ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 68 more items below.
| Item | Quantity | R1Great Lakes Crushing LTD | R2Chagrin Valley Paving INC | R3Eclipse CO LLC | R4Karvo Companies INC | R5S E T INC | R6Perk Company INC | R7Shelly & Sands INC | R8Shelly Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 3,923 CY | $125 | $120 | $117 | $118 | $124 | $113 | $152 | $136 | 19% |
| 202E23000 PAVEMENT REMOVED | 27,016 SY | $8.00 | $8.00 | $9.50 | $5.68 | $7.00 | $13.30 | $6.00 |
| Item | Quantity | R1Great Lakes Crushing LTD | R2Chagrin Valley Paving INC | R3Eclipse CO LLC | R4Karvo Companies INC | R5S E T INC | R6Perk Company INC | R7Shelly & Sands INC | R8Shelly Company |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $1,000 | $14,292 | $500 | $5,000 | $7,500 | $10,000 | $4,000 |
| 202E30000 WALK REMOVED | 5,262 SF | $2.00 | $1.50 | $1.50 | $5.00 | $2.50 | $2.00 | $1.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $9.00 |
| 9% |
| 304E20000 AGGREGATE BASE | 4,168 CY | $50.00 | $50.00 | $59.50 | $58.95 | $60.00 | $61.95 | $50.00 | $80.00 | 8% |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 81 EACH | $2,500 | $3,400 | $3,230 | $3,300 | $4,900 | $4,590 | $2,800 | $4,400 | 8% |
| 609E26000 CURB, TYPE 6 | 13,275 FT | $14.00 | $12.00 | $17.50 | $14.90 | $16.00 | $17.00 | $19.00 | $11.35 | 7% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1144 CY | $140 | $135 | $132 | $150 | $140 | $128 | $200 | $146 | 6% |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 700 CY | $200 | $15.00 | $47.00 | $50.00 | $71.00 | $61.50 | $200 | $100 | 6% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 11,694 FT | $11.00 | $10.00 | $9.00 | $10.00 | $14.00 | $16.50 | $12.00 | $12.00 | 5% |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 2,756 SY | $46.00 | $45.00 | $52.00 | $58.00 | $48.00 | $63.00 | $105 | $43.65 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 817 CY | $150 | $160 | $153 | $151 | $165 | $148 | $215 | $190 | 5% |
| 832E30000 EROSION CONTROL | 83,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $65,000 | $109,000 | $77,937 | $210,000 | $75,000 | $70,200 | $85,000 | $445,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $140,000 | $100,000 | $129,400 | $55,515 | $70,500 | $100,000 | $100,000 | 2% |
| 608E52000 CURB RAMP | 3,950 SF | $15.00 | $15.00 | $17.00 | $13.90 | $22.00 | $25.35 | $26.00 | $13.95 | 2% |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 15 EACH | $3,800 | $4,050 | $3,688 | $4,000 | $5,200 | $4,600 | $3,500 | $6,000 | 2% |
| 611E99574 MANHOLE, NO. 3 | 7 EACH | $8,000 | $7,700 | $3,019 | $6,000 | $3,650 | $12,250 | $5,500 | $8,000 | 2% |
| 203E10000 EXCAVATION | 5,130 CY | $10.00 | $15.00 | $23.75 | $16.50 | $15.00 | $18.65 | $26.00 | $30.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $45,000 | $20,000 | $61,740 | $20,000 | $28,000 | $40,000 | $40,000 | $21,000 | 2% |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 668 SY | $57.00 | $54.00 | $60.00 | $64.00 | $57.00 | $85.00 | $105 | $51.75 | 2% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,181 CY | $16.00 | $40.00 | $60.00 | $56.50 | $45.00 | $52.00 | $60.00 | $80.00 | 1% |
| 202E30900 PORTION OF TRAFFIC ISLAND REMOVED | 8 SY | $50.00 | $45.00 | $55.00 | $34.00 | $110 | $110 | $35.00 | $50.00 |
| 202E32000 CURB REMOVED | 13,275 FT | $0.50 | $0.25 | $3.00 | $2.68 | $6.00 | $0.50 | $1.00 | $2.50 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $500 | $700 | $411 | $450 | $680 | $705 | $175 | $400 |
| 203E20000 EMBANKMENT | 400 CY | $6.00 | $15.00 | $13.50 | $11.00 | $8.00 | $17.55 | $14.00 | $40.00 |
| 204E10000 SUBGRADE COMPACTION | 25,750 SY | $0.50 | $0.50 | $1.00 | $0.65 | $1.25 | $1.05 | $3.00 | $0.20 |
| 204E13000 EXCAVATION OF SUBGRADE | 2,181 CY | $12.00 | $10.00 | $25.50 | $14.55 | $9.00 | $22.00 | $15.00 | $40.00 |
| 204E45000 PROOF ROLLING | 9 HOUR | $100 | $250 | $107 | $130 | $250 | $200 | $211 | $200 |
