HOC-SR-SR 374-21.98
HOC County · est $0.4M
Bid dateThursday, February 1—
HOC County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Parker Corporation | R3Freedom Construction Enterprises, | R4INC Buds INC | R5Eclipse CO LLC | R6Shelly & Sands INC | R7R C Construction Company And Son | R8INC Sunesis Construction CO | R9Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 687 CY | $75.00 | $65.00 | $77.00 | $84.00 | $87.50 | $79.00 | $55.00 | $98.35 | $69.00 | 15% |
| 611E96451 16' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN | 48 FT | $995 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Parker Corporation | R3Freedom Construction Enterprises, | R4INC Buds INC | R5Eclipse CO LLC | R6Shelly & Sands INC | R7R C Construction Company And Son | R8INC Sunesis Construction CO | R9Alan Stone CO INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 712.5 FT | $2.00 | $2.00 | $3.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 202E53100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,125 |
| $1,226 |
| $1,600 |
| $1,337 |
| $1,075 |
| $1,450 |
| $1,222 |
| $1,091 |
| 14% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 213 CY | $165 | $200 | $161 | $140 | $170 | $180 | $250 | $155 | $147 | 10% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 113 CY | $225 | $200 | $216 | $187 | $186 | $225 | $285 | $180 | $197 | 7% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 58.5 CY | $395 | $550 | $265 | $450 | $352 | $450 | $500 | $368 | $590 | 7% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 228 CY | $95.00 | $100 | $106 | $65.00 | $98.50 | $85.00 | $105 | $100 | $138 | 6% |
| 304E20000 AGGREGATE BASE | 233 CY | $90.00 | $65.00 | $61.00 | $95.00 | $62.50 | $65.00 | $65.00 | $78.34 | $79.00 | 6% |
| 203E10000 EXCAVATION | 1,123 CY | $16.00 | $10.00 | $13.00 | $18.00 | $10.50 | $25.00 | $10.00 | $26.90 | $36.00 | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 21.3 CY | $780 | $650 | $887 | $825 | $1,128 | $1,100 | $500 | $889 | $1,332 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $12,000 | $12,242 | $15,000 | $30,000 | $20,000 | $15,000 | $60,040 | $50,000 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 7,160 LB | $1.65 | $1.25 | $2.00 | $1.25 | $1.50 | $2.50 | $2.25 | $2.05 | $2.00 | 3% |
| 611E96550 FIELD PAVING OF EXISTING PIPE: 14'-3" X 8'-11" COR | 92 FT | $125 | $150 | $133 | $371 | $225 | $300 | $225 | $229 | $237 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 550 FT | $15.65 | $16.10 | $18.00 | $15.50 | $16.00 | $15.65 | $16.00 | $15.65 | $17.00 | 2% |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $8,500 | $6,000 | $5,831 | $13,000 | $6,208 | $7,500 | $12,500 | $7,250 | $14,745 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $8,500 | $1,000 | $4,362 | $10,000 | $5,350 | $12,700 | $6,500 | $6,419 | $8,184 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,500 | $100 | $13,038 | $8,000 | $3,607 | $25,000 | $15,000 | $9,292 | $26,097 | 2% |
| 203E20000 EMBANKMENT | 395 CY | $16.00 | $10.00 | $5.00 | $23.00 | $12.00 | $10.00 | $20.00 | $12.89 | $14.00 | 2% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 92 FT | $65.00 | $35.00 | $62.00 | $174 | $64.50 | $50.00 | $100 | $102 | $72.00 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,500 | $12,000 | $4,362 | $3,000 | $38,518 | $22,500 | $7,500 | $16,619 | $8,184 | 1% |
| 2 EACH |
| $40.00 |
| $50.00 |
| $142 |
| $50.00 |
| $48.00 |
| $75.00 |
| $50.00 |
| $68.94 |
| $100 |
| 203E35000 GRANULAR EMBANKMENT | 50 CY | $50.00 | $60.00 | $65.00 | $65.00 | $65.50 | $57.00 | $55.00 | $80.30 | $46.00 |
| 204E10000 SUBGRADE COMPACTION | 1,386 SY | $1.50 | $0.50 | $1.00 | $4.50 | $1.50 | $3.00 | $2.00 | $3.95 | $2.50 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 100 FT | $15.95 | $17.40 | $19.00 | $16.00 | $16.50 | $15.95 | $16.00 | $15.95 | $19.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $995 | $1,000 | $1,154 | $1,000 | $1,026 | $995 | $1,000 | $995 | $1,050 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $670 | $710 | $981 | $650 | $691 | $670 | $750 | $670 | $746 |
