TUS-SR 39-12.64
TUS County · est $1.5M
Bid dateThursday, April 5—
TUS County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 141 more items below.
| Item | Quantity | R1Cornerstone Electric INC | R2Central-allied Enterprises INC | R3Complete General Construction Company | R4Miller Cable Company | % of bid |
|---|---|---|---|---|---|---|
| 625E13204 LIGHT TOWER, BBBB110 | 8 EACH | $14,500 | $15,600 | $14,000 | $15,800 | 12% |
| 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP | 14 EACH | $7,000 | $16,700 | $14,100 | $7,700 | 10% |
| 203E20000 EMBANKMENT | 3,634 CY | $25.00 | $20.00 | $14.00 | $25.00 | 9% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 372 CY | $225 | $164 | $225 | $225 |
| Item | Quantity | R1Cornerstone Electric INC | R2Central-allied Enterprises INC | R3Complete General Construction Company | R4Miller Cable Company |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,500 | $17,000 | $25,000 | $9,500 |
| 202E23000 PAVEMENT REMOVED | 218 SY | $12.00 | $7.00 | $18.00 | $12.00 |
| 202E30000 WALK REMOVED | 196 SF | $1.00 | $8.00 | $2.00 | $1.00 |
| 202E32000 CURB REMOVED | 20 FT | $12.00 | $8.00 | $12.00 | $12.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 9% |
| 809E69100 STOP-BAR RADAR DETECTION | 9 EACH | $7,000 | $6,500 | $6,000 | $7,000 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $65,000 | $80,000 | $88,000 | 5% |
| 304E20000 AGGREGATE BASE | 415 CY | $105 | $62.00 | $80.00 | $105 | 5% |
| 632E64000 STRAIN POLE FOUNDATION | 12 EACH | $3,500 | $3,200 | $4,000 | $4,850 | 4% |
| 625E29000 TRENCH | 8,833 FT | $4.75 | $3.50 | $6.00 | $12.00 | 4% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 5,581 FT | $6.50 | $6.00 | $10.00 | $8.00 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 106 CY | $325 | $192 | $325 | $325 | 4% |
| 625E13406 LIGHT TOWER, BBBBBB120 | 2 EACH | $16,100 | $18,800 | $16,000 | $17,250 | 3% |
| 632E83200 STRAIN POLE, TYPE TC-81.10, DESIGN 12 | 4 EACH | $8,000 | $8,900 | $8,750 | $6,300 | 3% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 1,017 FT | $30.00 | $35.00 | $31.00 | $40.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,000 | $15,000 | $28,000 | $37,000 | 3% |
| 832E30000 EROSION CONTROL | 29,106 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 625E26261 LUMINAIRE, HIGH MAST, AS PER PLAN, ASYMMETRIC, 400 | 44 EACH | $650 | $715 | $675 | $700 | 3% |
| 632E83100 STRAIN POLE, TYPE TC-81.10, DESIGN 11 | 4 EACH | $7,000 | $7,600 | $7,550 | $4,850 | 3% |
| 625E13200 LIGHT TOWER, BBBB100 | 2 EACH | $13,500 | $15,500 | $14,000 | $14,500 | 3% |
| 203E10000 EXCAVATION | 1,046 CY | $25.00 | $20.00 | $33.00 | $25.00 | 3% |
| 529 FT |
| $4.50 |
| $9.00 |
| $6.00 |
| $4.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 79 FT | $6.75 | $11.00 | $25.00 | $6.75 |
| 202E38000 GUARDRAIL REMOVED | 1,226 FT | $1.50 | $2.50 | $1.50 | $1.50 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $150 | $250 | $500 | $150 |
| 202E75000 FENCE REMOVED | 239 FT | $2.30 | $4.00 | $7.00 | $2.30 |
| 204E10000 SUBGRADE COMPACTION | 1,910 SY | $3.00 | $1.00 | $2.50 | $3.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 262.5 FT | $21.00 | $18.50 | $20.80 | $21.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,100 | $2,180 | $2,075 | $2,100 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $800 | $900 | $795 | $800 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 1 EACH | $2,150 | $2,100 | $2,135 | $2,150 |
| 607E23000 FENCE, TYPE CLT | 638 FT | $18.00 | $23.50 | $17.60 | $18.00 |
| 607E70000 FENCELINE SEEDING AND MULCHING | 638 FT | $1.45 | $2.00 | $1.45 | $1.45 |
| 607E98000 FENCE, MISC.: TEMPORARY ORANGE PLASTIC CONSTRUCTIO | 200 FT | $6.00 | $10.00 | $6.00 | $6.00 |
| 608E10000 4" CONCRETE WALK | 1,156 SF | $10.00 | $8.50 | $6.00 | $10.00 |
