HOL-US 62-26.50
HOL County · est $2.6M
Bid dateThursday, July 26—
HOL County · est $2.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 17 more items below.
| Item | Quantity | R1Melway Paving CO INC | R2Superior Paving & Materials INC | R3Shelly Company | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 8,061 CY | $132 | $139 | $138 | $147 | 42% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (6273 CY | $125 | $116 | $112 | $131 | 31% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $100,000 | $85,000 | $211,000 | $100,000 | 4% |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $215 | $210 | $200 | $200 |
| Item | Quantity | R1Melway Paving CO INC | R2Superior Paving & Materials INC | R3Shelly Company | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 209E60500 LINEAR GRADING | 7.91 MILE | $325 | $650 | $600 | $890 |
| 607E98000 FENCE, MISC.: TEMPORARY ORNAGE PLASTIC CONSTRUCTIO | 45 FT | $1.00 | $5.60 | $5.55 | $5.50 |
| 608E52000 CURB RAMP | 60 SF | $90.00 | $72.50 | $72.50 | $40.00 |
| 659E98000 SEEDING, MISC.:CURB RAMP GRADING RESTORATION | 3 SY | $31.00 | $200 | $200 | $54.00 |
| 832E30000 EROSION CONTROL |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 320 CY | $200 | $185 | $240 | $188 | 3% |
| 407E10000 TACK COAT | 31,707 GAL | $2.00 | $2.00 | $2.00 | $1.70 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,544 CY | $40.00 | $40.00 | $38.00 | $21.00 | 2% |
| 646E10010 EDGE LINE, 6" | 21.28 MILE | $2,750 | $2,730 | $2,730 | $2,730 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 2 1/4" | 37,851 SY | $1.00 | $1.70 | $1.50 | $1.25 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 9,866 GAL | $3.50 | $3.70 | $3.00 | $3.00 | 1% |
| 621E00100 RPM | 1,478 EACH | $23.00 | $22.50 | $20.50 | $22.50 | 1% |
| 646E10200 CENTER LINE | 10.79 MILE | $3,050 | $3,025 | $3,025 | $3,025 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $32,000 | $68,000 | $100,000 | $89,000 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 22.98 MILE | $935 | $990 | $990 | $990 | 1% |
| 253E02000 PAVEMENT REPAIR | 107 CY | $200 | $185 | $275 | $188 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $12,000 | $12,700 | $20,000 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 21.02 MILE | $600 | $600 | $250 | $900 | 0% |
| 614E12460 WORK ZONE MARKING SIGN | 104 EACH | $96.00 | $60.00 | $60.00 | $60.00 | 0% |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 22.98 MILE | $402 | $500 | $475 | $475 | 0% |
| 202E23500 WEARING COURSE REMOVED | 1,910 SY | $4.75 | $2.00 | $6.00 | $5.15 | 0% |
| 1,000 EACH |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 605E31100 AGGREGATE DRAINS | 214 FT | $10.00 | $6.00 | $5.00 | $5.00 |
| 617E20000 SHOULDER PREPARATION | 12,708 SY | $0.50 | $0.30 | $0.40 | $0.55 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,478 EACH | $2.50 | $6.00 | $5.00 | $9.00 |
| 646E10300 CHANNELIZING LINE, 8" | 417 FT | $2.00 | $1.80 | $1.80 | $1.80 |
| 646E10400 STOP LINE | 50 FT | $13.00 | $11.00 | $11.00 | $11.00 |
| 646E10500 CROSSWALK LINE | 475 FT | $6.00 | $6.00 | $6.00 | $6.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 220 FT | $11.00 | $7.00 | $7.00 | $7.00 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $705 | $610 | $610 | $610 |
| 646E20300 LANE ARROW | 5 EACH | $156 | $180 | $180 | $180 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $66.00 | $65.00 | $65.00 | $65.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,251 FT | $2.00 | $0.60 | $0.60 | $0.60 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 150 FT | $9.00 | $3.50 | $3.50 | $3.50 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 8,061 CY | $132 | $1.06M | 41% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (6273 CY | $125 | $784k | 30% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $100,000 | $100k | 4% |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $215 | $93k | 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 320 CY | $200 | $64k | 2% |
| 407E10000 TACK COAT | 31,707 GAL | $2 | $63k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,544 CY | $40 | $62k | 2% |
| 646E10010 EDGE LINE, 6" | 21.28 MILE | $2,750 | $59k | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 2 1/4" | 37,851 SY | $1 | $38k | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 9,866 GAL | $3.5 | $35k | 1% |