,200 | $2,143 | $2,100 |
| 625E14500 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 18 EACH | $1,650 | $1,715 | $1,730 | $1,117 | $1,650 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 4,401 FT | $2.50 | $2.50 | $2.60 | $2.25 | $2.50 |
| 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE | 1,400 FT | $3.00 | $3.00 | $3.00 | $2.75 | $3.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 3,735 FT | $1.30 | $1.30 | $1.35 | $0.70 | $1.30 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 993 FT | $8.00 | $8.00 | $8.35 | $10.50 | $8.00 |
| 625E25408 CONDUIT, 2", 725.051 | 1,149 FT | $7.00 | $7.00 | $7.30 | $10.00 | $7.00 |
| 625E25600 CONDUIT, 4", 725.04 | 488 FT | $23.00 | $23.00 | $24.00 | $20.50 | $23.00 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, TYPE II, 200 | 2 EACH | $300 | $310 | $310 | $315 | $300 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, TYPE III, 20 | 9 EACH | $300 | $310 | $310 | $315 | $300 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, TYPE III, 25 | 4 EACH | $300 | $310 | $310 | $309 | $300 |
| 625E27501 LUMINAIRE, UNDERPASS, AS PER PLAN, 100W, HPS | 4 EACH | $425 | $440 | $445 | $898 | $425 |
| 625E29002 TRENCH, 24" DEEP | 1,583 FT | $10.00 | $10.50 | $10.25 | $5.00 | $10.00 |
| 625E30700 PULL BOX, 725.08, 18" | 15 EACH | $750 | $780 | $785 | $519 | $750 |
| 625E32000 GROUND ROD | 22 EACH | $235 | $240 | $245 | $115 | $235 |
| 625E34001 POWER SERVICE, AS PER PLANA | 1 EACH | $5,100 | $5,300 | $5,350 | $4,228 | $5,100 |
| 625E36000 PLASTIC CAUTION TAPE | 1,583 FT | $0.50 | $0.50 | $0.50 | $0.40 | $0.50 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $13,500 | $15,000 | $14,150 | $29,491 | $16,500 |
| 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT | 1 EACH | $300 | $310 | $310 | $1,944 | $300 |
| 625E75400 LIGHT POLE REMOVED | 13 EACH | $250 | $260 | $260 | $469 | $250 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 11 EACH | $150 | $150 | $155 | $277 | $150 |
| 625E75506 LUMINAIRE REMOVED | 13 EACH | $50.00 | $50.00 | $52.00 | $55.00 | $50.00 |
| 625E98000 LIGHTING, MISC.: AREA LUMINAIRE AND POLE | 7 EACH | $3,550 | $3,700 | $3,720 | $3,250 | $3,550 |
| 625E98000 LIGHTING, MISC.: CAMERA RELOCATION | 2 EACH | $3,400 | $3,600 | $3,550 | $4,572 | $3,400 |
| 625E34001 POWER SERVICE, AS PER PLANB | 1 EACH | $8,200 | $8,500 | $8,600 | $3,924 | $8,200 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 2 EACH | $45.00 | $45.00 | $100 | $57.00 | $75.00 |
| 620E31200 REMOVAL OF DELINEATOR | 2 EACH | $10.00 | $11.00 | $25.00 | $13.00 | $50.00 |
| 621E00100 RPM | 62 EACH | $67.50 | $75.00 | $75.00 | $92.00 | $72.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 62 EACH | $8.73 | $25.00 | $20.00 | $41.00 | $10.00 |
| 625E32000 GROUND ROD | 3 EACH | $235 | $240 | $245 | $115 | $155 |
| 630E02101 GROUND MOUNTED SUPPORT, NO. 2 POST, AS PER PLAN | 440.6 FT | $8.50 | $9.00 | $9.00 | $10.50 | $9.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 226.3 FT | $10.00 | $10.00 | $10.00 | $11.00 | $9.50 |
| 630E04101 GROUND MOUNTED SUPPORT, NO. 4 POST, AS PER PLAN | 16.1 FT | $11.50 | $11.00 | $12.00 | $12.50 | $10.50 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 34.2 FT | $26.00 | $19.00 | $27.00 | $21.50 | $18.00 |
| 630E08005 ONE WAY SUPPORT, NO. 3 POST, AS PER PLAN | 28.1 FT | $10.50 | $9.00 | $11.00 | $10.50 | $9.00 |
| 630E08600 SIGN POST REFLECTOR | 5 EACH | $35.00 | $45.00 | $40.00 | $53.00 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $235 | $350 | $250 | $414 | $350 |