| 608E52000 CURB RAMP | 320 SF | $50.00 | $20.00 | $13.00 | $50.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $88.00 | $300 | $88.00 | $88.00 |
| 659E00300 TOPSOIL | 243 CY | $50.00 | $40.00 | $28.00 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 2,185 SY | $1.12 | $2.75 | $1.11 | $1.12 |
| 659E14000 REPAIR SEEDING AND MULCHING | 109 SY | $0.70 | $1.00 | $0.69 | $0.70 |
| 659E15000 INTER-SEEDING | 109 SY | $0.70 | $0.10 | $0.69 | $0.70 |
| 659E20000 COMMERCIAL FERTILIZER | 0.3 TON | $660 | $750 | $657 | $660 |
| 659E31000 LIME | 0.45 ACRE | $155 | $200 | $154 | $155 |
| 659E35000 WATER | 12 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 529 SY | $1.70 | $5.00 | $1.70 | $1.70 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $3,500 | $5,000 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $20,000 | $22,000 | $7,500 | $20,000 |
| 602E20000 CONCRETE MASONRY | 0.2 CY | $4,000 | $2,500 | $4,000 | $4,000 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 281 FT | $13.00 | $8.75 | $22.00 | $13.00 |
| 605E31100 AGGREGATE DRAINS | 55 FT | $25.00 | $48.00 | $10.00 | $25.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 20 FT | $38.00 | $25.00 | $25.00 | $38.00 |
| 611E04400 12" CONDUIT, TYPE B | 102 FT | $100 | $97.00 | $160 | $100 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $3,800 | $3,350 | $3,500 | $3,800 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,151 FT | $5.00 | $2.00 | $2.00 | $5.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/4" | 2,030 SY | $10.00 | $4.00 | $4.00 | $10.00 |
| 407E10000 TACK COAT | 282 GAL | $2.25 | $2.00 | $2.25 | $2.25 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (80 CY | $325 | $350 | $325 | $325 |
| 442E10051 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B ( | 23 CY | $400 | $420 | $400 | $400 |
| 442E10150 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 38 CY | $400 | $490 | $400 | $400 |
| 451E14010 9" REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 140 SY | $150 | $114 | $150 | $150 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 545 FT | $45.00 | $43.00 | $40.00 | $45.00 |
| 609E26000 CURB, TYPE 6 | 107 FT | $80.00 | $52.00 | $35.00 | $80.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 14 EACH | $100 | $126 | $95.00 | $100 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 63 EACH | $100 | $40.00 | $120 | $100 |
| 625E13208 LIGHT TOWER, BBBB120 | 1 EACH | $16,100 | $19,600 | $17,000 | $17,150 |
| 625E13404 LIGHT TOWER, BBBBBB110 | 1 EACH | $14,500 | $17,600 | $14,000 | $16,000 |
| 625E20000 PORTABLE WINCH DRIVE POWER UNIT | 1 EACH | $2,500 | $2,950 | $2,800 | $2,400 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 3,444 FT | $2.10 | $0.85 | $2.50 | $3.00 |
| 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE | 1,110 FT | $2.60 | $1.30 | $3.50 | $3.20 |
| 625E24330 1-1/2" DUCT CABLE WITH THREE NO. 2 AWG 2400 VOLT C | 3,494 FT | $7.00 | $7.60 | $11.00 | $10.00 |
| 625E25500 CONDUIT, 3", 725.04 | 38 FT | $15.00 | $18.00 | $21.00 | $22.00 |
| 625E26261 LUMINAIRE, HIGH MAST, AS PER PLAN, SYMMETRIC, 400 | 18 EACH | $650 | $1,000 | $675 | $700 |
| 625E30700 PULL BOX, 725.08, 18" | 14 EACH | $750 | $540 | $850 | $800 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $850 | $590 | $950 | $950 |
| 625E32000 GROUND ROD | 28 EACH | $200 | $90.00 | $190 | $165 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $6,500 | $5,800 | $7,450 | $9,100 |
| 625E36000 PLASTIC CAUTION TAPE | 8,825 FT | $0.10 | $0.15 | $0.60 | $0.70 |
| 625E39520 PULL BOX CLEANED | 2 EACH | $100 | $150 | $90.00 | $75.00 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $5,000 | $1,850 | $40,000 | $26,500 |
