WYA-SR 67-26.80
WYA County · est $0.9M
Bid dateThursday, November 29—
WYA County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1R & I Construction INC | R2Eagle Bridge CO | R3Mosser Construction INC | R4Miller Bros Const INC | R5Complete General Construction Company | R6Dot Construction CORP | % of bid |
|---|---|---|---|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 228 CY | $700 | $650 | $900 | $835 | $900 | $700 | 20% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $99,220 | $70,000 | $92,000 | $115,000 | $35,000 | $150,000 | 12% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,290 SF | $12.25 | $14.03 |
| Item | Quantity | R1R & I Construction INC | R2Eagle Bridge CO | R3Mosser Construction INC | R4Miller Bros Const INC | R5Complete General Construction Company | R6Dot Construction CORP |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $4,000 | $2,000 | $2,500 | $9,000 | $2,000 |
| 202E38000 GUARDRAIL REMOVED | 524 FT | $1.00 | $2.00 | $4.00 | $1.50 | $1.60 | $1.60 |
| 203E10000 EXCAVATION | 420 CY | $10.00 | $40.00 | $35.00 | $25.00 | $18.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $12.65 |
| $12.25 |
| $12.56 |
| $12.65 |
| 11% |
| 624E10000 MOBILIZATION | 1 LS | $65,000 | $16,000 | $20,000 | $20,000 | $40,000 | $80,000 | 8% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 334 FT | $170 | $135 | $134 | $134 | $175 | $140 | 7% |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 244 SY | $220 | $250 | $280 | $275 | $310 | $250 | 7% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 46,443 LB | $1.00 | $1.25 | $1.05 | $1.25 | $1.00 | $1.20 | 6% |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.:4" PRECOMP | 108 FT | $366 | $550 | $560 | $575 | $527 | $500 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 169 CY | $175 | $210 | $210 | $210 | $210 | $210 | 4% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 7,290 SF | $2.80 | $3.01 | $2.80 | $2.80 | $2.87 | $2.80 | 3% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 7,290 SF | $2.80 | $3.01 | $2.80 | $2.80 | $2.87 | $2.80 | 3% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 7,290 SF | $2.80 | $3.01 | $2.80 | $2.80 | $2.87 | $2.80 | 3% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 13 CY | $1,500 | $1,100 | $975 | $1,200 | $1,300 | $1,000 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 57 CY | $252 | $266 | $265 | $265 | $265 | $265 | 2% |
| 832E30000 EROSION CONTROL | 14,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 526E90010 TYPE A INSTALLATION | 108 FT | $125 | $125 | $160 | $170 | $200 | $200 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $14,500 | $7,500 | $8,500 | $10,000 | $12,000 | 1% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 45 CF | $248 | $300 | $248 | $250 | $248 | $600 | 1% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 98 SF | $100 | $110 | $90.00 | $150 | $195 | $250 | 1% |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,200 | $2,175 | $2,170 | $2,170 | $2,280 | $2,280 | 1% |
| $25.00 |
| 204E10000 SUBGRADE COMPACTION | 1,044 SY | $1.00 | $5.00 | $3.50 | $1.50 | $7.50 | $2.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 4 STA | $200 | $150 | $350 | $350 | $1,000 | $250 |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 63 FT | $35.00 | $26.06 | $26.00 | $26.00 | $36.00 | $36.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 3 EACH | $2,700 | $2,195 | $2,190 | $2,190 | $2,395 | $2,395 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $900 | $747 | $745 | $745 | $885 | $885 |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 2 CY | $50.00 | $100 | $100 | $90.00 | $50.00 | $200 |
| 659E10000 SEEDING AND MULCHING | 392 SY | $7.00 | $6.00 | $2.00 | $6.00 | $10.00 | $6.80 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $500 | $1,250 | $1,500 | $4.00 | $750 | $550 |
| 659E35000 WATER | 2 MGAL | $1.00 | $10.00 | $10.00 | $1.00 | $1.00 | $0.95 |
| 605E31100 AGGREGATE DRAINS | 84 FT | $10.00 | $10.00 | $20.00 | $15.00 | $20.00 | $50.00 |