| 608E10000 4" CONCRETE WALK | 1,922 SF | $8.00 | $8.00 | $8.50 | $4.50 | $8.00 | $9.50 | $12.00 | $7.25 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 12 EACH | $100 | $600 | $231 | $430 | $500 | $825 | $620 | $950 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $200 | $170 | $50.00 | $130 | $500 | $80.00 | $50.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 13,233 SY | $1.50 | $1.40 | $1.50 | $0.73 | $2.00 | $2.00 | $2.00 | $0.73 |
| 659E14000 REPAIR SEEDING AND MULCHING | 665 SY | $1.00 | $0.50 | $1.00 | $1.00 | $0.65 | $1.00 | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 665 SY | $1.00 | $0.50 | $1.00 | $0.10 | $0.65 | $1.00 | $1.00 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 1.85 TON | $1,000 | $1,000 | $773 | $600 | $1,100 | $500 | $1,050 | $600 |
| 659E31000 LIME | 2.7 ACRE | $100 | $90.00 | $515 | $1.00 | $100 | $500 | $94.00 | $0.01 |
| 659E35000 WATER | 417 MGAL | $1.00 | $1.00 | $1.00 | $0.25 | $1.00 | $10.00 | $1.00 | $0.01 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,000 | $1,850 | $1,854 | $2,000 | $3,200 | $1,800 | $2,000 | $1,850 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,000 | $3,350 | $5,562 | $4,500 | $6,500 | $3,500 | $5,300 | $4,935 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $5,000 | $15,000 | $5,665 | $8,500 | $10,500 | $8,000 | $8,800 | $8,300 |
| 611E01500 6" CONDUIT, TYPE F | 1,430 FT | $12.00 | $19.00 | $14.50 | $5.50 | $9.50 | $16.50 | $27.00 | $20.00 |
| 611E04400 12" CONDUIT, TYPE B | 192 FT | $50.00 | $100 | $98.00 | $215 | $135 | $98.25 | $88.00 | $135 |
| 611E98180 CATCH BASIN, NO. 3A | 8 EACH | $3,000 | $3,350 | $2,429 | $3,000 | $2,600 | $3,540 | $2,500 | $3,000 |
| 611E98371 CATCH BASIN, NO. 6, AS PER PLAN | 1 EACH | $6,000 | $3,460 | $2,892 | $2,300 | $4,300 | $4,275 | $2,300 | $4,500 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 7 EACH | $500 | $750 | $480 | $875 | $350 | $935 | $650 | $1,400 |
| 611E99584 MANHOLE, NO. 3 WITH 96" BASE I.D. AND 9" WEIR | 2 EACH | $7,500 | $18,000 | $6,683 | $6,400 | $12,500 | $18,245 | $8,800 | $16,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 36 EACH | $500 | $700 | $480 | $665 | $450 | $935 | $1,050 | $1,200 |
| 895E10020 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 2 | 1 EACH | $15,000 | $27,000 | $27,763 | $24,000 | $25,500 | $34,900 | $32,000 | $27,000 |
| 895E10030 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 3 | 1 EACH | $20,000 | $30,000 | $16,639 | $24,000 | $24,500 | $36,550 | $37,000 | $43,000 |
| 407E20000 NON-TRACKING TACK COAT | 2,825 GAL | $2.00 | $3.00 | $3.50 | $2.50 | $4.00 | $3.60 | $4.00 | $2.50 |
| 863E00100 GEOGRID, TYPE P1 | 6,542 SY | $5.00 | $1.50 | $1.50 | $1.60 | $3.00 | $4.45 | $2.00 | $3.50 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,331 LB | $5.00 | $2.00 | $2.00 | $3.00 | $2.50 | $2.00 | $5.00 | $4.00 |
| 638E01205 8" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, PUS | 167 FT | $200 | $235 | $185 | $185 | $175 | $148 | $141 | $100 |
| 638E02405 12" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, PU | 138 FT | $250 | $350 | $250 | $310 | $230 | $199 | $182 | $150 |
| 638E07490 8" GATE VALVE | 3 EACH | $2,000 | $1,450 | $1,231 | $2,550 | $1,900 | $3,355 | $1,450 | $2,500 |
| 638E07500 12" GATE VALVE | 2 EACH | $2,500 | $2,450 | $1,392 | $3,500 | $3,250 | $5,385 | $2,600 | $3,000 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 6 EACH | $1,000 | $1,000 | $1,492 | $1,350 | $1,200 | $1,275 | $985 | $4,500 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 30 EACH | $300 | $335 | $240 | $500 | $250 | $740 | $400 | $600 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 15 EACH | $200 | $335 | $240 | $41.00 | $150 | $125 | $230 | $600 |