| 625E75351 LIGHT TOWER REMOVED, AS PER PLAN | 12 EACH | $500 | $2,300 | $2,400 | $3,000 |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | $500 | $300 | $400 | $700 |
| 625E75540 LIGHT TOWER FOUNDATION REMOVED | 12 EACH | $500 | $715 | $1,100 | $600 |
| 625E75800 DISCONNECT CIRCUIT | 8 EACH | $150 | $270 | $325 | $235 |
| 621E00100 RPM | 55 EACH | $55.00 | $55.00 | $54.15 | $55.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 55 EACH | $20.00 | $15.00 | $10.00 | $20.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $6.00 | $8.50 | $6.00 | $6.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 289.8 FT | $10.00 | $9.50 | $9.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 385 FT | $10.00 | $10.00 | $10.00 | $10.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST, (TYPE S) | 16.2 FT | $11.00 | $11.50 | $11.00 | $11.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 70.1 FT | $30.00 | $20.00 | $26.00 | $30.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 112.9 FT | $32.00 | $25.00 | $30.00 | $32.00 |
| 630E08600 SIGN POST REFLECTOR (RED) | 8 EACH | $38.00 | $40.00 | $35.00 | $38.00 |
| 630E80100 SIGN, FLAT SHEET | 419.2 SF | $13.00 | $14.00 | $12.50 | $13.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 192 SF | $20.00 | $21.50 | $19.50 | $20.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 78 EACH | $10.00 | $15.00 | $10.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $45.00 | $100 | $45.00 | $45.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 11 EACH | $175 | $150 | $170 | $175 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 44 EACH | $10.00 | $15.00 | $10.00 | $10.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 11 EACH | $185 | $300 | $185 | $185 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 5 EACH | $120 | $200 | $120 | $120 |
| 642E00094 EDGE LINE, 6" | 0.11 MILE | $9,100 | $5,445 | $6,090 | $9,100 |
| 642E00290 CENTER LINE | 0.13 MILE | $12,100 | $5,250 | $6,230 | $12,100 |
| 642E00390 CHANNELIZING LINE, 8" | 1,100 FT | $0.80 | $0.60 | $1.55 | $0.80 |
| 642E00690 TRANSVERSE/DIAGONAL LINE | 100 FT | $2.80 | $7.85 | $3.25 | $2.80 |
| 642E01190 PARKING LOT STALL MARKING | 1,084 FT | $1.60 | $2.00 | $1.50 | $1.60 |
| 642E01700 HANDICAP SYMBOL MARKING | 2 EACH | $95.00 | $75.00 | $150 | $95.00 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 446 FT | $5.00 | $4.50 | $6.25 | $5.00 |
| 644E00500 STOP LINE | 104 FT | $8.00 | $8.85 | $8.85 | $8.00 |
| 644E00600 CROSSWALK LINE | 167 FT | $3.50 | $6.80 | $6.80 | $3.50 |
| 644E01300 LANE ARROW | 24 EACH | $100 | $85.00 | $85.00 | $100 |
| 644E01360 WRONG WAY ARROW | 3 EACH | $305 | $250 | $250 | $305 |
| 644E01510 DOTTED LINE, 6" | 97 FT | $2.00 | $5.20 | $5.20 | $2.00 |
| 611E00400 4" CONDUIT, TYPE E | 40 FT | $3.00 | $4.60 | $9.50 | $2.00 |
| 625E25500 CONDUIT, 3", 725.04 | 164 FT | $20.00 | $18.00 | $24.00 | $22.00 |
| 625E29000 TRENCH | 82 FT | $5.00 | $2.80 | $6.75 | $12.00 |
| 625E32000 GROUND ROD | 14 EACH | $200 | $105 | $190 | $165 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 17 EACH | $850 | $870 | $685 | $1,000 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 7 EACH | $1,200 | $1,235 | $875 | $1,500 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 4 EACH | $650 | $375 | $525 | $600 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 23 EACH | $25.00 | $25.00 | $35.00 | $20.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 4 EACH | $25.00 | $25.00 | $35.00 | $10.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 4 EACH | $200 | $105 | $200 | $125 |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 995 FT | $7.00 | $12.00 | $12.00 | $20.00 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 995 FT | $15.00 | $8.00 | $18.00 | $20.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 504 FT | $2.50 | $2.00 | $2.00 | $2.60 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,940 FT | $3.00 | $1.40 | $2.85 | $2.80 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 116 FT | $5.00 | $2.30 | $4.40 | $2.00 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 211 FT | $5.00 | $1.40 | $4.40 | $2.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 2 EACH | $1,800 | $1,300 | $1,675 | $1,150 |
