COL-SR 46-01.37
COL County · est $1.1M
Bid dateThursday, November 29—
COL County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 20 more items below.
| Item | Quantity | R1Shelly Company | R2Shelly & Sands INC | R3R T Vernal Paving & Excavating INC | R4Barbicas Construction Company INC | R5Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 3,300 CY | $145 | $145 | $156 | $175 | $175 | 48% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (858 CY | $125 | $144 | $144 | $150 | $175 | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $58,000 | $33,000 | $45,000 | $40,000 | $125,000 | 6% |
| 251E01042 |
| Item | Quantity | R1Shelly Company | R2Shelly & Sands INC | R3R T Vernal Paving & Excavating INC | R4Barbicas Construction Company INC | R5Chagrin Valley Paving INC |
|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 1,585 SY | $2.50 | $6.00 | $1.05 | $4.00 | $3.00 |
| 202E30000 WALK REMOVED | 279 SF | $10.00 | $10.00 | $10.00 | $4.00 | $10.00 |
| 202E32000 CURB REMOVED | 58 FT | $25.00 | $20.00 | $20.00 | $8.00 | $25.00 |
| 209E60500 LINEAR GRADING | 5.02 MILE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 230 CY |
| $210 |
| $250 |
| $200 |
| $150 |
| $250 |
| 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2") | 27,466 SY | $1.50 | $1.00 | $1.05 | $1.50 | $1.50 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $25,000 | $40,000 | $55,000 | 4% |
| 253E02000 PAVEMENT REPAIR | 170 CY | $225 | $275 | $200 | $150 | $300 | 4% |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $200 | $300 | $200 | $185 | $350 | 3% |
| 646E10010 EDGE LINE, 6" | 10.52 MILE | $2,530 | $2,530 | $2,530 | $2,500 | $2,530 | 3% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A(3/4") | 15,520 SY | $1.25 | $1.00 | $1.05 | $1.50 | $1.25 | 2% |
| 407E10000 TACK COAT | 7,462 GAL | $2.50 | $2.00 | $2.00 | $2.00 | $2.00 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 424 CY | $40.00 | $45.00 | $60.00 | $75.00 | $50.00 | 2% |
| 408E10001 PRIME COAT, AS PER PLAN | 4,889 GAL | $3.00 | $2.85 | $4.50 | $4.00 | $2.00 | 1% |
| 646E10200 CENTER LINE | 5.45 MILE | $2,515 | $2,515 | $2,515 | $3,500 | $3,485 | 1% |
| 621E00100 RPM | 549 EACH | $22.10 | $22.10 | $22.25 | $22.25 | $22.25 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 10.9 MILE | $875 | $875 | $1,200 | $875 | $1,200 | 1% |
| 608E52000 CURB RAMP | 278 SF | $30.00 | $24.00 | $24.00 | $15.50 | $25.00 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 10.42 MILE | $525 | $1,000 | $1,200 | $1,450 | $750 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 1,961 GAL | $2.50 | $3.00 | $4.50 | $3.50 | $2.00 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 549 EACH | $8.00 | $10.00 | $5.00 | $6.00 | $1.00 | 0% |
| $500 |
| $2,389 |
| $1,200 |
| $1,450 |
| $750 |
| 607E98000 FENCE, MISC.:TEMPORARY ORANGE PLASTIC CONSTRUCTION | 260 FT | $15.00 | $10.75 | $10.75 | $2.00 | $10.00 |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 34 SF | $30.00 | $30.00 | $30.00 | $60.00 | $50.00 |
| 659E98000 SEEDING, MISC.:CURB RAMP GRADING RESTORATION | 3 SY | $300 | $100 | $100 | $95.00 | $500 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 340 FT | $5.00 | $12.00 | $10.00 | $10.00 | $5.00 |
| 617E20000 SHOULDER PREPARATION | 6,330 SY | $0.50 | $0.35 | $0.50 | $1.50 | $1.00 |
| 897E02000 PATCHING PLANED SURFACE | 462 SY | $0.50 | $10.00 | $5.00 | $2.75 | $10.00 |
| 632E26500 DETECTOR LOOP | 2 EACH | $1,200 | $1,200 | $1,200 | $1,200 | $2,000 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 20 FT | $1.00 | $1.00 | $1.00 | $1.00 | $50.00 |
| 646E10400 STOP LINE | 79 FT | $14.00 | $14.00 | $14.00 | $19.00 | $19.00 |
| 646E10500 CROSSWALK LINE | 93 FT | $7.00 | $7.00 | $7.00 | $11.00 | $11.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $65.00 | $70.00 | $65.00 | $60.00 | $75.00 |
| 614E12460 WORK ZONE MARKING SIGN | 62 EACH | $65.00 | $50.00 | $65.00 | $60.00 | $65.00 |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 10.9 MILE | $375 | $375 | $435 | $375 | $435 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 158 FT | $2.00 | $2.00 | $3.00 | $2.00 | $3.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,000 | $3,000 | $5,000 | $40,000 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 3,300 CY | $145 | $479k | 46% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (858 CY | $125 | $107k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $58,000 | $58k | 6% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 230 CY | $210 | $48k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2") | 27,466 SY | $1.5 | $41k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 253E02000 PAVEMENT REPAIR | 170 CY | $225 | $38k | 4% |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $200 | $34k | 3% |
| 646E10010 EDGE LINE, 6" | 10.52 MILE | $2,530 | $27k | 3% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A(3/4") | 15,520 SY | $1.25 | $19k | 2% |