MOT-SR 235-01.77 R
MOT County · est $1.0M
Bid dateThursday, February 15—
MOT County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 54 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2Eagle Bridge CO | R3Shelly & Sands INC | R4Double Z Construction Company | R5Complete General Construction Company | R6John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 18 EACH | $7,425 | $8,100 | $7,500 | $7,800 | $8,100 | $8,291 | 19% |
| 511E31612 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 211 CY | $595 | $375 | $580 | $480 | $350 | $653 | 18% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $81,000 | $117,500 |
| Item | Quantity | R1Brumbaugh Construction INC | R2Eagle Bridge CO | R3Shelly & Sands INC | R4Double Z Construction Company | R5Complete General Construction Company | R6John R Jurgensen Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,100 | $1,500 | $1,000 | $2,000 | $9,000 | $4,559 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 1,316 SY | $5.25 | $8.00 | $6.75 | $12.00 | $13.00 | $7.81 |
| 202E38000 GUARDRAIL REMOVED | 369 FT | $3.00 | $1.50 | $1.75 | $1.60 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $79,800 |
| $90,000 |
| $80,000 |
| $65,952 |
| 11% |
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 9 EACH | $7,425 | $8,100 | $7,866 | $7,800 | $8,100 | $7,886 | 9% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 305 CY | $144 | $117 | $175 | $117 | $117 | $159 | 6% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 34,737 LB | $0.85 | $0.90 | $0.86 | $1.00 | $0.90 | $0.80 | 4% |
| 515E12041 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 4 EACH | $6,700 | $8,100 | $7,866 | $7,600 | $8,100 | $8,007 | 4% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 41 CY | $641 | $750 | $560 | $700 | $700 | $484 | 4% |
| 526E10011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 145 SY | $161 | $200 | $290 | $205 | $190 | $258 | 3% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 118 CY | $189 | $240 | $253 | $240 | $240 | $220 | 3% |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 170 FT | $106 | $92.21 | $68.00 | $64.75 | $73.25 | $92.00 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $18,000 | $12,500 | $25,000 | $18,000 | $25,320 | $11,960 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,629 | $13,950 | $23,000 | $32,400 | $39,000 | $37,741 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 705 SY | $22.00 | $18.04 | $21.00 | $20.00 | $20.00 | $20.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $17,000 | $20,000 | $30,000 | $20,000 | $40,000 | 2% |
| 515E12041 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 2 EACH | $6,700 | $8,100 | $7,866 | $7,600 | $8,100 | $8,007 | 2% |
| 304E20000 AGGREGATE BASE | 270 CY | $44.00 | $60.00 | $60.00 | $65.00 | $70.00 | $61.69 | 2% |
| 526E90010 TYPE A INSTALLATION | 92 FT | $123 | $125 | $132 | $140 | $175 | $144 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $9,000 | $5,000 | $6,000 | $9,000 | $6,479 | 1% |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 132 EACH | $60.00 | $70.00 | $75.00 | $75.00 | $100 | $69.56 | 1% |
| $1.60 |
| $2.80 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 2 EACH | $200 | $200 | $311 | $295 | $295 | $200 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 3 EACH | $200 | $100 | $100 | $95.00 | $95.00 | $200 |
| 203E10000 EXCAVATION | 327 CY | $9.00 | $20.00 | $18.00 | $30.00 | $15.00 | $38.52 |
| 203E20000 EMBANKMENT | 70 CY | $9.00 | $25.00 | $11.00 | $15.00 | $25.00 | $20.32 |
| 204E10000 SUBGRADE COMPACTION | 1,677 SY | $1.00 | $3.00 | $2.25 | $4.00 | $5.00 | $1.72 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 179 FT | $19.00 | $17.79 | $26.00 | $25.40 | $25.40 | $17.75 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $1,848 | $1,764 | $1,800 | $1,775 | $1,775 | $1,760 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,205 | $2,105 | $1,900 | $1,885 | $1,885 | $2,100 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $903 | $862 | $825 | $780 | $780 | $860 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $1,864 | $1,779 | $2,250 | $2,130 | $2,130 | $1,775 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $247 | $236 | $550 | $525 | $525 | $235 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 29 SY | $96.00 | $70.00 | $80.00 | $125 | $125 | $383 |
| 659E10000 SEEDING AND MULCHING | 801 SY | $2.50 | $5.00 | $2.75 | $6.00 | $3.95 | $2.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 40 SY | $2.00 | $2.00 | $1.00 | $1.00 | $0.70 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $900 | $1,250 | $2,100 | $625 | $495 | $2,000 |
