HAR-SR 53-10.55
HAR County · est $0.4M
Bid dateThursday, February 15—
HAR County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 30 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2R G Zachrich Construction INC | R3Rietschlin Construction INC | R4R & I Construction INC | R5Shelly & Sands INC | R6Vernon Nagel INC | R7Miller Bros Const INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 245 SY | $220 | $184 | $184 | $250 | $217 | $250 | $275 | 17% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 61 CY | $750 | $1,131 | $1,040 | $1,100 | $1,460 | $1,200 | $1,450 | 15% |
| Item | Quantity | R1Eagle Bridge CO | R2R G Zachrich Construction INC | R3Rietschlin Construction INC | R4R & I Construction INC | R5Shelly & Sands INC | R6Vernon Nagel INC | R7Miller Bros Const INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $1,000 | $1,100 | $1,000 | $1,036 | $1,000 | $1,000 |
| 202E38000 GUARDRAIL REMOVED | 737.5 FT | $2.00 | $1.20 | $3.25 | $2.00 | $2.00 | $2.00 | $1.20 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $38,000 |
| $35,000 |
| $37,500 |
| $47,000 |
| $36,500 |
| $60,000 |
| $55,000 |
| 12% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 132 CY | $221 | $185 | $208 | $189 | $232 | $220 | $220 | 9% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 16,994 LB | $1.00 | $1.05 | $1.25 | $1.25 | $0.83 | $1.00 | $1.20 | 5% |
| 526E90010 TYPE A INSTALLATION | 88 FT | $150 | $100 | $115 | $100 | $150 | $120 | $160 | 4% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 37 CF | $320 | $245 | $269 | $245 | $260 | $255 | $245 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 82 FT | $140 | $140 | $158 | $140 | $148 | $155 | $140 | 4% |
| 304E20000 AGGREGATE BASE | 120 CY | $90.00 | $54.90 | $52.00 | $45.00 | $71.00 | $75.00 | $75.00 | 3% |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 490 SY | $20.05 | $19.00 | $22.00 | $25.00 | $22.00 | $23.00 | $30.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 33 CY | $281 | $230 | $337 | $306 | $297 | $280 | $280 | 3% |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,125 | $2,120 | $2,035 | $2,120 | $2,244 | $2,120 | $2,120 | 3% |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 475 FT | $17.24 | $17.20 | $19.25 | $17.20 | $19.00 | $17.20 | $17.20 | 3% |
| 832E30000 EROSION CONTROL | 7,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 4 EACH | $1,849 | $1,845 | $2,200 | $1,845 | $1,953 | $1,845 | $1,845 | 2% |
| 253E02000 PAVEMENT REPAIR | 20 CY | $341 | $250 | $374 | $340 | $360 | $340 | $340 | 2% |
| 202E22900 APPROACH SLAB REMOVED | 134 SY | $50.00 | $34.91 | $31.25 | $45.00 | $40.00 | $40.00 | $40.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $6,000 | $4,000 | $4,200 | $2,270 | $7,500 | $5,000 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $5,500 | $16,000 | $25,000 | $21,400 | $10,000 | $20,000 | $10,000 | 2% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $5,000 | $13,821 | $4,200 | $7,500 | $1,300 | $1,400 | $3,500 | 2% |
| 203E10000 EXCAVATION |
| 243 CY |
| $20.00 |
| $30.00 |
| $24.00 |
| $10.00 |
| $13.00 |
| $20.00 |
| $25.00 |
| 203E20000 EMBANKMENT | 30 CY | $50.00 | $70.00 | $23.00 | $20.00 | $14.00 | $20.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 677 SY | $4.50 | $1.46 | $2.75 | $1.00 | $2.00 | $1.00 | $1.50 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 8 STA | $40.09 | $40.00 | $120 | $40.00 | $181 | $40.00 | $40.00 |
| 659E10000 SEEDING AND MULCHING | 1,300 SY | $3.00 | $2.00 | $2.25 | $1.40 | $3.00 | $2.00 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.18 TON | $750 | $600 | $700 | $500 | $635 | $600 | $600 |
| 659E35000 WATER | 8 MGAL | $1.00 | $1.00 | $11.00 | $1.00 | $2.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 40 FT | $13.00 | $11.86 | $22.00 | $10.00 | $54.00 | $16.00 | $16.00 |
| 407E10000 TACK COAT | 23 GAL | $1.00 | $10.00 | $2.75 | $2.50 | $2.00 | $1.00 | $1.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 2 EACH | $65.15 | $65.00 | $49.50 | $65.00 | $69.00 | $65.00 | $65.00 |
| 621E00100 RPM | 2 EACH | $782 | $985 | $880 | $800 | $53.00 | $800 | $780 |
| 626E00102 BARRIER REFLECTOR, TYPE 1,BI-DIRECTIONAL | 4 EACH | $6.57 | $6.55 | $7.25 | $6.55 | $7.00 | $8.00 | $6.55 |
| 626E00110 BARRIER REFLECTOR, TYPE 2,BI-DIRECTIONAL | 11 EACH | $6.82 | $6.80 | $8.25 | $6.80 | $8.00 | $8.00 | $6.80 |
| 642E00094 EDGE LINE, 6" | 0.07 MILE | $1,498 | $12,000 | $10,300 | $12,000 | $1,582 | $17,875 | $1,495 |
| 642E00290 CENTER LINE | 0.04 MILE | $2,220 | $24,000 | $17,600 | $24,000 | $2,344 | $18,020 | $2,215 |
| 407E10000 TACK COAT | 20 GAL | $1.00 | $10.00 | $2.75 | $2.50 | $3.00 | $1.00 | $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $185 | $250 | $407 | $370 | $392 | $185 | $185 |
| 616E10000 WATER | 1 MGAL | $1.00 | $44.00 | $11.00 | $1.00 | $83.00 | $1.00 | $75.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $95.00 | $30.00 | $74.75 | $25.00 | $84.00 | $65.00 | $75.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 220 EACH | $16.00 | $22.41 | $18.00 | $10.00 | $24.00 | $22.00 | $19.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 228 EACH | $10.00 | $5.00 | $9.00 | $5.00 | $6.00 | $8.50 | $9.00 |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.:1" PRECOMP | 110 FT | $44.00 | $39.75 | $81.00 | $50.00 | $70.00 | $40.00 | $35.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 70 FT | $20.00 | $13.22 | $11.00 | $10.00 | $23.00 | $10.00 | $20.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 30 SF | $150 | $88.81 | $62.25 | $50.00 | $221 | $175 | $150 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 30 SF | $150 | $88.81 | $80.00 | $30.00 | $159 | $150 | $150 |
| 848E50300 WEARING COURSE REMOVED, ASPHALT | 324 SY | $7.00 | $8.99 | $4.00 | $15.00 | $20.00 | $10.00 | $10.75 |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $4,500 | $6,242 | $5,400 | $4,890 | $5,175 | $4,000 | $6,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $5,000 | $1,760 | $2,000 | $6,298 | $2,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 245 SY | $220 | $54k | 15% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 61 CY | $750 | $46k | 12% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $38,000 | $38k | 10% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 132 CY | $220.51 | $29k | 8% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 16,994 LB | $1 | $17k | 5% |
| 526E90010 TYPE A INSTALLATION | 88 FT | $150 | $13k | 4% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 37 CF | $320 | $12k | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 82 FT | $139.82 | $11k | 3% |
| 304E20000 AGGREGATE BASE | 120 CY | $90 | $11k | 3% |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 490 SY | $20.05 | $10k | 3% |