CUY-IR 480-22.41 EB
CUY County · est $6.7M
Bid dateThursday, February 1—
CUY County · est $6.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 172 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Karvo Companies INC | R3Great Lakes Construction CO | R4Fabrizi Trucking & Paving CO INC | % of bid |
|---|---|---|---|---|---|---|
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 8,981 CY | $133 | $139 | $160 | $176 | 23% |
| 305E14020 10" CONCRETE BASE, CLASS QC1 WITH QC/QA | 11,652 SY | $65.75 | $61.00 | $65.50 | $82.00 | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $420,000 | $315,000 | $190,000 | $245,215 | 8% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,700 CY | $155 | $186 | $195 |
| Item | Quantity | R1Kokosing Construction Company INC | R2Karvo Companies INC | R3Great Lakes Construction CO | R4Fabrizi Trucking & Paving CO INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $40,000 | $14,000 | $70,000 | $10,000 |
| 202E30000 WALK REMOVED | 209 SF | $2.20 | $3.65 | $2.00 | $3.00 |
| 202E30600 CONCRETE MEDIAN REMOVED | 3,226 SY | $8.35 | $5.30 | $6.50 | $18.00 |
| 202E30700 CONCRETE BARRIER REMOVED | 380 FT | $20.00 | $71.45 | $63.00 | $30.00 |
| 202E32000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $215 |
| 8% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,745 CY | $175 | $196 | $180 | $200 | 6% |
| 622E41000 PORTABLE BARRIER, 32" | 27,404 FT | $8.00 | $10.00 | $10.50 | $27.00 | 4% |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 5,776 CY | $37.00 | $58.00 | $48.00 | $55.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $280,000 | $200,000 | $455,000 | 4% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 12,692 FT | $15.00 | $9.00 | $12.00 | $10.00 | 4% |
| 622E10060 CONCRETE BARRIER, SINGLE SLOPE, TYPE B | 2,697 FT | $65.00 | $59.00 | $70.00 | $108 | 3% |
| 611E98801 INLET, NO. 3B, AS PER PLAN | 18 EACH | $9,400 | $8,500 | $11,500 | $15,550 | 3% |
| 202E23000 PAVEMENT REMOVED | 8,154 SY | $18.00 | $11.75 | $15.00 | $15.00 | 3% |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 15.22 MILE | $9,300 | $6,500 | $7,915 | $10,500 | 3% |
| 304E20000 AGGREGATE BASE | 2,228 CY | $54.00 | $72.00 | $80.00 | $60.00 | 2% |
| 202E23500 WEARING COURSE REMOVED | 106,907 SY | $1.00 | $2.95 | $2.75 | $3.00 | 2% |
| 611E96600 CONDUIT, BORED OR JACKED, TYPE B, 15" | 335 FT | $300 | $266 | $275 | $290 | 2% |
| 611E05900 15" CONDUIT, TYPE B | 799 FT | $110 | $125 | $130 | $91.00 | 2% |
| 630E66500 OVERHEAD SIGN SUPPORT, TYPE TC-15.115 | 2 EACH | $42,300 | $43,200 | $42,300 | $48,000 | 2% |
| 832E30000 EROSION CONTROL | 82,069 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 614E20210 WORK ZONE LANE LINE, CLASS I, 6", 740.06, TYPE I | 14.78 MILE | $5,300 | $2,500 | $3,696 | $7,500 | 1% |
| 10,147 FT |
| $3.25 |
| $2.25 |
| $1.50 |
| $8.00 |
| 202E38000 GUARDRAIL REMOVED | 2,423 FT | $1.61 | $2.00 | $1.60 | $2.50 |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 11 EACH | $201 | $200 | $200 | $250 |
| 202E98100 REMOVAL MISC.: EXISTING PIER REMOVAL | 6 EACH | $385 | $500 | $260 | $2,500 |
| 203E10000 EXCAVATION | 1,840 CY | $30.00 | $40.00 | $35.00 | $18.00 |
| 203E20000 EMBANKMENT | 717 CY | $3.87 | $7.00 | $15.00 | $15.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 200 CY | $6.00 | $11.00 | $12.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 13,388 SY | $1.65 | $1.00 | $2.00 | $2.00 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN | 5,776 CY | $12.50 | $30.00 | $31.00 | $14.00 |
| 204E45000 PROOF ROLLING | 7 HOUR | $190 | $125 | $350 | $100 |