| 659E35000 WATER | 4.3 MGAL | $10.00 | $1.00 | $10.00 | $1.00 | $2.00 | $10.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 190 FT | $10.50 | $8.00 | $13.50 | $12.00 | $20.00 | $14.48 |
| 407E10000 TACK COAT | 78 GAL | $10.00 | $2.76 | $2.75 | $2.75 | $2.75 | $2.50 |
| 609E24510 CURB, TYPE 4-C | 38 FT | $39.00 | $45.00 | $42.00 | $45.00 | $125 | $50.14 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 10 EACH | $8.00 | $7.02 | $7.25 | $10.00 | $6.90 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (ONE-WAY) | 10 EACH | $8.00 | $7.02 | $7.25 | $10.00 | $6.90 | $7.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 49 FT | $11.00 | $10.52 | $16.00 | $15.00 | $15.00 | $10.50 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 2 SF | $115 | $110 | $100 | $95.00 | $95.00 | $110 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $79.00 | $75.18 | $47.00 | $45.00 | $45.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $26.00 | $25.06 | $10.50 | $10.00 | $10.00 | $25.00 |
| 646E10010 EDGE LINE, 6" | 0.22 MILE | $25,000 | $19,334 | $21,000 | $22,320 | $22,825 | $22,320 |
| 646E10110 LANE LINE, 6" | 0.11 MILE | $24,000 | $18,653 | $12,065 | $21,640 | $11,415 | $21,640 |
| 646E10310 CHANNELIZING LINE, 12" | 35 FT | $5.50 | $5.01 | $10.50 | $5.00 | $10.00 | $5.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $70.00 | $100 | $73.00 | $65.00 | $80.00 | $70.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 3 SNMT | $990 | $750 | $848 | $1,500 | $900 | $900 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.77 MILE | $6,800 | $8,000 | $11,000 | $6,072 | $6,072 | $6,072 |
| 616E10000 WATER | 1 MGAL | $25.00 | $1.00 | $82.00 | $50.00 | $60.00 | $81.01 |
| 202E22900 APPROACH SLAB REMOVED | 224 SY | $23.00 | $35.00 | $22.00 | $33.00 | $45.00 | $59.29 |
| 202E23500 WEARING COURSE REMOVED | 804 SY | $3.50 | $7.00 | $4.00 | $9.00 | $13.00 | $2.88 |
| 202E75260 VANDAL PROTECTION FENCE REMOVED | 267 FT | $6.75 | $10.00 | $8.00 | $7.50 | $7.50 | $13.75 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $3,500 | $6,000 | $12,000 | $6,000 | $13,500 | $5,863 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 42 EACH | $37.00 | $12.00 | $50.00 | $30.00 | $20.00 | $21.29 |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 4 CY | $925 | $1,600 | $1,626 | $1,800 | $1,950 | $1,036 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 4 FT | $250 | $150 | $105 | $225 | $300 | $153 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 16 SF | $8.00 | $5.00 | $22.00 | $12.00 | $10.00 | $18.35 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 20 SF | $9.00 | $11.00 | $19.00 | $16.00 | $10.00 | $9.43 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 119 FT | $24.00 | $27.00 | $33.00 | $28.00 | $45.00 | $45.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 89 FT | $24.00 | $15.00 | $14.00 | $18.00 | $22.50 | $22.50 |
| 516E41100 1/8" PREFORMED BEARING PAD | 66 EACH | $5.00 | $5.50 | $16.00 | $25.00 | $65.00 | $18.34 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 47 CY | $90.00 | $80.00 | $67.00 | $85.00 | $100 | $124 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 122 FT | $10.00 | $8.00 | $2.85 | $8.00 | $10.00 | $4.14 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 30 FT | $10.00 | $14.00 | $2.85 | $15.00 | $15.00 | $36.65 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 23 SF | $177 | $325 | $180 | $225 | $350 | $433 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $1,000 | $1,750 | $2,300 | $1,500 | $1,800 | $1,888 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $4,000 | $8.00 | $7,000 | $3,000 | $2,463 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 18 EACH | $7,425 | $134k | 16% |
| 511E31612 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 211 CY | $595 | $126k | 15% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $81,000 | $81k | 10% |
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 9 EACH | $7,425 | $67k | 8% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 305 CY | $144 | $44k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 34,737 LB | $0.85 | $30k | 4% |
| 515E12041 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 4 EACH | $6,700 | $27k | 3% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 41 CY | $641 | $26k | 3% |
| 526E10011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 145 SY | $161 | $23k | 3% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 118 CY | $189 | $22k | 3% |