MRW-Mt Gilead State Park FY19
MRW County · est $0.4M
Bid dateThursday, December 13—
MRW County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Henry W Bergman INC | R2Kokosing Construction Company INC | R3Ward Construction CO | R4Columbus Asphalt Paving INC | R5Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (392 CY | $170 | $200 | $200 | $168 | $240 | 18% |
| 860E10010 THINLAY ASPHALT CONCRETE, TYPE LT | 238 CY | $180 | $280 | $250 | $195 | $250 | 12% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 211 CY | $175 | $181 | $250 | $280 | $200 | 10% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 |
| Item | Quantity | R1Henry W Bergman INC | R2Kokosing Construction Company INC | R3Ward Construction CO | R4Columbus Asphalt Paving INC | R5Shelly & Sands INC |
|---|---|---|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 316 SY | $5.00 | $12.00 | $8.00 | $6.75 | $12.00 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 180 FT | $10.00 | $2.00 | $2.00 | $2.10 | $2.00 |
| 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET | 109 EACH | $5.00 | $100 | $50.00 | $28.00 | $140 |
| 202E98100 REMOVAL MISC.:BOLLARD |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 232 CY |
| $145 |
| $167 |
| $180 |
| $156 |
| $230 |
| 9% |
| 882E98000 CHIP SEAL, MISC.:FOG SEAL | 5,165 SY | $6.00 | $1.15 | $1.75 | $2.00 | $1.15 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $10,000 | $20,000 | $35,000 | $10,000 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE1.5" | 8,472 SY | $2.50 | $3.85 | $3.50 | $2.70 | $4.75 | 6% |
| 251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 96 CY | $175 | $234 | $290 | $300 | $290 | 5% |
| 422E10001 SINGLE CHIP SEAL, TYPE A, AS PER PLAN | 3,784 SY | $4.00 | $6.15 | $4.00 | $4.80 | $6.15 | 4% |
| 642E30001 REMOVAL OF PAVEMENT MARKING, AS PER PLAN | 2,766 FT | $5.00 | $1.35 | $2.90 | $2.00 | $1.35 | 4% |
| 608E10000 4" CONCRETE WALK | 988 SF | $12.00 | $6.00 | $10.00 | $7.75 | $6.00 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 1,498 GAL | $5.00 | $2.90 | $2.25 | $7.25 | $2.75 | 2% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 153 CY | $45.00 | $140 | $160 | $115 | $120 | 2% |
| 606E13000 GUARDRAIL, TYPE 5 | 175 FT | $35.00 | $17.50 | $17.50 | $18.25 | $17.50 | 2% |
| 644E01200 PARKING LOT STALL MARKING | 4,525 FT | $1.25 | $1.55 | $0.95 | $1.60 | $1.55 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $3,000 | $5,000 | $2,600 | $3,000 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $18,000 | $5,000 | $20,000 | $16,500 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $5,000 | $2,840 | $1,000 | $5,000 | $5,000 | 1% |
| 202E30000 WALK REMOVED | 952 SF | $5.00 | $3.50 | $2.75 | $3.75 | $3.50 | 1% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 16 CY | $250 | $72.00 | $130 | $225 | $72.00 | 1% |
| 2 EACH |
| $20.00 |
| $150 |
| $200 |
| $300 |
| $150 |
| 202E98400 REMOVAL MISC.:PAVERS | 119 SF | $10.00 | $3.50 | $2.75 | $3.85 | $3.50 |
| 203E10000 EXCAVATION | 76 CY | $40.00 | $28.00 | $30.00 | $75.00 | $28.00 |
| 203E20000 EMBANKMENT | 1 CY | $40.00 | $88.00 | $200 | $250 | $88.00 |