| 204E50001 GEOTEXTILE FABRIC, AS PER PLAN | 13,258 SY | $0.80 | $1.22 | $1.75 | $1.50 |
| 606E15050 GUARDRAIL, TYPE MGS | 1,993 FT | $15.87 | $16.00 | $15.80 | $18.00 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 125 FT | $22.71 | $22.60 | $22.60 | $25.00 |
| 606E15250 GUARDRAIL, TYPE MGS QUARTER POST SPACING | 25 FT | $35.37 | $35.00 | $35.20 | $40.00 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 90 FT | $19.09 | $19.00 | $19.00 | $21.00 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 6 EACH | $1,874 | $1,950 | $1,865 | $2,145 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $754 | $750 | $750 | $850 |
| 606E60022 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL) | 1 EACH | $22,456 | $22,350 | $22,350 | $24,585 |
| 606E60040 IMPACT ATTENUATOR, TYPE 3 UNIDIRECTIONAL | 1 EACH | $25,244 | $25,750 | $25,125 | $28,325 |
| 608E52000 CURB RAMP | 209 SF | $10.00 | $10.00 | $13.00 | $26.00 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 362 FT | $65.00 | $62.00 | $75.00 | $128 |
| 622E10201 BARRIER TRANSITION, AS PER PLAN | 4 EACH | $10,000 | $8,400 | $14,000 | $9,880 |
| 622E23401 CONCRETE BARRIER, TYPE B, AS PER PLAN | 20 FT | $285 | $225 | $425 | $440 |
| 622E24840 CONCRETE BARRIER END SECTION, TYPE B | 1 EACH | $6,000 | $9,500 | $10,000 | $8,270 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 1 EACH | $3,000 | $9,500 | $5,000 | $6,800 |
| 622E25004 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 18 EACH | $2,000 | $2,750 | $4,800 | $4,450 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 2 EACH | $2,000 | $2,850 | $5,000 | $4,450 |
| 601E11000 RIPRAP, TYPE D | 4 SY | $274 | $225 | $180 | $150 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 3.78 SY | $175 | $330 | $280 | $225 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $465 | $455 | $160 | $250 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $60.00 | $50.00 | $50.00 | $250 |
| 659E00300 TOPSOIL | 560 CY | $24.00 | $20.00 | $20.00 | $45.00 |
| 659E10000 SEEDING AND MULCHING | 5,178 SY | $0.90 | $0.65 | $0.65 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 252 SY | $0.90 | $1.00 | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 252 SY | $0.40 | $0.01 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.81 TON | $600 | $500 | $500 | $1,000 |
| 659E31000 LIME | 1.04 ACRE | $30.00 | $0.01 | $1.00 | $650 |
| 659E35000 WATER | 28 MGAL | $1.00 | $0.01 | $1.00 | $10.00 |
| 659E40000 MOWING | 36 MSF | $5.00 | $0.01 | $1.00 | $10.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 62 SY | $2.00 | $3.00 | $3.00 | $8.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,125 | $1,200 | $2,500 | $15,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $25,500 | $25,500 | $8,500 | $5,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 790 FT | $36.00 | $27.00 | $18.00 | $20.00 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $448 | $625 | $530 | $750 |
| 202E58300 CATCH BASIN OR INLET REMOVED | 23 EACH | $300 | $700 | $550 | $450 |
| 602E20000 CONCRETE MASONRY | 0.62 CY | $2,400 | $2,800 | $2,500 | $1,450 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $18.00 | $14.00 | $15.00 | $20.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 499 FT | $20.00 | $27.00 | $31.00 | $15.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $55.00 | $17.00 | $12.00 | $25.00 |
| 611E06100 15" CONDUIT, TYPE C | 321 FT | $75.00 | $71.00 | $83.00 | $58.00 |
| 611E07400 18" CONDUIT, TYPE B | 10 FT | $195 | $260 | $250 | $100 |
| 611E07600 18" CONDUIT, TYPE C | 200 FT | $75.00 | $67.00 | $100 | $61.00 |
