MAH-SR Culverts FY2018
MAH County · est $0.2M
Bid dateThursday, April 19—
MAH County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Americon Industrial Services LLC | R2Rudzik Excavating INC | R3Shelly & Sands INC | R4S E T INC | R5Craig Edward Susany INC | R6Eclipse CO LLC | R7Stanley Miller Construction Company | R8Foust Construction INC | R9R T Vernal Paving & Excavating INC | R10Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 104 FT | $410 | $412 | $380 | $393 | $380 | $382 | $389 | $625 | $515 | $1,500 | 25% |
| Item | Quantity | R1Americon Industrial Services LLC | R2Rudzik Excavating INC | R3Shelly & Sands INC | R4S E T INC | R5Craig Edward Susany INC | R6Eclipse CO LLC | R7Stanley Miller Construction Company | R8Foust Construction INC | R9R T Vernal Paving & Excavating INC | R10Lockhart Concrete CO |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING (MAH-165-16.31) | 1 LS | $2,500 | $500 | $1,000 | $3,000 | $400 | $4,500 | $4,867 | $3,000 | $2,500 | $3,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $12,560 | $10,000 | $40,000 | $10,000 | $18,500 | $31,794 | $20,000 | $25,000 | $19,000 | 11% |
| 611E98510 CATCH BASIN, NO. 2-3 | 6 EACH | $2,000 | $1,727 | $1,500 | $1,273 | $1,600 | $1,771 | $980 | $1,175 | $1,800 | $1,200 | 7% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 67 CY | $165 | $215 | $440 | $259 | $300 | $549 | $262 | $440 | $196 | $270 | 6% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $350 | $2,300 | $1,525 | $1,500 | $850 | $1,000 | $1,000 | $1,000 | $400 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,200 | $9,500 | $12,000 | $96.50 | $10,000 | $6,500 | $11,712 | $20,000 | $22,000 | $21,000 | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 754 SY | $10.00 | $18.95 | $15.00 | $11.00 | $20.00 | $9.50 | $11.02 | $15.00 | $17.25 | $6.50 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 47 CY | $150 | $220 | $200 | $479 | $350 | $181 | $483 | $300 | $200 | $220 | 4% |
| 611E07600 18" CONDUIT, TYPE C | 92 FT | $70.00 | $59.61 | $55.00 | $46.17 | $70.00 | $61.50 | $67.50 | $90.00 | $38.00 | $87.00 | 4% |
| 611E13400 30" CONDUIT, TYPE B (706.02, 707.01, or 707.33) | 61 FT | $100 | $204 | $85.00 | $137 | $150 | $167 | $239 | $273 | $420 | $110 | 4% |
| 202E35200 PIPE REMOVED, OVER 24" | 182 FT | $30.00 | $10.00 | $24.00 | $4.50 | $2.00 | $22.50 | $10.00 | $20.00 | $40.00 | $20.00 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (MAH-165-16.31) | 1 LS | $5,000 | $1,000 | $5,500 | $7,675 | $500 | $2,626 | $5,767 | $2,500 | $8,000 | $10,000 | 3% |
| 659E00300 TOPSOIL | 195 CY | $25.00 | $24.85 | $24.00 | $51.50 | $10.00 | $39.50 | $37.26 | $25.00 | $25.00 | $20.00 | 3% |
| 659E10000 SEEDING AND MULCHING | 1,750 SY | $2.75 | $2.00 | $2.00 | $2.25 | $1.00 | $2.50 | $2.00 | $2.00 | $2.00 | $1.50 | 3% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 250 FT | $18.00 | $19.80 | $19.00 | $20.00 | $20.00 | $22.50 | $20.00 | $21.60 | $18.00 | $20.00 | 3% |
| 611E04400 12" CONDUIT, TYPE B(706.02, 707.01, OR 707.33) | 68 FT | $60.00 | $52.84 | $50.00 | $33.32 | $65.00 | $64.50 | $64.00 | $55.00 | $40.00 | $75.00 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 2 EACH | $2,000 | $2,200 | $2,100 | $2,200 | $2,000 | $2,232 | $2,223 | $2,175 | $2,000 | $21.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $3,025 | $5,000 | $5,000 | $10,000 | $7,500 | $10,556 | $6,000 | $15,000 | $11,000 | 2% |