| 632E82900 STRAIN POLE, TYPE TC-81.10, DESIGN 9 | 4 EACH | $6,000 | $6,400 | $6,500 | $4,400 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 3 EACH | $2,000 | $3,600 | $4,000 | $1,200 |
| 633E65532 CABINET, TYPE 336L | 2 EACH | $6,000 | $6,100 | $8,000 | $6,000 |
| 633E67100 CABINET FOUNDATION | 2 EACH | $1,500 | $840 | $2,950 | $2,750 |
| 633E67200 CONTROLLER WORK PAD | 2 EACH | $350 | $160 | $1,650 | $700 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 2 EACH | $1,500 | $1,670 | $1,700 | $1,600 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $5,500 | $5,390 | $5,000 | $5,600 |
| 633E99000 CONTROLLER ITEM, MISC.:CONTROLLER UNIT, INSTALLATI | 2 EACH | $500 | $195 | $800 | $750 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $70.00 | $65.00 | $70.00 | $70.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 244 FT | $0.50 | $5.00 | $2.00 | $0.50 |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 8 EACH | $2,000 | $2,000 | $1,950 | $2,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $225 | $200 | $200 | $225 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, (BIDIRECTIONAL) | 34 EACH | $12.00 | $50.00 | $10.00 | $12.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, (BIDIRECTIONAL) | 5 EACH | $12.00 | $50.00 | $13.00 | $12.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 5 EACH | $25.00 | $50.00 | $13.00 | $25.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 39 EACH | $20.00 | $50.00 | $16.00 | $20.00 |
| 614E20210 WORK ZONE LANE LINE, CLASS I, 6", 740.06, TYPE I | 0.13 MILE | $2,265 | $22,176 | $4,488 | $2,265 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.33 MILE | $12,070 | $17,424 | $8,976 | $12,070 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.8 MILE | $9,055 | $11,880 | $6,600 | $9,055 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 1,403 FT | $2.30 | $2.80 | $1.80 | $2.30 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I | 96 FT | $2.30 | $7.90 | $3.90 | $2.30 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 36 FT | $7.00 | $18.90 | $5.50 | $7.00 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 12 EACH | $260 | $225 | $100 | $260 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 70 SY | $110 | $88.00 | $40.00 | $110 |
| 616E10000 WATER | 10 MGAL | $25.00 | $55.00 | $80.00 | $25.00 |
| 622E41000 PORTABLE BARRIER, 32" | 1,660 FT | $15.00 | $45.00 | $15.00 | $15.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,500 | $35,000 | $14,250 | $16,729 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,800 | $1,200 | $3,250 | $2,800 |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $67,000 | $40,000 | $100,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E13204 LIGHT TOWER, BBBB110 | 8 EACH | $14,500 | $116k | 7% |
| 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP | 14 EACH | $7,000 | $98k | 6% |
| 203E20000 EMBANKMENT | 3,634 CY | $25 | $91k | 5% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 372 CY | $225 | $84k | 5% |
| 809E69100 STOP-BAR RADAR DETECTION | 9 EACH | $7,000 | $63k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $50k | 3% |
| 304E20000 AGGREGATE BASE | 415 CY | $105 | $44k | 3% |
| 632E64000 STRAIN POLE FOUNDATION | 12 EACH | $3,500 | $42k | 2% |
| 625E29000 TRENCH | 8,833 FT | $4.75 | $42k | 2% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 5,581 FT | $6.5 | $36k | 2% |