HIG-CR 1159 (Harry Sauner Rd.)
HIG County · est $1.0M
Bid dateThursday, March 8—
HIG County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 86 more items below.
| Item | Quantity | R1Shelly Company | R2Shelly & Sands INC | R3Fillmore Construction | R4Cox Paving LLC | R5Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (504 CY | $142 | $150 | $150 | $142 | $151 | 10% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 3,343 FT | $17.95 | $25.00 | $20.00 | $19.16 | $19.51 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $25,000 | $65,000 | $30,000 | $22,244 | 8% |
| 608E10000 4" CONCRETE WALK | 12,718 SF |
| Item | Quantity | R1Shelly Company | R2Shelly & Sands INC | R3Fillmore Construction | R4Cox Paving LLC | R5Sunesis Construction CO |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,500 | $26,000 | $8,500 | $8,500 | $2,143 |
| 202E23000 PAVEMENT REMOVED | 560 SY | $9.25 | $9.00 | $5.00 | $15.50 | $15.78 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 1,485 SY | $5.25 | $9.25 | $4.00 | $6.00 | $11.83 |
| 202E30000 WALK REMOVED | 3,642 SF | $1.20 | $0.75 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $4.00 |
| $4.50 |
| $6.00 |
| $6.42 |
| $5.96 |
| 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 226 CY | $223 | $172 | $145 | $170 | $180 | 7% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 803 SY | $54.50 | $75.00 | $50.00 | $59.00 | $54.54 | 6% |
| 203E20000 EMBANKMENT | 1,250 CY | $32.00 | $20.00 | $20.00 | $26.00 | $18.73 | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 225 CY | $170 | $185 | $160 | $185 | $186 | 6% |
| 611E04400 12" CONDUIT, TYPE B | 645 FT | $52.00 | $50.00 | $80.00 | $120 | $75.79 | 5% |
| 304E20000 AGGREGATE BASE | 534 CY | $60.00 | $65.00 | $40.00 | $80.00 | $86.85 | 5% |
| 203E10000 EXCAVATION | 999 CY | $32.00 | $25.00 | $10.00 | $24.00 | $26.85 | 5% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 2,851 FT | $8.75 | $9.00 | $10.00 | $13.77 | $8.40 | 4% |
| 832E30000 EROSION CONTROL | 24,061 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 638E00600 6" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, PUS | 367 FT | $62.00 | $75.00 | $100 | $72.44 | $77.09 | 3% |
| 659E00300 TOPSOIL | 558 CY | $38.00 | $10.80 | $20.00 | $60.00 | $38.33 | 3% |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 138 CY | $145 | $50.00 | $40.00 | $51.00 | $58.92 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $50,000 | $24,357 | $45,436 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | 5,450 SY | $2.90 | $1.75 | $3.00 | $2.66 | $3.57 | 2% |
| 611E98180 CATCH BASIN, NO. 3A | 6 EACH | $2,450 | $2,750 | $3,000 | $3,050 | $2,446 | 2% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $13,000 | $12,000 | $10,000 | $10,020 | $3,900 | 2% |
| $4.00 |
| $1.10 |
| $2.57 |
| 202E32000 CURB REMOVED | 431 FT | $5.75 | $4.75 | $5.00 | $9.32 | $7.70 |
| 202E32500 CURB AND GUTTER REMOVED | 1,957 FT | $6.25 | $5.25 | $7.00 | $6.16 | $5.99 |
| 202E32600 GUTTER REMOVED | 309 FT | $8.00 | $4.75 | $10.00 | $9.75 | $7.37 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 157 FT | $34.00 | $45.00 | $25.00 | $6.00 | $80.05 |
| 202E38000 GUARDRAIL REMOVED | 103 FT | $3.75 | $8.00 | $10.00 | $6.06 | $3.82 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $250 | $180 | $500 | $850 | $416 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 100 FT | $12.50 | $30.00 | $35.00 | $16.00 | $42.59 |
| 202E98100 REMOVAL MISC.: BUMPER BLOCKS | 9 EACH | $15.00 | $78.00 | $30.00 | $38.00 | $63.92 |
| 202E98100 REMOVAL MISC.: FENCE POST | 2 EACH | $20.00 | $160 | $100 | $64.00 | $37.86 |