| 630E11102 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 11 | 1 EACH | $8,250 | $8,900 | $8,650 | $7,584 | $8,500 |
| 630E20400 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 4 | 1 EACH | $9,925 | $9,900 | $10,400 | $9,179 | $9,500 |
| 630E20500 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 5 | 1 EACH | $10,450 | $10,900 | $12,000 | $9,757 | $10,500 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 1 EACH | $295 | $230 | $310 | $266 | $225 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 6 EACH | $395 | $460 | $415 | $532 | $450 |
| 630E79200 SIGN ATTACHMENT ASSEMBLY, MAST ARM | 7 EACH | $300 | $230 | $300 | $266 | $225 |
| 630E80100 SIGN, FLAT SHEET | 426.5 SF | $13.00 | $15.00 | $13.60 | $18.00 | $15.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 48 SF | $18.50 | $18.00 | $19.50 | $21.50 | $18.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 130 SF | $19.00 | $19.00 | $20.00 | $22.50 | $19.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $750 | $900 | $790 | $1,006 | $850 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 3 EACH | $3,650 | $4,250 | $3,850 | $3,547 | $4,200 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 29 EACH | $10.00 | $15.00 | $10.00 | $18.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $45.00 | $80.00 | $45.00 | $89.00 | $75.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 1 EACH | $220 | $100 | $230 | $118 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 32 EACH | $10.00 | $25.00 | $10.00 | $30.00 | $25.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $185 | $155 | $195 | $177 | $150 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 2 EACH | $375 | $100 | $395 | $118 | $100 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 8 EACH | $200 | $50.00 | $200 | $59.00 | $50.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 13 EACH | $30.00 | $18.00 | $30.00 | $21.50 | $18.00 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 3 EACH | $95.00 | $75.00 | $100 | $89.00 | $75.00 |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 2 EACH | $1,325 | $1,200 | $1,400 | $673 | $1,200 |
| 646E10000 EDGE LINE, 4" | 0.65 MILE | $4,215 | $2,800 | $2,950 | $3,313 | $2,800 |
| 646E10100 LANE LINE, 4" | 1.07 MILE | $3,535 | $1,500 | $1,550 | $1,775 | $1,500 |
| 646E10200 CENTER LINE | 1.06 MILE | $5,820 | $4,800 | $5,000 | $5,679 | $4,800 |
| 646E10300 CHANNELIZING LINE, 8" | 5,777 FT | $1.75 | $1.80 | $1.90 | $2.25 | $1.80 |
| 646E10400 STOP LINE | 595 FT | $9.80 | $12.00 | $11.50 | $13.00 | $11.00 |
| 646E10500 CROSSWALK LINE | 1,728 FT | $5.80 | $5.00 | $5.00 | $5.50 | $4.75 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 773 FT | $7.75 | $8.00 | $8.00 | $9.50 | $8.00 |
| 646E10800 ISLAND MARKING | 114 SF | $4.65 | $4.00 | $4.00 | $4.75 | $4.00 |
| 646E20300 LANE ARROW | 110 EACH | $150 | $150 | $150 | $172 | $145 |
| 646E20500 DOTTED LINE | 1,378 FT | $1.70 | $4.00 | $4.00 | $4.75 | $4.00 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 17 EACH | $100 | $100 | $100 | $174 | $100 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 1,551 FT | $3.00 | $2.00 | $2.00 | $5.00 | $2.00 |
| 646E50200 REMOVAL OF PAVEMENT MARKING | 22 SF | $1.50 | $3.00 | $3.00 | $2.50 | $3.00 |
| 646E50300 REMOVAL OF PAVEMENT MARKING | 0.28 MILE | $2,640 | $4,000 | $3,850 | $4,605 | $3,700 |
| 625E25400 CONDUIT, 2", 725.04 | 335 FT | $13.00 | $14.00 | $13.50 | $12.50 | $13.00 |