| 611E09100 21" CONDUIT, TYPE C | 320 FT | $100 | $84.00 | $100 | $80.00 |
| 611E10400 24" CONDUIT, TYPE B | 50 FT | $200 | $285 | $310 | $156 |
| 611E10600 24" CONDUIT, TYPE C | 10 FT | $125 | $215 | $250 | $115 |
| 611E98411 CATCH BASIN, NO. 8, AS PER PLAN | 1 EACH | $3,300 | $3,450 | $4,000 | $3,480 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 3 EACH | $650 | $965 | $600 | $1,000 |
| 611E98821 INLET, NO. 3D, AS PER PLAN | 2 EACH | $7,500 | $7,100 | $10,000 | $12,650 |
| 611E98851 INLET, NO. 2-A-8, AS PER PLAN | 1 EACH | $5,000 | $3,300 | $7,200 | $6,900 |
| 611E98881 INLET, NO. 2-A-14, AS PER PLAN | 2 EACH | $5,000 | $4,100 | $5,400 | $7,750 |
| 611E98891 INLET, NO. 2-A-16, AS PER PLAN | 2 EACH | $5,000 | $4,500 | $5,600 | $8,500 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 6 EACH | $3,000 | $3,600 | $3,800 | $4,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 3 EACH | $700 | $900 | $750 | $1,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $225 | $200 | $325 | $350 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 13,066 FT | $1.93 | $1.95 | $2.00 | $3.50 |
| 407E20000 NON-TRACKING TACK COAT | 13,290 GAL | $2.35 | $2.50 | $3.00 | $3.50 |
| 609E24510 CURB, TYPE 4-C | 3,487 FT | $15.00 | $12.00 | $18.00 | $20.00 |
| 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE) | 4.08 MILE | $1,534 | $1,470 | $2,650 | $2,850 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 5,635 LB | $0.70 | $2.50 | $3.00 | $3.50 |
| 625E00450 CONNECTION, FUSED PULL APART | 5 EACH | $95.00 | $95.00 | $100 | $125 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 5 EACH | $95.00 | $95.00 | $100 | $125 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 48 EACH | $95.00 | $95.00 | $100 | $125 |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT14B34 | 3 EACH | $2,350 | $2,450 | $2,200 | $2,500 |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT18B34 | 2 EACH | $2,458 | $2,558 | $2,300 | $2,600 |
| 625E14500 LIGHT POLE FOUNDATION | 5 EACH | $1,550 | $1,750 | $2,000 | $2,500 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 620 FT | $3.50 | $3.50 | $2.25 | $2.50 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 496 FT | $1.60 | $1.60 | $1.25 | $1.50 |
| 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB | 531 FT | $8.20 | $8.20 | $8.00 | $10.00 |
| 625E25504 CONDUIT, 3", 725.051 | 10 FT | $25.00 | $25.00 | $8.00 | $10.00 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, TYPE II, 200 | 4 EACH | $375 | $375 | $400 | $450 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, TYPE II, 310 | 1 EACH | $375 | $375 | $400 | $450 |
| 625E29000 TRENCH | 501 FT | $11.00 | $11.00 | $10.00 | $11.00 |
| 625E29930 MEDIAN JUNCTION BOX | 1 EACH | $1,700 | $1,700 | $3,000 | $3,350 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $800 | $800 | $850 | $950 |
| 625E31510 PULL BOX REMOVED | 5 EACH | $125 | $125 | $200 | $225 |
| 625E32000 GROUND ROD | 5 EACH | $245 | $245 | $250 | $275 |
| 625E36000 PLASTIC CAUTION TAPE | 501 FT | $0.20 | $0.20 | $0.25 | $0.50 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $49,400 | $65,400 | $10,000 | $28,000 |
| 625E75400 LIGHT POLE REMOVED | 5 EACH | $200 | $200 | $200 | $250 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 5 EACH | $100 | $100 | $200 | $250 |
| 625E75506 LUMINAIRE REMOVED | 5 EACH | $60.00 | $60.00 | $25.00 | $35.00 |
| 625E75800 DISCONNECT CIRCUIT | 19 EACH | $235 | $235 | $250 | $275 |
| 631E94350 REMOVAL OF DISCONNECT SWITCH | 1 EACH | $100 | $100 | $500 | $550 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 72 EACH | $40.00 | $40.00 | $40.00 | $45.00 |