| 202E98100 REMOVAL MISC.: LIGHTED SIGN | 2 EACH | $150 | $750 | $1,100 | $166 | $1,438 |
| 202E98100 REMOVAL MISC.: SIGN | 4 EACH | $150 | $350 | $100 | $142 | $200 |
| 204E10000 SUBGRADE COMPACTION | 3,156 SY | $2.25 | $3.00 | $1.00 | $1.17 | $8.32 |
| 204E13000 EXCAVATION OF SUBGRADE | 64 CY | $40.00 | $22.00 | $40.00 | $35.00 | $46.97 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 64 CY | $50.00 | $45.00 | $40.00 | $42.00 | $74.59 |
| 204E45000 PROOF ROLLING | 2 HOUR | $150 | $200 | $100 | $112 | $231 |
| 204E50000 GEOTEXTILE FABRIC | 192 SY | $2.25 | $2.25 | $5.00 | $2.50 | $1.49 |
| 608E52000 CURB RAMP | 201 SF | $10.00 | $14.00 | $10.00 | $16.00 | $11.18 |
| 623E38500 MONUMENT ASSEMBLY | 6 EACH | $1,200 | $1,000 | $1,000 | $1,800 | $1,254 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 6 EACH | $115 | $200 | $200 | $150 | $226 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $5,000 | $6,500 | $7,500 | $8,220 | $12,621 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 2 SY | $115 | $225 | $180 | $250 | $115 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 16 CY | $155 | $110 | $100 | $95.37 | $81.19 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $200 | $100 | $65.00 | $55.00 |
| 659E10000 SEEDING AND MULCHING | 5,019 SY | $0.97 | $0.75 | $1.00 | $1.10 | $4.51 |
| 659E14000 REPAIR SEEDING AND MULCHING | 251 SY | $0.50 | $0.50 | $1.00 | $1.00 | $1.85 |
| 659E15000 INTER-SEEDING | 251 SY | $0.50 | $0.01 | $1.00 | $1.00 | $1.65 |
| 659E20000 COMMERCIAL FERTILIZER | 0.7 TON | $625 | $800 | $625 | $600 | $400 |
| 659E31000 LIME | 1.04 ACRE | $100 | $200 | $100 | $200 | $30.00 |
| 659E35000 WATER | 28 MGAL | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 350 SY | $2.72 | $2.00 | $2.72 | $2.40 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $5,000 | $6,000 | $1.00 | $1,095 | $9,662 |
| 602E20000 CONCRETE MASONRY | 0.5 CY | $1,700 | $5,000 | $2,500 | $2,809 | $4,413 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 385 FT | $8.75 | $11.00 | $10.00 | $11.23 | $11.35 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 85 FT | $25.00 | $20.00 | $20.00 | $26.62 | $22.51 |
| 611E00900 6" CONDUIT, TYPE B | 241 FT | $21.00 | $21.00 | $20.00 | $32.00 | $21.29 |
| 611E01100 6" CONDUIT, TYPE C | 100 FT | $13.00 | $10.00 | $20.00 | $32.00 | $18.44 |
| 611E01400 6" CONDUIT, TYPE E | 200 FT | $13.00 | $10.00 | $20.00 | $32.00 | $22.74 |
| 611E01500 6" CONDUIT, TYPE F | 200 FT | $13.00 | $9.00 | $20.00 | $36.83 | $22.74 |
| 611E04600 12" CONDUIT, TYPE C | 91 FT | $47.00 | $52.00 | $100 | $80.00 | $67.19 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $2,900 | $3,500 | $4,000 | $3,700 | $3,261 |
| 611E99574 MANHOLE, NO. 3 | 3 EACH | $3,100 | $3,500 | $3,000 | $3,330 | $3,071 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $225 | $420 | $300 | $180 | $355 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 3,808 FT | $0.96 | $0.96 | $1.00 | $1.21 | $0.96 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 152 FT | $0.96 | $0.96 | $1.00 | $3.25 | $0.96 |
| 407E10000 TACK COAT | 897 GAL | $2.00 | $4.27 | $2.00 | $5.67 | $4.27 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $375 | $428 | $200 | $439 | $428 |
| 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (21 CY | $275 | $325 | $200 | $383 | $325 |
| 609E26000 CURB, TYPE 6 | 457 FT | $21.00 | $36.00 | $18.00 | $24.33 | $30.85 |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 74 FT | $21.00 | $30.00 | $20.00 | $31.29 | $33.70 |
| 611E07401 18" CONDUIT, TYPE B, AS PER PLAN | 5 FT | $250 | $305 | $200 | $400 | $381 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 10 CY | $100 | $125 | $200 | $83.00 | $110 |