| 625E25500 CONDUIT, 3", 725.04 | 78 FT | $20.00 | $20.00 | $20.00 | $28.00 | $20.00 |
| 625E25600 CONDUIT, 4", 725.04 | 56 FT | $23.00 | $24.00 | $24.00 | $32.00 | $23.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 661 FT | $45.00 | $46.50 | $47.00 | $40.00 | $45.00 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 484 FT | $0.10 | $0.10 | $0.10 | $2.50 | $0.10 |
| 625E29000 TRENCH | 349 FT | $10.00 | $10.00 | $10.00 | $6.50 | $10.00 |
| 625E29500 TRENCH IN PAVED AREA, TYPE A | 39 FT | $14.00 | $15.00 | $14.50 | $112 | $14.00 |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $750 | $770 | $785 | $549 | $750 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $900 | $920 | $940 | $715 | $900 |
| 625E32000 GROUND ROD | 15 EACH | $235 | $240 | $245 | $115 | $235 |
| 625E36000 PLASTIC CAUTION TAPE | 388 FT | $0.50 | $0.50 | $0.50 | $0.30 | $0.50 |
| 632E04000 VEHICULAR SIGNAL HEAD, MISC.:VEHICULAR SIGNAL HEAD | 7 EACH | $725 | $750 | $760 | $630 | $725 |
| 632E04000 VEHICULAR SIGNAL HEAD, MISC.:VEHICULAR SIGNAL HEAD | 5 EACH | $1,100 | $1,120 | $1,150 | $980 | $1,100 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 10 EACH | $1,000 | $1,020 | $1,040 | $735 | $1,000 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 6 EACH | $1,500 | $1,540 | $1,550 | $1,166 | $1,500 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 16 EACH | $600 | $620 | $625 | $337 | $600 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 28 EACH | $30.00 | $30.00 | $31.00 | $72.00 | $30.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 16 EACH | $20.00 | $20.00 | $20.00 | $11.00 | $20.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 16 EACH | $250 | $250 | $260 | $230 | $250 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 3,420 FT | $2.60 | $2.50 | $2.70 | $2.25 | $2.60 |
| 632E40900 SIGNAL CABLE, 9 CONDUCTOR, NO. 14 AWG | 1,923 FT | $2.70 | $2.80 | $2.80 | $2.50 | $2.70 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 8 EACH | $4,150 | $4,300 | $4,350 | $4,033 | $4,350 |
| 632E64020 PEDESTAL FOUNDATION | 7 EACH | $700 | $725 | $730 | $600 | $700 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 105 FT | $2.00 | $2.00 | $2.00 | $4.00 | $2.00 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 407 FT | $2.00 | $2.00 | $2.00 | $4.75 | $2.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 2 EACH | $1,350 | $1,400 | $1,415 | $1,401 | $1,350 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 2 EACH | $400 | $410 | $415 | $446 | $400 |
| 632E80203 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 2, AS PER PL | 2 EACH | $3,200 | $3,325 | $3,350 | $4,180 | $3,300 |
| 632E80403 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 4, AS PER PL | 2 EACH | $5,200 | $5,400 | $5,450 | $6,763 | $5,300 |
| 632E80503 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11, AS PER P | 2 EACH | $6,800 | $7,000 | $7,135 | $7,289 | $6,800 |
| 632E80603 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 12, AS PER P | 2 EACH | $8,200 | $8,500 | $8,600 | $8,210 | $8,200 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 7 EACH | $450 | $465 | $470 | $355 | $450 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 2 EACH | $1,200 | $1,225 | $1,250 | $2,918 | $1,200 |
| 632E90400 SIGNALIZATION, MISC.:TEST HOLE PERFORMED | 8 EACH | $75.00 | $76.00 | $75.00 | $641 | $75.00 |
| 633E45000 GPS (GLOBAL POSITIONING SYSTEM) CLOCK ASSEMBLY | 5 EACH | $700 | $725 | $730 | $720 | $700 |