| 614E12420 DETOUR SIGNING (MAH-165-16.31) | 1 LS | $3,290 | $3,600 | $4,000 | $3,550 | $5,000 | $11,500 | $3,656 | $4,000 | $3,290 | $3,500 | 2% |
| 602E20000 CONCRETE MASONRY | 5 CY | $650 | $1,460 | $1,600 | $1,053 | $1,000 | $892 | $993 | $1,175 | $1,000 | $800 | 2% |
| 201E11000 CLEARING AND GRUBBING (MAH-45-9.07) |
| 1 LS |
| $2,500 |
| $500 |
| $1,000 |
| $3,000 |
| $400 |
| $8,898 |
| $4,867 |
| $3,000 |
| $2,500 |
| $3,500 |
| 202E20010 HEADWALL REMOVED | 3 EACH | $500 | $417 | $450 | $200 | $250 | $559 | $250 | $350 | $500 | $100 |
| 202E23000 PAVEMENT REMOVED | 246 SY | $10.00 | $9.00 | $13.00 | $10.00 | $20.00 | $10.50 | $18.15 | $9.00 | $20.00 | $7.00 |
| 202E32000 CURB REMOVED | 23 FT | $5.00 | $15.00 | $20.00 | $5.00 | $10.00 | $7.00 | $1.00 | $10.00 | $5.00 | $5.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 36 FT | $14.50 | $10.00 | $28.00 | $5.00 | $2.00 | $17.50 | $10.00 | $10.00 | $20.00 | $10.00 |
| 202E38000 GUARDRAIL REMOVED | 367 FT | $1.00 | $1.70 | $1.60 | $2.00 | $2.00 | $4.50 | $2.00 | $2.00 | $1.55 | $3.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 83 FT | $20.00 | $44.10 | $32.00 | $10.45 | $16.00 | $32.50 | $50.50 | $45.37 | $38.00 | $10.00 |
| 203E10000 EXCAVATION | 274 CY | $8.00 | $13.00 | $19.00 | $12.00 | $20.00 | $13.00 | $16.30 | $14.75 | $40.00 | $15.00 |
| 203E20000 EMBANKMENT | 456 CY | $6.50 | $20.33 | $23.00 | $30.00 | $45.00 | $13.50 | $19.00 | $15.00 | $48.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 227 SY | $1.00 | $3.00 | $1.80 | $2.00 | $2.00 | $4.50 | $1.00 | $0.95 | $4.00 | $1.00 |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 6 STA | $28.50 | $80.00 | $400 | $400 | $1,000 | $562 | $726 | $350 | $100 | $500 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 24 CY | $65.00 | $109 | $150 | $84.33 | $100 | $96.00 | $125 | $150 | $80.00 | $100 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 6 CY | $103 | $121 | $140 | $91.17 | $200 | $135 | $125 | $150 | $80.00 | $95.00 |
| 616E10000 WATER | 3 MGAL | $5.00 | $1.00 | $1.00 | $51.25 | $0.10 | $64.00 | $1.00 | $1.00 | $1.00 | $50.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 87 SY | $0.50 | $1.60 | $0.69 | $1.53 | $1.00 | $0.50 | $1.00 | $0.40 | $1.00 | $1.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.24 TON | $550 | $100 | $650 | $370 | $900 | $347 | $600 | $400 | $500 | $700 |
| 659E31000 LIME | 0.36 ACRE | $125 | $100 | $160 | $120 | $400 | $105 | $400 | $100 | $500 | $500 |
| 659E35000 WATER | 10 MGAL | $5.00 | $1.00 | $1.00 | $51.25 | $0.10 | $1.00 | $1.00 | $1.00 | $1.00 | $50.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (MAH-45-9.07) | 1 LS | $3,000 | $500 | $5,000 | $2,288 | $500 | $2,626 | $5,355 | $2,500 | $10,000 | $10,000 |
| 611E00900 6" CONDUIT, TYPE B | 20 FT | $20.00 | $17.24 | $20.00 | $17.60 | $15.00 | $34.50 | $3.00 | $5.25 | $20.00 | $15.00 |
| 611E01400 6" CONDUIT, TYPE E | 20 FT | $20.00 | $9.79 | $20.00 | $17.60 | $15.00 | $26.00 | $3.00 | $4.75 | $20.00 | $15.00 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $20.00 | $9.79 | $20.00 | $17.60 | $15.00 | $26.00 | $3.00 | $4.75 | $20.00 | $15.00 |