| 620E11000 DELINEATOR, BRACKET MOUNTED | 40 EACH | $85.00 | $85.00 | $85.00 | $90.00 |
| 620E31200 REMOVAL OF DELINEATOR | 84 EACH | $5.00 | $5.00 | $5.00 | $6.00 |
| 621E00100 RPM | 711 EACH | $26.50 | $27.50 | $26.50 | $30.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 534 EACH | $10.00 | $2.50 | $9.48 | $10.00 |
| 625E32000 GROUND ROD | 3 EACH | $300 | $235 | $235 | $250 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE WAY | 75 EACH | $6.03 | $7.00 | $6.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 67 EACH | $6.43 | $7.00 | $6.40 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 474.6 FT | $9.00 | $10.00 | $9.00 | $11.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 219 FT | $10.00 | $12.00 | $10.00 | $14.00 |
| 630E06100 GROUND MOUNTED SUPPORT, NO. 6 POST | 116 FT | $12.00 | $12.00 | $12.00 | $14.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 97.1 FT | $18.00 | $20.00 | $18.00 | $25.00 |
| 630E08200 GROUND MOUNTED SUPPORT, PIPE | 3 EACH | $395 | $395 | $395 | $435 |
| 630E08600 SIGN POST REFLECTOR | 31 EACH | $34.50 | $40.00 | $34.50 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 6 EACH | $225 | $225 | $225 | $250 |
| 630E09050 TRIANGULAR SLIP BASE CONNECTION | 3 EACH | $185 | $185 | $185 | $205 |
| 630E21000 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 10 | 1 EACH | $16,950 | $17,250 | $16,950 | $19,950 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 35 EACH | $480 | $525 | $480 | $585 |
| 630E79610 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED | 11 EACH | $495 | $500 | $495 | $550 |
| 630E80100 SIGN, FLAT SHEET | 609.83 SF | $10.00 | $10.00 | $10.00 | $11.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 145 SF | $16.00 | $17.00 | $16.00 | $19.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 4,052.5 SF | $17.00 | $17.00 | $17.00 | $19.00 |
| 630E81000 MAINLINE REFERENCE MARKER | 19 EACH | $215 | $250 | $215 | $275 |
| 630E81010 RAMP REFERENCE MARKER | 6 EACH | $195 | $200 | $195 | $220 |
| 630E81200 SIGN ERECTED, EXTRUSHEET | 2,476.5 SF | $5.00 | $5.00 | $5.00 | $6.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 6 EACH | $745 | $750 | $745 | $825 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 5 EACH | $3,675 | $3,750 | $3,675 | $4,125 |
| 630E84600 GROUND MOUNTED PIPE SUPPORT FOUNDATION | 3 EACH | $380 | $375 | $380 | $425 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 70 EACH | $10.00 | $10.00 | $10.00 | $11.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 4 EACH | $135 | $150 | $135 | $165 |
| 630E85500 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND STORAGE | 2 EACH | $223 | $250 | $223 | $275 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 71 EACH | $10.00 | $10.00 | $10.00 | $11.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 8 EACH | $175 | $175 | $175 | $195 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 30 EACH | $185 | $200 | $185 | $220 |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 3 EACH | $1,480 | $1,550 | $1,480 | $1,705 |
| 646E10010 EDGE LINE, 6" | 6.89 MILE | $2,790 | $3,800 | $3,800 | $3,250 |
| 646E10110 LANE LINE, 6" | 5.68 MILE | $2,110 | $2,400 | $2,400 | $2,500 |
| 646E10310 CHANNELIZING LINE, 12" | 7,945 FT | $1.25 | $2.80 | $2.80 | $2.00 |
| 646E10400 STOP LINE | 47 FT | $9.15 | $15.00 | $15.00 | $20.00 |
| 646E10500 CROSSWALK LINE | 262 FT | $5.30 | $5.00 | $5.00 | $8.00 |
| 646E10620 CHEVRON MARKING | 559 FT | $7.25 | $10.00 | $10.00 | $10.00 |
| 646E20300 LANE ARROW | 9 EACH | $150 | $175 | $175 | $200 |
| 646E20320 WRONG WAY ARROW | 7 EACH | $125 | $225 | $225 | $200 |