| 633E65520 CABINET, TYPE 332 | 2 EACH | $9,000 | $9,300 | $9,400 | $8,383 | $9,000 |
| 633E67100 CABINET FOUNDATION | 2 EACH | $2,100 | $2,190 | $2,200 | $1,169 | $2,100 |
| 633E67200 CONTROLLER WORK PAD | 2 EACH | $450 | $465 | $475 | $305 | $450 |
| 633E67301 PREEMPTION, AS PER PLAN | 2 EACH | $2,100 | $2,180 | $2,200 | $2,157 | $2,100 |
| 633E67310 PREEMPTION RECEIVING UNIT | 8 EACH | $750 | $770 | $785 | $694 | $750 |
| 633E67320 PREEMPTION DETECTOR CABLE | 1,539 FT | $2.00 | $2.00 | $2.00 | $1.75 | $2.00 |
| 633E67350 PREEMPTION PHASE SELECTOR | 2 EACH | $1,800 | $1,860 | $1,880 | $1,766 | $1,800 |
| 633E67401 PREEMPTION CONFIRMATION LIGHT, AS PER PLAN | 8 EACH | $450 | $465 | $470 | $583 | $450 |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 1 EACH | $7,200 | $7,400 | $7,550 | $7,245 | $7,200 |
| AA2 633E99000 CONTROLLER ITEM, MISC.: CONTROLLER UNIT, TYPE 2070 | 2 EACH | $4,000 | $4,000 | $5,500 | $3,809 | $3,885 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $70.00 | $55.00 | $70.00 | $90.00 | $60.00 |
| 614E11500 WORKSITE TRAFFIC SUPERVISOR | 4 MNTH | $2,887 | $2,000 | $5,500 | $11,046 | $2,000 |
| 614E11630 INCREASED BARRIER DELINEATION | 270 FT | $0.72 | $2.00 | $2.50 | $3.00 | $2.30 |
| 614E12348 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL)24" | 5 EACH | $1,895 | $2,300 | $2,000 | $2,242 | $1,895 |
| 614E12500 REPLACEMENT SIGN | 12 EACH | $57.00 | $244 | $130 | $410 | $125 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 15 CY | $384 | $415 | $250 | $237 | $365 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 16 EACH | $7.40 | $8.00 | $16.00 | $14.00 | $15.50 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 41 EACH | $6.15 | $7.00 | $12.50 | $12.00 | $12.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 41 EACH | $12.10 | $12.00 | $11.50 | $19.00 | $12.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 16 EACH | $18.45 | $15.00 | $14.00 | $22.50 | $15.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $600 | $1,050 | $1,000 | $1,831 | $950 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.33 MILE | $2,845 | $2,900 | $3,000 | $4,962 | $1,383 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.31 MILE | $3,105 | $3,200 | $3,250 | $5,415 | $11,060 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.05 MILE | $2,960 | $3,100 | $3,100 | $5,163 | $5,530 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 909 FT | $0.55 | $0.50 | $0.60 | $0.95 | $0.75 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 230 FT | $0.50 | $0.50 | $0.60 | $0.85 | $1.00 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 64 FT | $2.25 | $2.25 | $2.50 | $4.00 | $5.50 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 63 FT | $2.50 | $2.55 | $2.60 | $4.25 | $5.50 |
| 614E30000 WORK ZONE ARROW, CLASS I | 8 EACH | $55.00 | $56.00 | $60.00 | $96.00 | $60.00 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I | 25 SF | $2.00 | $2.00 | $2.00 | $3.50 | $3.50 |
| 616E10000 WATER | 120 MGAL | $56.92 | $15.00 | $5.00 | $6.00 | $10.00 |
| 622E41000 PORTABLE BARRIER, 32" | 2,040 FT | $12.29 | $20.00 | $15.00 | $17.50 | $22.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 430 FT | $21.16 | $38.00 | $22.00 | $26.00 | $34.00 |
| 202E22901 APPROACH SLAB REMOVED, AS PER PLAN | 34 SY | $65.00 | $75.00 | $60.00 | $79.00 | $60.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $70,000 | $15,000 | $19,656 | $15,000 |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $40,000 | $35,000 | $30,000 | $39,312 | $30,000 |