| 638E09508 10" X 6" TAPPING SLEEVE, VALVE AND VALVE BOX (WITH | 1 EACH | $3,750 | $6,500 | $10,000 | $6,276 | $10,228 |
| 611E00900 6" CONDUIT, TYPE B | 100 FT | $50.00 | $25.00 | $50.00 | $30.50 | $74.19 |
| 611E01100 6" CONDUIT, TYPE C | 100 FT | $43.00 | $25.00 | $50.00 | $30.50 | $71.37 |
| 621E00100 RPM | 78 EACH | $52.00 | $41.00 | $52.00 | $33.85 | $33.85 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 81.5 FT | $10.00 | $18.00 | $29.00 | $10.00 | $9.75 |
| 630E80100 SIGN, FLAT SHEET | 39.5 SF | $18.00 | $34.00 | $35.00 | $18.00 | $13.95 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 7 EACH | $15.00 | $10.00 | $20.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $20.00 | $10.00 | $20.00 | $20.00 | $15.00 |
| 644E00100 EDGE LINE, 4" | 0.66 MILE | $2,995 | $3,000 | $3,100 | $2,995 | $3,155 |
| 644E00300 CENTER LINE | 0.63 MILE | $4,955 | $5,000 | $6,200 | $4,955 | $6,310 |
| 644E00400 CHANNELIZING LINE, 8" | 62 FT | $1.75 | $1.75 | $2.00 | $1.75 | $2.00 |
| 644E00500 STOP LINE | 30 FT | $6.40 | $6.50 | $8.00 | $6.40 | $8.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 35 FT | $6.40 | $6.50 | $7.00 | $6.40 | $6.80 |
| 644E01300 LANE ARROW | 14 EACH | $90.00 | $95.00 | $110 | $90.00 | $110 |
| 625E31600 PULL BOX, MISC.: PULL BOX RELOCATED | 1 EACH | $1,320 | $1,400 | $1,345 | $2,473 | $1,345 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 3 EACH | $2,693 | $3,000 | $1,490 | $2,729 | $1,490 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $75.00 | $100 | $55.00 | $65.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 39 CY | $200 | $250 | $300 | $130 | $245 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.82 MILE | $2,425 | $2,500 | $2,425 | $2,200 | $2,425 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.63 MILE | $2,185 | $2,400 | $2,185 | $2,060 | $2,185 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.77 MILE | $2,125 | $2,300 | $2,125 | $2,055 | $2,125 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.66 MILE | $1,900 | $2,100 | $1,900 | $2,020 | $1,900 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 62 FT | $9.25 | $10.00 | $9.25 | $1.00 | $9.25 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 10 FT | $28.50 | $30.00 | $28.50 | $5.00 | $28.50 |
| 616E10000 WATER | 57 MGAL | $1.00 | $10.25 | $1.00 | $2.00 | $15.55 |
| 873E21000 WORK ZONE CENTER LINE, CLASS I | 0.1 MILE | $23,775 | $24,000 | $23,775 | $12,000 | $23,775 |
| 873E22000 WORK ZONE EDGE LINE, CLASS I | 0.1 MILE | $13,254 | $14,000 | $13,254 | $6,600 | $13,254 |
| 873E27000 WORK ZONE DOTTED LINE, CLASS I | 168 FT | $3.00 | $3.00 | $3.00 | $1.00 | $3.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $6,000 | $10,000 | $6,400 | $6,372 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $2,500 | $1,500 | $1,100 | $2,151 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,500 | $23,500 | $25,000 | $6,500 | $7,040 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (504 CY | $142 | $72k | 8% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 3,343 FT | $17.95 | $60k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $55k | 6% |
| 608E10000 4" CONCRETE WALK | 12,718 SF | $4 | $51k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 226 CY | $223 | $50k | 5% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 803 SY | $54.5 | $44k | 5% |
| 203E20000 EMBANKMENT | 1,250 CY | $32 | $40k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 225 CY | $170 | $38k | 4% |
| 611E04400 12" CONDUIT, TYPE B | 645 FT | $52 | $34k | 4% |
| 304E20000 AGGREGATE BASE | 534 CY | $60 | $32k | 3% |