MEG-SR 124-55.30
MEG County · est $1.0M
Bid dateThursday, February 15—
MEG County · est $1.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1Trucco Construction CO INC | R2R C Construction Company And Son INC | R3Alan Stone CO INC | R4Eclipse CO LLC | R5Parker Corporation | R6Freedom Construction Enterprises, INC | R7Shelly & Sands INC | R8Rudzik Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 611E34001 120" CONDUIT, TYPE A, AS PER PLAN , 706.02 | 156 FT | $1,859 | $1,100 | $1,072 | $1,250 | $1,048 | $1,200 | $1,855 | $1,745 | 34% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 1,866 CY | $80.00 | $125 | $90.00 | $129 | $105 |
| Item | Quantity | R1Trucco Construction CO INC | R2R C Construction Company And Son INC | R3Alan Stone CO INC | R4Eclipse CO LLC | R5Parker Corporation | R6Freedom Construction Enterprises, INC | R7Shelly & Sands INC | R8Rudzik Excavating INC |
|---|---|---|---|---|---|---|---|---|---|
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $5,228 | $15,000 | $10,000 | $15,000 | $12,000 | $4,303 | $19,002 | $13,000 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 425 FT | $3.40 | $5.00 | $2.00 | $3.57 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $127 |
| $115 |
| $100 |
| 18% |
| 203E20000 EMBANKMENT | 9,682 CY | $8.00 | $10.00 | $17.00 | $17.98 | $20.00 | $14.00 | $19.00 | $18.00 | 9% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 37.4 CY | $1,350 | $550 | $692 | $1,032 | $650 | $1,346 | $1,650 | $905 | 6% |
| 203E10000 EXCAVATION | 12,000 CY | $4.00 | $10.00 | $9.00 | $17.34 | $20.00 | $16.00 | $19.00 | $19.00 | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $33,381 | $55,000 | $210,000 | $3,676 | $212,000 | $445,500 | $255,000 | $439,000 | 4% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 145 FT | $200 | $450 | $242 | $385 | $690 | $342 | $675 | $560 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 73 CY | $360 | $550 | $405 | $500 | $550 | $396 | $900 | $925 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $15,000 | $40,000 | $40,000 | $38,000 | $40,000 | $40,000 | $105,000 | 2% |
| 601E27000 DUMPED ROCK FILL, TYPE C | 268 CY | $65.00 | $75.00 | $58.00 | $106 | $65.00 | $108 | $100 | $90.00 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 107 CY | $150 | $200 | $150 | $221 | $200 | $229 | $185 | $205 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 9,332 LB | $1.70 | $3.00 | $2.00 | $3.32 | $1.25 | $2.00 | $3.00 | $1.00 | 2% |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $11,775 | $10,000 | $4,793 | $3,465 | $1,200 | $5,069 | $5,000 | $18,850 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 51 CY | $210 | $250 | $210 | $452 | $200 | $241 | $195 | $220 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,220 | $3,500 | $10,000 | $45,000 | $20,000 | $13,000 | $8,000 | $19,000 | 1% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 118 CY | $85.00 | $75.00 | $75.00 | $117 | $65.00 | $85.00 | $115 | $110 | 1% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,800 | $30,000 | $4,802 | $17,232 | $20,000 | $58,363 | $5,260 | $20,000 | 1% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $9,235 | $15,000 | $4,528 | $6,626 | $6,000 | $9,763 | $90,000 | $134,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,800 | $25,000 | $6,500 | $56,000 | $21,000 | $28,301 | $15,002 | $20,000 | 1% |
| $3.00 |
| $3.50 |
| $4.00 |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 2 EACH | $170 | $500 | $150 | $179 | $170 | $158 | $170 | $190 |
| 204E10000 SUBGRADE COMPACTION | 695 SY | $1.00 | $2.00 | $2.50 | $2.87 | $1.00 | $3.00 | $3.00 | $4.00 |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 425 FT | $10.20 | $25.00 | $11.00 | $10.71 | $10.20 | $19.00 | $10.20 | $11.00 |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 2 EACH | $1,000 | $1,500 | $1,050 | $1,050 | $1,000 | $1,236 | $1,000 | $1,100 |
| 659E10000 SEEDING AND MULCHING | 2,647 SY | $1.15 | $2.00 | $1.50 | $1.84 | $1.00 | $1.35 | $1.15 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.24 TON | $625 | $1,200 | $2,100 | $788 | $2,084 | $865 | $625 | $150 |
| 659E31000 LIME | 0.55 ACRE | $70.00 | $800 | $736 | $473 | $910 | $189 | $70.00 | $100 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1.00 | $36.00 | $10.50 | $0.50 | $1.15 | $1.00 | $2.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 128 SY | $20.00 | $40.00 | $48.00 | $30.98 | $12.00 | $19.00 | $25.00 | $22.00 |
| 605E31100 AGGREGATE DRAINS | 132 FT | $10.00 | $10.00 | $15.00 | $16.76 | $10.00 | $19.00 | $17.00 | $45.00 |
| 304E20000 AGGREGATE BASE | 160 CY | $23.00 | $75.00 | $97.00 | $75.63 | $65.00 | $96.00 | $85.00 | $105 |
| 407E10000 TACK COAT | 37 GAL | $2.00 | $10.00 | $2.50 | $7.35 | $5.00 | $2.00 | $2.00 | $3.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $5.00 | $50.00 | $13.00 | $12.98 | $10.00 | $12.00 | $15.00 | $30.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 13 FT | $9.00 | $10.00 | $9.50 | $9.45 | $9.00 | $12.00 | $9.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $35.00 | $75.00 | $100 | $36.77 | $35.00 | $68.00 | $35.00 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $10.00 | $50.00 | $50.00 | $10.50 | $10.00 | $19.00 | $10.00 | $15.00 |
| 642E00094 EDGE LINE, 6" | 0.1 MILE | $8,925 | $17,000 | $9,368 | $17,605 | $8,925 | $11,030 | $8,925 | $10,000 |
| 642E00290 CENTER LINE | 0.05 MILE | $16,850 | $17,000 | $23,228 | $17,657 | $16,850 | $20,824 | $16,850 | $20,000 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 50 CY | $23.00 | $40.00 | $110 | $96.58 | $65.00 | $230 | $85.00 | $155 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $65.00 | $50.00 | $461 | $212 | $100 | $773 | $275 | $285 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,500 | $10,000 | $20,000 | $15,000 | $20,000 | $4,326 | $15,000 | $24,812 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E34001 120" CONDUIT, TYPE A, AS PER PLAN , 706.02 | 156 FT | $1,859 | $290k | 33% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 1,866 CY | $80 | $149k | 17% |
| 203E20000 EMBANKMENT | 9,682 CY | $8 | $77k | 9% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 37.4 CY | $1,350 | $50k | 6% |
| 203E10000 EXCAVATION | 12,000 CY | $4 | $48k | 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $33,381 | $33k | 4% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 145 FT | $200 | $29k | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 73 CY | $360 | $26k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 2% |
| 601E27000 DUMPED ROCK FILL, TYPE C | 268 CY | $65 | $17k | 2% |