GEA-SR 608-02.45/04.58
GEA County · est $0.3M
Bid dateThursday, February 13—
GEA County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Chagrin Valley Paving INC | R3Kokosing Construction Company INC | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 846 CY | $150 | $170 | $163 | $175 | 46% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 950 SY | $31.50 | $20.00 | $34.00 | $41.00 | 11% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1-1/2") | 21,050 SY | $1.00 | $1.60 | $1.05 | $0.80 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $19,250 | $33,100 | $24,470 | $21,000 |
| Item | Quantity | R1Ronyak Paving INC | R2Chagrin Valley Paving INC | R3Kokosing Construction Company INC | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $550 | $500 | $600 | $600 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 90 EACH | $4.00 | $1.00 | $9.00 | $2.50 |
| 646E10400 STOP LINE | 38 FT | $16.00 | $25.00 | $25.00 | $16.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 624E10000 MOBILIZATION | 1 LS | $10,856 | $15,000 | $10,000 | $10,000 | 4% |
| 646E10010 EDGE LINE, 6" | 2.72 MILE | $3,797 | $3,430 | $3,430 | $3,797 | 4% |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $385 | $365 | $485 | $300 | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 71 CY | $100 | $80.00 | $125 | $98.00 | 3% |
| 646E10200 CENTER LINE | 1.36 MILE | $4,465 | $3,465 | $3,465 | $4,465 | 2% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,167 LB | $4.00 | $2.00 | $0.66 | $2.30 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 7 CY | $560 | $170 | $620 | $290 | 1% |
| 621E00100 RPM | 90 EACH | $43.00 | $43.00 | $43.00 | $43.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 1,887 GAL | $1.85 | $2.00 | $2.20 | $2.50 | 1% |
| 209E60501 LINEAR GRADING, AS PER PLAN | 2.65 MILE | $1,250 | $500 | $3,000 | $1,300 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $75.00 | $55.00 | $65.00 | 1% |
| 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A | 300 SF | $8.50 | $2.00 | $20.00 | $20.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $3,000 | $2,500 | $3,000 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,050 | $900 | $900 | $900 | 1% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 10 CY | $200 | $500 | $420 | $400 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.36 MILE | $1,000 | $998 | $975 | $975 | 0% |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $300 | $300 | $550 | $550 |
| 614E12460 WORK ZONE MARKING SIGN | 8 EACH | $100 | $95.00 | $95.00 | $95.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $100 | $173 | $100 | $230 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.36 MILE | $875 | $875 | $975 | $975 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 2.72 MILE | $500 | $500 | $650 | $650 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 2.72 MILE | $490 | $490 | $545 | $545 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 40 FT | $3.00 | $3.00 | $3.50 | $140 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 40 FT | $3.00 | $3.00 | $3.50 | $140 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,100 | $100 | $1,586 | $900 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 846 CY | $150 | $127k | 45% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 950 SY | $31.5 | $30k | 11% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1-1/2") | 21,050 SY | $1 | $21k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $19,250 | $19k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $10,856 | $11k | 4% |
| 646E10010 EDGE LINE, 6" | 2.72 MILE | $3,797 | $10k | 4% |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $385 | $10k | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 71 CY | $100 | $7k | 3% |
| 646E10200 CENTER LINE | 1.36 MILE | $4,465 | $6k | 2% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,167 LB | $4 | $5k | 2% |