| 638E98100 WATER WORK, MISC.:TEMPORARY WATER SERVICE | 1 LS | $15,000 | $6,900 | $5,498 | $4,500 | $12,800 | $8,500 | $4,300 | $10,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 28 EACH | $500 | $400 | $480 | $650 | $400 | $935 | $1,200 | $1,400 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 63 FT | $12.00 | $6.30 | $11.50 | $6.30 | $7.00 | $10.00 | $9.00 | $6.30 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 547 FT | $13.00 | $7.00 | $9.00 | $7.00 | $8.00 | $11.00 | $8.00 | $7.00 |
| 630E08600 SIGN POST REFLECTOR | 23 EACH | $50.00 | $47.00 | $30.00 | $46.85 | $52.00 | $45.00 | $50.00 | $46.85 |
| 630E80100 SIGN, FLAT SHEET | 286 SF | $20.00 | $16.50 | $13.50 | $16.40 | $18.00 | $15.00 | $20.00 | $16.40 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 42 EACH | $20.00 | $30.00 | $16.50 | $29.60 | $33.00 | $30.00 | $35.00 | $29.60 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 6 EACH | $20.00 | $61.00 | $35.00 | $60.95 | $67.00 | $35.00 | $70.00 | $60.95 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 45 EACH | $20.00 | $39.00 | $23.50 | $39.00 | $43.00 | $30.00 | $50.00 | $39.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 1 EACH | $20.00 | $73.25 | $46.50 | $73.20 | $81.00 | $20.00 | $80.00 | $73.20 |
| 644E00300 CENTER LINE | 1.05 MILE | $6,000 | $5,200 | $8,117 | $5,200 | $5,800 | $7,880 | $9,000 | $5,200 |
| 644E00400 CHANNELIZING LINE, 8" | 449 FT | $1.50 | $1.30 | $1.00 | $1.30 | $1.50 | $1.15 | $1.25 | $1.30 |
| 644E00500 STOP LINE | 431 FT | $6.00 | $5.75 | $5.00 | $5.75 | $6.25 | $4.65 | $6.00 | $5.75 |
| 644E00600 CROSSWALK LINE | 2,366 FT | $3.00 | $2.80 | $2.50 | $2.80 | $3.00 | $2.65 | $3.00 | $2.80 |
| 644E01100 SCHOOL SYMBOL MARKING, 72" | 3 EACH | $750 | $475 | $361 | $475 | $525 | $350 | $400 | $475 |
| 644E01300 LANE ARROW | 9 EACH | $150 | $95.00 | $98.00 | $95.00 | $105 | $95.00 | $150 | $95.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $100 | $70.00 | $67.00 | $65.00 | $50.00 | $75.00 | $100 | $65.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $200 | $250 | $223 | $180 | $180 | $205 | $250 | $150 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 2.1 MILE | $1,000 | $900 | $654 | $900 | $990 | $635 | $700 | $900 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 2.84 MILE | $1,800 | $525 | $2,606 | $525 | $580 | $2,530 | $3,000 | $525 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 898 FT | $1.00 | $0.70 | $0.50 | $0.70 | $1.00 | $0.45 | $0.60 | $0.70 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 952 FT | $4.00 | $2.30 | $2.50 | $2.30 | $3.00 | $2.25 | $2.50 | $2.30 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 4,742 FT | $2.00 | $1.50 | $1.00 | $1.50 | $2.00 | $1.00 | $2.00 | $1.50 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 18 EACH | $50.00 | $46.00 | $46.50 | $46.00 | $51.00 | $45.00 | $50.00 | $46.00 |
| 614E31720 WORK ZONE SCHOOL SYMBOL MARKING, 72", CLASS I, 642 | 6 EACH | $250 | $180 | $258 | $180 | $200 | $250 | $300 | $180 |
| 616E10000 WATER | 100 MGAL | $10.00 | $55.00 | $29.00 | $5.00 | $2.00 | $30.00 | $40.00 | $100 |
| 619E16010 FIELD OFFICE, TYPE B | 7 MNTH | $2,500 | $1,600 | $1,155 | $2,000 | $1,150 | $1,980 | $3,700 | $2,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $35,000 | $33,088 | $36,000 | $39,900 | $30,350 | $50,000 | $33,450 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 3,923 CY | $125 | $490k | 16% |
| 202E23000 PAVEMENT REMOVED | 27,016 SY | $8 | $216k | 7% |
| 304E20000 AGGREGATE BASE | 4,168 CY | $50 | $208k | 7% |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 81 EACH | $2,500 | $203k | 7% |
| 609E26000 CURB, TYPE 6 | 13,275 FT | $14 | $186k | 6% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1144 CY | $140 | $160k | 5% |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 700 CY | $200 | $140k | 5% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 11,694 FT | $11 | $129k | 4% |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 2,756 SY | $46 | $127k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 817 CY | $150 | $123k | 4% |