| 646E20510 DOTTED LINE, 12" | 2,378 FT | $1.20 | $3.00 | $3.00 | $2.00 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 2 EACH | $1,300 | $1,300 | $2,000 | $2,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1" | 25 SY | $100 | $5.00 | $8.00 | $500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $90.00 | $65.00 | $70.00 | $65.00 |
| 614E11500 WORKSITE TRAFFIC SUPERVISOR | 8 MNTH | $2,000 | $250 | $3,200 | $7,500 |
| 614E11630 INCREASED BARRIER DELINEATION | 26,394 FT | $0.30 | $2.00 | $0.58 | $1.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 18 EACH | $1,500 | $1,850 | $1,785 | $2,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,500 | $2,000 | $3,880 | $2,500 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 2 EACH | $300 | $150 | $145 | $250 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 1,794 EACH | $6.00 | $3.75 | $8.45 | $10.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $250 | $150 | $223 | $220 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 535 EACH | $5.00 | $7.00 | $6.15 | $10.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 535 EACH | $11.00 | $7.00 | $12.15 | $15.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $550 | $850 | $600 | $1,250 |
| 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 24 SNMT | $300 | $850 | $675 | $800 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 11.36 MILE | $606 | $600 | $600 | $1,450 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 13.78 MILE | $707 | $700 | $700 | $1,550 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 26,857 FT | $2.50 | $1.95 | $1.90 | $2.50 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 15,890 FT | $0.96 | $0.95 | $0.95 | $1.50 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I | 5,134 FT | $2.50 | $3.00 | $0.75 | $3.50 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT | 4,756 FT | $1.26 | $1.25 | $1.25 | $1.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 94 FT | $3.54 | $3.50 | $3.50 | $5.00 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 524 FT | $1.52 | $1.50 | $1.50 | $3.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 18 EACH | $55.56 | $55.00 | $55.00 | $100 |
| 616E10000 WATER | 61 MGAL | $65.00 | $5.00 | $60.51 | $10.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $22.00 | $10.00 | $10.30 | $15.00 |
| 690E13000 SPECIAL - RUMBLE STRIPS | 14,900 FT | $3.80 | $4.25 | $1.05 | $1.50 |
| 100E50200 DEPARTMENT'S SHARE OF THE DISPUTE RESOLUTION ADVIS | 1 LS | $12,500 | $12,500 | $12,500 | $12,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $27,000 | $60,000 | $75,000 | $95,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $10,000 | $7,000 | $5,000 | $25,000 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 8 MNTH | $4,500 | $1,750 | $2,000 | $3,500 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $75,000 | $40,000 | $55,000 | $55,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 8,981 CY | $133.25 | $1.20M | 17% |
| 305E14020 10" CONCRETE BASE, CLASS QC1 WITH QC/QA | 11,652 SY | $65.75 | $766k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $420,000 | $420k | 6% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,700 CY | $155 | $419k | 6% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,745 CY | $175 | $305k | 4% |
| 622E41000 PORTABLE BARRIER, 32" | 27,404 FT | $8 | $219k | 3% |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 5,776 CY | $37 | $214k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 12,692 FT | $15 | $190k | 3% |
| 622E10060 CONCRETE BARRIER, SINGLE SLOPE, TYPE B | 2,697 FT | $65 | $175k | 3% |