MOE-Monroe Lake ODNR
MOE County · est $0.2M
Bid dateThursday, September 27—
MOE County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 2 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Shelly & Sands INC | R3Nls Paving, INC | % of bid |
|---|---|---|---|---|---|
| 304E20000 AGGREGATE BASE, 3" | 858 CY | $97.00 | $95.00 | $115 | 43% |
| 611E23600 60" CONDUIT, TYPE A | 110 FT | $193 | $410 | $415 | 11% |
| 422E10000 SINGLE CHIP SEAL, TYPE A | 2,205 SY | $7.50 | $5.00 | $6.50 | 8% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 110 CY | $150 | $98.00 | $145 | 8% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $235 | $375 | $240 | 6% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 108 CY | $95.00 | $151 | $125 | 5% |
| 602E20000 CONCRETE MASONRY | 8.1 CY | $1,250 | $820 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Shelly & Sands INC | R3Nls Paving, INC |
|---|---|---|---|---|
| 659E20000 COMMERCIAL FERTILIZER | 0.18 TON | $600 | $900 | $500 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.50 | $3.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,780 |
| 5% |
| 659E10000 SEEDING AND MULCHING | 2,000 SY | $2.50 | $2.00 | $1.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $14,000 | $15,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $750 | $960 | 2% |
| 202E35200 PIPE REMOVED, OVER 24" | 96 FT | $35.00 | $26.00 | $15.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,300 | $5,000 | $1,500 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $1,000 | $1,500 | 1% |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 30 FT | $54.00 | $68.00 | $10.00 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $1,400 | $3,000 | $500 | 1% |
| 642E00090 EDGE LINE, 4" | 0.05 MILE | $14,000 | $12,500 | $12,000 | 0% |
| 642E00290 CENTER LINE | 0.02 MILE | $35,000 | $31,000 | $30,000 | 0% |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 5 EACH | $90.00 | $100 | $75.00 | 0% |
| 203E10000 EXCAVATION | 10 CY | $20.00 | $73.50 | $55.00 | 0% |
| 202E38700 GUARDRAIL POST REMOVED | 3 EACH | $65.00 | $100 | $20.00 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 304E20000 AGGREGATE BASE, 3" | 858 CY | $97 | $83k | 43% |
| 611E23600 60" CONDUIT, TYPE A | 110 FT | $193 | $21k | 11% |
| 422E10000 SINGLE CHIP SEAL, TYPE A | 2,205 SY | $7.5 | $17k | 8% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 110 CY | $150 | $17k | 8% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $235 | $12k | 6% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 108 CY | $95 | $10k | 5% |
| 602E20000 CONCRETE MASONRY | 8.1 CY | $1,250 | $10k | 5% |
| 659E10000 SEEDING AND MULCHING | 2,000 SY | $2.5 | $5k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4k | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $4k | 2% |