| 623E40500 REFERENCE MONUMENT | 4 EACH | $500 | $500 | $598 | $650 | $349 | $950 | $1,000 | $354 | $1,047 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 2 EACH | $170 | $100 | $259 | $125 | $155 | $175 | $150 | $43.26 | $158 |
| 659E10000 SEEDING AND MULCHING | 2,674 SY | $0.75 | $1.00 | $1.00 | $1.00 | $1.50 | $1.00 | $2.00 | $2.32 | $1.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.33 TON | $625 | $1,516 | $722 | $732 | $773 | $735 | $1,200 | $816 | $2,100 |
| 659E31000 LIME | 0.55 ACRE | $70.00 | $910 | $81.00 | $155 | $206 | $155 | $800 | $218 | $736 |
| 659E35000 WATER | 7 MGAL | $1.00 | $0.05 | $1.00 | $1.00 | $10.50 | $1.00 | $1.00 | $1.39 | $36.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 0.9 CY | $1,250 | $650 | $1,077 | $1,800 | $2,842 | $3,000 | $500 | $2,213 | $1,983 |
| 511E47010 CLASS QC1 CONCRETE, CULVERT | 8 CY | $200 | $650 | $286 | $300 | $372 | $875 | $1,000 | $623 | $318 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 85 SY | $25.00 | $12.00 | $17.00 | $26.00 | $31.50 | $25.00 | $20.00 | $30.92 | $29.00 |
| 512E33000 TYPE 2 WATERPROOFING | 107 SY | $18.00 | $14.00 | $16.00 | $17.00 | $27.00 | $22.50 | $20.00 | $22.50 | $27.00 |
| 512E33010 TYPE 3 WATERPROOFING | 102 SY | $28.00 | $18.00 | $17.00 | $31.00 | $39.00 | $32.00 | $30.00 | $22.50 | $51.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 53 SF | $3.00 | $5.00 | $8.00 | $16.00 | $10.50 | $4.00 | $20.00 | $4.49 | $17.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $2,600 | $1,200 | $4,272 | $3,500 | $7,583 | $3,500 | $2,500 | $3,782 | $3,172 |
| 605E31100 AGGREGATE DRAINS | 108 FT | $15.00 | $10.00 | $10.00 | $18.00 | $11.00 | $20.00 | $10.00 | $16.36 | $21.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 161 SY | $18.00 | $8.00 | $49.00 | $42.00 | $33.00 | $8.00 | $40.00 | $12.60 | $45.00 |
| 407E10000 TACK COAT | 91 GAL | $3.50 | $3.00 | $2.00 | $2.00 | $4.00 | $2.00 | $10.00 | $2.25 | $2.50 |
| 621E00100 RPM | 11 EACH | $318 | $255 | $548 | $255 | $258 | $318 | $500 | $221 | $237 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 11 EACH | $20.22 | $10.00 | $11.00 | $15.00 | $10.00 | $20.00 | $20.00 | $1.00 | $11.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 14 EACH | $9.60 | $5.00 | $9.00 | $8.00 | $10.00 | $9.60 | $10.00 | $8.00 | $5.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 24 FT | $8.60 | $10.00 | $12.00 | $10.00 | $9.00 | $8.60 | $10.00 | $8.60 | $11.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $35.00 | $50.00 | $64.00 | $55.00 | $36.00 | $35.00 | $40.00 | $35.00 | $153 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $12.00 | $10.00 | $17.00 | $15.00 | $12.50 | $12.00 | $20.00 | $12.00 | $61.00 |
| 642E00094 EDGE LINE, 6" | 0.16 MILE | $5,890 | $6,131 | $6,796 | $6,200 | $841 | $816 | $7,000 | $5,867 | $6,182 |
| 642E00290 CENTER LINE | 0.08 MILE | $11,345 | $12,263 | $13,091 | $12,500 | $1,336 | $1,296 | $13,000 | $9,319 | $11,908 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 20 CY | $65.00 | $40.00 | $107 | $50.00 | $68.00 | $75.00 | $45.00 | $107 | $85.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $200 | $80.00 | $196 | $100 | $205 | $205 | $50.00 | $1,029 | $372 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $12,500 | $9,160 | $10,000 | $16,000 | $3,800 | $15,000 | $3,745 | $5,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,500 | $12,000 | $10,525 | $6,000 | $12,000 | $16,850 | $35,000 | $2,600 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $12,000 | $2,884 | $5,000 | $7,500 | $8,500 | $10,000 | $3,450 | $8,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 687 CY | $75 | $52k | 13% |
| 611E96451 16' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN | 48 FT | $995 | $48k | 12% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 213 CY | $165 | $35k | 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 113 CY | $225 | $25k | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 58.5 CY | $395 | $23k | 6% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 228 CY | $95 | $22k | 5% |
| 304E20000 AGGREGATE BASE | 233 CY | $90 | $21k | 5% |
| 203E10000 EXCAVATION | 1,123 CY | $16 | $18k | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 21.3 CY | $780 | $17k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 4% |