| 503E31120 SHALE EXCAVATION | 53 CY | $40.00 | $125 | $150 | $197 | $150 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $0.75 | $4.00 | $2.00 | $2.50 | $2.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 1,596 EACH | $25.00 | $15.00 | $19.50 | $26.00 | $19.50 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 41 CY | $800 | $780 | $925 | $1,212 | $925 |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 76 CY | $600 | $1,250 | $600 | $786 | $600 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 52 CY | $400 | $375 | $400 | $524 | $400 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 400 SY | $8.00 | $6.00 | $10.00 | $13.00 | $10.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 620 SY | $15.00 | $14.00 | $20.00 | $26.00 | $20.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 10 SY | $18.33 | $60.00 | $30.00 | $39.00 | $30.00 |
| 512E33000 TYPE 2 WATERPROOFING | 22 SY | $25.00 | $24.00 | $20.00 | $26.00 | $20.00 |
| 514E00051 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, | 1,000 SF | $10.00 | $10.30 | $10.00 | $12.00 | $15.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 9,750 SF | $5.00 | $5.15 | $5.00 | $6.00 | $6.00 |
| 514E10000 FINAL INSPECTION REPAIR | 9 EACH | $1.00 | $1.00 | $1.00 | $1.25 | $300 |
| 516E46000 BEARING DEVICE, BOLSTER (B-275) | 2 EACH | $2,200 | $2,700 | $2,200 | $2,883 | $2,200 |
| 516E46200 BEARING DEVICE, ROCKER (R-100) | 4 EACH | $1,500 | $1,800 | $1,500 | $1,966 | $1,500 |
| 516E46200 BEARING DEVICE, ROCKER (R-250) | 6 EACH | $2,200 | $2,700 | $2,200 | $2,948 | $2,250 |
| 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 4 EACH | $1,900 | $2,918 | $2,600 | $3,407 | $2,600 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 60 CY | $85.00 | $70.00 | $75.00 | $98.00 | $75.00 |
| 518E40001 6" PERFORATED CORRUGATED PLASTIC PIPE, AS PER PLAN | 35 FT | $10.00 | $20.00 | $17.00 | $22.50 | $17.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 50 FT | $25.00 | $20.00 | $16.00 | $21.00 | $16.00 |
| 526E15011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 40 SY | $260 | $260 | $285 | $393 | $300 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 50 SY | $275 | $235 | $280 | $380 | $290 |
| 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 436 FT | $85.70 | $95.00 | $93.00 | $101 | $95.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $48,800 | $50,000 | $50,000 | $26,459 | $65,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $1,000 | $15,000 | $5,000 | $4,910 | $14,500 |
| 619E16020 FIELD OFFICE, TYPE C | 10 MNTH | $2,000 | $1,000 | $2,400 | $2,070 | $1,750 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $44,000 | $40,000 | $60,000 | $14,357 | $69,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4 | 190,100 LB | $2.25 | $428k | 9% |
| 305E13010 9" CONCRETE BASE, CLASS QC1 | 5,870 SY | $60 | $352k | 7% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 506 CY | $600 | $304k | 6% |
| 203E10000 EXCAVATION | 12,695 CY | $15 | $190k | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 155,832 LB | $1 | $156k | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $150,000 | $150k | 3% |
| 304E20000 AGGREGATE BASE | 1,593 CY | $77 | $123k | 3% |
| 608E10000 4" CONCRETE WALK | 18,402 SF | $5.5 | $101k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 2% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 9,750 SF | $9 | $88k | 2% |