| 304E20000 AGGREGATE BASE | 195 CY | $45.00 | $75.00 | $85.00 | $75.00 | $70.00 | $80.00 |
| 407E10000 TACK COAT | 112 GAL | $5.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 4 EACH | $72.50 | $70.16 | $70.00 | $70.00 | $72.50 | $72.50 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, (BI-DIRECTIONAL) | 10 EACH | $10.00 | $10.02 | $10.00 | $10.00 | $7.50 | $7.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BI-DIRECTIONAL) | 8 EACH | $10.00 | $10.02 | $10.00 | $8.00 | $7.55 | $7.55 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 24 FT | $8.00 | $11.03 | $11.00 | $8.00 | $25.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $16.00 | $45.10 | $45.00 | $16.00 | $65.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $23.00 | $15.03 | $50.00 | $23.00 | $10.00 | $10.00 |
| 642E00094 EDGE LINE, 6" | 0.07 MILE | $8,000 | $8,018 | $10,000 | $10,000 | $10,000 | $10,000 |
| 642E00290 CENTER LINE | 0.14 MILE | $8,000 | $8,018 | $10,000 | $10,000 | $10,000 | $10,000 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $300 | $300 | $300 | $300 | $300 | $300 |
| 407E10000 TACK COAT | 20 GAL | $5.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $250 | $251 | $250 | $250 | $250 | $250 |
| 616E10000 WATER | 1 MGAL | $1.00 | $10.00 | $100 | $75.00 | $60.00 | $1.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $25.00 | $65.00 | $85.00 | $80.00 | $85.00 | $100 |
| 202E22900 APPROACH SLAB REMOVED | 133 SY | $20.00 | $45.00 | $75.00 | $35.00 | $50.00 | $30.00 |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $6,000 | $7,500 | $3,000 | $3,000 | $15,000 | $10,000 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 200 LB | $1.00 | $1.00 | $1.00 | $1.50 | $2.00 | $1.20 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 95 EACH | $10.00 | $25.00 | $25.00 | $18.00 | $50.00 | $100 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 214 SY | $24.00 | $25.00 | $24.00 | $28.00 | $23.00 | $30.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 1,896 EACH | $3.15 | $3.20 | $3.75 | $3.75 | $3.25 | $7.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 15 MNHR | $50.00 | $85.20 | $50.00 | $50.00 | $51.28 | $50.00 |
| 514E10000 FINAL INSPECTION REPAIR | 1 EACH | $300 | $150 | $500 | $300 | $513 | $500 |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 12 EACH | $300 | $750 | $450 | $300 | $1,500 | $1,000 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $8,000 | $12,500 | $12,000 | $10,000 | $12,000 | $15,000 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 315 FT | $8.00 | $17.00 | $28.00 | $16.00 | $15.00 | $15.00 |
| 601E34101 ROCK CHANNEL PROTECTION, TYPE B WITHOUT FILTER, AS | 38 CY | $70.00 | $90.00 | $150 | $90.00 | $100 | $100 |
| 843E50001 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 14 SF | $100 | $175 | $100 | $175 | $350 | $250 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,000 | $3,000 | $6,000 | $4,000 | $6,000 | $20,000 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $500 | $1,500 | $2,000 | $2,750 | $2,000 | $1,500 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,000 | $5,000 | $5,500 | $10,000 | $3,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 228 CY | $700 | $160k | 18% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $99,220 | $99k | 11% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 7,290 SF | $12.25 | $89k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $65,000 | $65k | 7% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 334 FT | $170 | $57k | 6% |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 244 SY | $220 | $54k | 6% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 46,443 LB | $1 | $46k | 5% |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.:4" PRECOMP | 108 FT | $365.93 | $40k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 169 CY | $175 | $30k | 3% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 7,290 SF | $2.8 | $20k | 2% |