| 611E10600 24" CONDUIT, TYPE C | 10 FT | $120 | $124 | $90.00 | $75.81 | $80.00 | $79.50 | $70.00 | $236 | $50.00 | $98.00 |
| 611E13600 30" CONDUIT, TYPE C | 10 FT | $90.00 | $167 | $96.00 | $89.00 | $150 | $87.50 | $239 | $150 | $100 | $110 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 171 FT | $2.50 | $4.00 | $4.00 | $3.00 | $20.00 | $3.00 | $3.50 | $2.50 | $3.00 | $2.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 46 CY | $55.00 | $67.72 | $86.00 | $62.00 | $100 | $79.00 | $172 | $55.00 | $60.00 | $45.00 |
| 407E20000 NON-TRACKING TACK COAT | 86 GAL | $3.00 | $11.00 | $2.80 | $17.00 | $20.00 | $5.50 | $16.67 | $2.80 | $10.00 | $4.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 48 GAL | $5.00 | $11.00 | $3.00 | $11.00 | $20.00 | $19.00 | $11.20 | $20.00 | $10.00 | $3.00 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (3 CY | $275 | $215 | $440 | $523 | $350 | $549 | $528 | $440 | $196 | $270 |
| 609E26000 CURB, TYPE 6 | 23 FT | $80.00 | $50.00 | $74.00 | $50.00 | $100 | $44.00 | $55.00 | $40.00 | $50.00 | $40.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 8 CY | $55.00 | $75.00 | $240 | $220 | $100 | $82.00 | $223 | $65.00 | $20.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 4 EACH | $6.00 | $6.60 | $6.00 | $7.00 | $20.00 | $7.00 | $6.67 | $6.50 | $6.00 | $4.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $20.00 | $22.00 | $21.00 | $8.00 | $12.00 | $18.50 | $22.25 | $10.00 | $20.00 | $10.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 4 SF | $35.00 | $38.50 | $36.00 | $40.00 | $35.00 | $68.50 | $39.00 | $15.00 | $35.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $50.00 | $100 | $68.00 | $20.00 | $100 | $68.50 | $45.00 | $50.00 | $100 | $85.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $50.00 | $15.00 | $10.00 | $20.00 | $10.00 | $10.50 | $25.00 | $25.00 | $100 | $15.00 |
| 642E00094 EDGE LINE, 6" | 0.12 MILE | $9,685 | $6,050 | $12,500 | $10,700 | $19,000 | $7,353 | $10,761 | $9,685 | $9,685 | $10,000 |
| 642E00290 CENTER LINE | 0.06 MILE | $12,910 | $6,050 | $17,000 | $14,210 | $19,000 | $12,604 | $14,345 | $12,910 | $12,910 | $13,000 |
| 614E12420 DETOUR SIGNING (MAH-45-9.07) | 1 LS | $2,720 | $3,000 | $4,000 | $3,200 | $5,000 | $6,500 | $3,022 | $3,000 | $2,720 | $3,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,600 | $1,429 | $1,600 | $1,500 | $20,000 | $10,250 | $4,000 | $7,500 | $3,000 | $9,700 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 104 FT | $410 | $43k | 20% |
| 624E10000 MOBILIZATION | 1 LS | $18,000 | $18k | 8% |
| 611E98510 CATCH BASIN, NO. 2-3 | 6 EACH | $2,000 | $12k | 6% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 67 CY | $165 | $11k | 5% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $9k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,200 | $8k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3") | 754 SY | $10 | $8k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 47 CY | $150 | $7k | 3% |
| 611E07600 18" CONDUIT, TYPE C | 92 FT | $70 | $6k | 3% |
| 611E13400 30" CONDUIT, TYPE B (706.02, 707.01, or 707.33) | 61 FT | $100 | $6k | 3% |