CUY-SR 176-12.83
CUY County · est $1.1M
Bid dateThursday, January 25—
CUY County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 64 more items below.
| Item | Quantity | R1Chagrin Valley Paving INC | R2Burton Scot Contractors LLC | R3Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,770 CY | $175 | $200 | $208 | 29% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $148,250 | $120,475 | $161,650 | 14% |
| 606E15050 GUARDRAIL, TYPE MGS | 5,950 FT | $18.40 | $18.40 | $18.40 | 10% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 360 FT | $225 | $185 | $168 | 8% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 42,472 SY |
| Item | Quantity | R1Chagrin Valley Paving INC | R2Burton Scot Contractors LLC | R3Kokosing Construction Company INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100 | $2,000 | $5,000 |
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 14 FT | $50.00 | $90.00 | $84.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 35 FT | $40.00 | $20.00 | $14.00 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 500 FT | $11.00 | $27.00 | $10.65 |
| 203E10001 EXCAVATION, AS PER PLAN | 22 CY | $100 | $130 | $124 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.90 |
| $1.95 |
| $2.00 |
| 7% |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (220 CY | $230 | $225 | $218 | 5% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 500 SY | $100 | $75.00 | $195 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $49,300 | $40,000 | $40,000 | 5% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 19 EACH | $1,500 | $650 | $650 | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 810 FT | $34.41 | $34.00 | $25.00 | 3% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $90.00 | $60.00 | $80.00 | 2% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 9 EACH | $1,965 | $1,965 | $1,965 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 9 EACH | $1,845 | $1,845 | $1,845 | 2% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 150 SY | $90.00 | $65.00 | $195 | 1% |
| 622E25051 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 3 EACH | $4,250 | $3,800 | $3,700 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 6,371 GAL | $2.00 | $2.90 | $2.00 | 1% |
| 646E10010 EDGE LINE, 6" | 3.99 MILE | $3,045 | $3,200 | $3,200 | 1% |
| 622E25001 CONCRETE BARRIER END SECTION, TYPE D, AS PER PLAN | 3 EACH | $3,990 | $3,900 | $3,885 | 1% |
| 202E38000 GUARDRAIL REMOVED | 6,812.5 FT | $1.60 | $1.60 | $1.60 | 1% |
| 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 15 SNMT | $675 | $675 | $675 | 1% |
| 35 CY |
| $100 |
| $112 |
| $115 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 66.91 STA | $140 | $120 | $140 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 20.25 STA | $100 | $275 | $600 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 5 EACH | $750 | $750 | $750 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 3 EACH | $435 | $435 | $435 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 611E05900 15" CONDUIT, TYPE B | 35 FT | $100 | $190 | $185 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $1,500 | $675 | $600 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $1.50 | $2.50 | $1.25 |
| 611E99900 DRAINAGE STRUCTURE, MISC.: CLEANOUT | 3 EACH | $900 | $675 | $450 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 12.55 CY | $150 | $300 | $450 |
| 618E40601 RUMBLE STRIPS, (ASPHALT CONCRETE), AS PER PLAN | 2.02 MILE | $3,345 | $4,200 | $2,970 |
| 690E98300 SPECIAL - PAVEMENT GROOVING | 1,240 SY | $2.50 | $23.00 | $2.50 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 2,104 LB | $2.00 | $3.75 | $0.70 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED, TYPE C | 9 EACH | $65.00 | $65.00 | $65.00 |
| 621E00100 RPM | 301 EACH | $29.80 | $30.00 | $29.80 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 166 EACH | $1.00 | $8.00 | $2.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE WAY | 8 EACH | $7.05 | $7.05 | $7.05 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 83 EACH | $6.40 | $6.40 | $6.40 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 3 EACH | $1,000 | $1,200 | $1,200 |
| 646E10110 LANE LINE, 6" | 1.45 MILE | $2,365 | $1,800 | $1,800 |
| 646E10300 CHANNELIZING LINE, 8" | 972 FT | $2.00 | $1.90 | $1.90 |
| 646E10310 CHANNELIZING LINE, 12" | 3,305 FT | $2.25 | $2.50 | $2.50 |
| 646E10400 STOP LINE | 62 FT | $9.95 | $11.00 | $11.00 |
| 646E10500 CROSSWALK LINE | 385 FT | $6.10 | $4.75 | $4.75 |
| 646E10620 CHEVRON MARKING | 18 FT | $8.50 | $9.00 | $9.00 |
| 646E10800 ISLAND MARKING | 4 SF | $5.00 | $10.00 | $10.00 |
| 646E20300 LANE ARROW | 21 EACH | $175 | $145 | $145 |
| 646E20320 WRONG WAY ARROW | 4 EACH | $500 | $195 | $195 |
| 646E20504 DOTTED LINE, 6" | 2,311 FT | $1.95 | $1.50 | $1.50 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 10 EACH | $200 | $100 | $100 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 4,278 FT | $0.80 | $0.50 | $0.50 |
| 614E11500 WORKSITE TRAFFIC SUPERVISOR | 4 MNTH | $500 | $500 | $900 |
| 614E12346 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), 24" | 3 EACH | $2,200 | $2,200 | $2,200 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 5 EACH | $185 | $200 | $185 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 25 CY | $250 | $175 | $200 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 19 EACH | $7.05 | $6.00 | $6.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 16 EACH | $10.00 | $10.00 | $10.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $900 | $900 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 1.45 MILE | $645 | $600 | $600 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.45 MILE | $625 | $600 | $600 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 3.43 MILE | $760 | $700 | $700 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 3.43 MILE | $740 | $700 | $700 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 126 FT | $0.55 | $0.85 | $0.85 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 3,305 FT | $0.65 | $1.05 | $1.05 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 126 FT | $0.50 | $0.85 | $0.85 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 3,305 FT | $0.60 | $1.05 | $1.05 |
| 614E24201 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, AS PER | 2,053 FT | $0.50 | $0.75 | $0.75 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT | 2,053 FT | $0.45 | $0.75 | $0.75 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 26 FT | $2.50 | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 26 FT | $2.40 | $3.00 | $3.00 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 179 FT | $2.10 | $1.50 | $1.50 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 179 FT | $2.00 | $1.50 | $1.50 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 6 EACH | $45.00 | $50.00 | $50.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 6 EACH | $40.00 | $50.00 | $50.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $17.00 | $17.00 | $17.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $10,500 | $6,000 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $750 | $1,375 | $2,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $5,000 | $2,500 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,770 CY | $175 | $310k | 25% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $148,250 | $148k | 12% |
| 606E15050 GUARDRAIL, TYPE MGS | 5,950 FT | $18.4 | $109k | 9% |
| 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA | 360 FT | $225 | $81k | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 42,472 SY | $1.9 | $81k | 7% |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (220 CY | $230 | $51k | 4% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 500 SY | $100 | $50k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $49,300 | $49k | 4% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 19 EACH | $1,500 | $29k | 2% |
| 622E41000 PORTABLE BARRIER, 32" | 810 FT | $34.41 | $28k | 2% |