| 204E10000 SUBGRADE COMPACTION | 315 SY | $1.00 | $1.50 | $1.00 | $3.00 | $1.50 |
| 608E53020 DETECTABLE WARNING | 36 SF | $30.00 | $25.00 | $25.00 | $30.00 | $25.00 |
| 690E50600 SPECIAL - BOLLARD | 6 EACH | $275 | $250 | $350 | $400 | $725 |
| 659E00300 TOPSOIL | 11 CY | $75.00 | $88.00 | $75.00 | $85.00 | $88.00 |
| 659E10000 SEEDING AND MULCHING | 109 SY | $10.00 | $4.25 | $20.00 | $21.00 | $4.25 |
| 659E14000 REPAIR SEEDING AND MULCHING | 5 SY | $10.00 | $5.00 | $1.00 | $10.00 | $5.00 |
| 659E15000 INTER-SEEDING | 5 SY | $10.00 | $5.00 | $0.01 | $10.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $2,000 | $800 | $750 | $780 | $800 |
| 659E31000 LIME | 0.02 ACRE | $2,000 | $800 | $200 | $210 | $800 |
| 659E35000 WATER | 1 MGAL | $10.00 | $30.00 | $1.00 | $10.00 | $30.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E02400 8" CONDUIT, TYPE D | 10 FT | $100 | $38.00 | $80.00 | $73.00 | $38.00 |
| 611E97600 CONDUIT, MISC.:CONCRETE ENCASEMENT | 1 CY | $200 | $495 | $800 | $415 | $495 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 4 EACH | $500 | $445 | $700 | $400 | $445 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $500 | $565 | $700 | $425 | $565 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETEVARIABLE DEPTH ( | 255 SY | $5.00 | $3.85 | $12.00 | $8.50 | $8.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETEVARIABLE DEPTH ( | 41 SY | $10.00 | $3.85 | $12.00 | $27.00 | $30.00 |
| 304E20000 AGGREGATE BASE | 53 CY | $55.00 | $70.00 | $110 | $86.00 | $60.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $300 | $95.00 | $500 | $250 | $95.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 80 FT | $10.00 | $7.50 | $7.50 | $7.80 | $7.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 160 FT | $10.00 | $12.00 | $12.00 | $12.50 | $12.00 |
| 630E80100 SIGN, FLAT SHEET | 55 SF | $20.00 | $17.50 | $17.50 | $18.20 | $17.50 |
| 644E00100 EDGE LINE, 4" | 0.89 MILE | $2,000 | $2,855 | $5,650 | $3,800 | $2,855 |
| 644E00300 CENTER LINE | 0.27 MILE | $2,000 | $5,280 | $8,500 | $5,200 | $5,280 |
| 644E00500 STOP LINE | 39 FT | $2.00 | $5.50 | $8.00 | $6.25 | $5.50 |
| 644E00600 CROSSWALK LINE | 78 FT | $2.00 | $3.50 | $4.00 | $5.00 | $3.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 420 FT | $2.00 | $1.90 | $1.50 | $5.50 | $1.90 |
| 644E01600 HANDICAP SYMBOL MARKING | 13 EACH | $100 | $115 | $75.00 | $286 | $115 |
| 616E10001 WATER, AS PER PLAN | 2 MGAL | $10.00 | $50.00 | $10.00 | $190 | $50.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (392 CY | $170 | $67k | 17% |
| 860E10010 THINLAY ASPHALT CONCRETE, TYPE LT | 238 CY | $180 | $43k | 11% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 211 CY | $175 | $37k | 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 232 CY | $145 | $34k | 8% |
| 882E98000 CHIP SEAL, MISC.:FOG SEAL | 5,165 SY | $6 | $31k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE1.5" | 8,472 SY | $2.5 | $21k | 5% |
| 251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 96 CY | $175 | $17k | 4% |
| 422E10001 SINGLE CHIP SEAL, TYPE A, AS PER PLAN | 3,784 SY | $4 | $15k | 4% |
| 642E30001 REMOVAL OF PAVEMENT MARKING, AS PER PLAN | 2,766 FT | $5 | $14k | 3% |