LOR-Findley State Park Main Rd
LOR County · est $0.6M
Bid dateThursday, March 12—
LOR County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 17 more items below.
| Item | Quantity | R1Chagrin Valley Paving INC | R2Barbicas Construction Company INC | R3Kokosing Construction Company INC | R4Cross-roads Asphalt Recycling INC | R5Erie Blacktop INC | % of bid |
|---|---|---|---|---|---|---|---|
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,655 CY | $154 | $160 | $171 | $155 | $158 | 50% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 517 CY | $200 | $150 | $210 | $200 | $215 | 20% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $7,500 | $5,000 | $8,555 | $22,500 | 7% |
| Item | Quantity | R1Chagrin Valley Paving INC | R2Barbicas Construction Company INC | R3Kokosing Construction Company INC | R4Cross-roads Asphalt Recycling INC | R5Erie Blacktop INC |
|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 2 FT | $250 | $100 | $50.00 | $25.00 | $125 |
| 209E60500 LINEAR GRADING | 6.56 MILE | $100 | $650 | $1,500 | $2,100 | $2,400 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $200 | $50.00 | $500 | $125 |
| 659E14000 REPAIR SEEDING AND MULCHING | 5 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 755 CY |
| $30.00 |
| $70.00 |
| $30.00 |
| $52.00 |
| $58.00 |
| 4% |
| 624E10000 MOBILIZATION | 1 LS | $22,300 | $10,000 | $40,000 | $20,000 | $10,000 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (0.75") | 39,320 SY | $0.50 | $1.25 | $0.70 | $1.35 | $1.00 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $11,500 | $2,700 | $3,750 | $2,200 | 1% |
| 407E10000 TACK COAT | 3,556 GAL | $2.00 | $2.40 | $1.66 | $2.00 | $2.15 | 1% |
| 253E02000 PAVEMENT REPAIR | 30 CY | $200 | $150 | $300 | $200 | $275 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 2,963 GAL | $2.00 | $4.25 | $3.50 | $4.00 | $3.50 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 642E00100 EDGE LINE, 4", TYPE 1 (WHITE) | 5.92 MILE | $650 | $650 | $650 | $650 | $685 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 3.16 MILE | $1,200 | $1,200 | $600 | $1,200 | $1,260 | 1% |
| 203E20000 EMBANKMENT | 48 CY | $70.00 | $75.00 | $70.00 | $80.00 | $65.00 | 1% |
| 203E10000 EXCAVATION | 123 CY | $25.00 | $75.00 | $60.00 | $25.00 | $30.00 | 1% |
| 642E00300 CENTER LINE, TYPE 1 | 3.13 MILE | $900 | $900 | $900 | $900 | $945 | 1% |
| 659E00300 TOPSOIL | 10 CY | $250 | $70.00 | $75.00 | $195 | $100 | 0% |
| 659E10000 SEEDING AND MULCHING | 86 SY | $20.00 | $3.00 | $17.00 | $24.00 | $7.00 | 0% |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 311 FT | $5.50 | $5.50 | $2.50 | $5.50 | $5.80 | 0% |
| 202E23000 PAVEMENT REMOVED | 66 SY | $20.00 | $10.00 | $13.00 | $20.50 | $8.00 | 0% |
| $35.00 |
| $3.00 |
| $3.00 |
| $35.00 |
| $15.00 |
| 659E15000 INTER-SEEDING | 5 SY | $35.00 | $3.00 | $0.60 | $35.00 | $0.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $992 | $800 | $700 | $1,000 | $865 |
| 659E31000 LIME | 0.02 ACRE | $500 | $700 | $45.00 | $500 | $635 |
| 659E35000 WATER | 1 MGAL | $1.00 | $10.00 | $1.00 | $1.00 | $20.00 |
| 611E01800 8" CONDUIT, TYPE B | 5 FT | $250 | $150 | $300 | $45.00 | $150 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 60 FT | $5.00 | $4.00 | $5.00 | $2.00 | $6.85 |
| 254E01600 PATCHING PLANED SURFACE | 211 SY | $5.00 | $2.00 | $2.00 | $8.50 | $10.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 (YELLOW) | 0.46 MILE | $650 | $650 | $650 | $650 | $685 |
| AA1 642E00500 STOP LINE, TYPE 1(ALTERNATE 1) | 311 FT | $3.50 | $3.50 | $3.50 | $3.50 | $3.70 |
| AA1 642E01322 WRONG WAY ARROW, TYPE 1(ALTERNATE 1) | 10 EACH | $100 | $100 | $100 | $100 | $105 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $90.00 | $200 | $200 | $215 | $320 |
| 846E00111 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, A | 34 CF | $25.00 | $500 | $520 | $525 | $325 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $100 | $500 | $2,000 | $2,500 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 1,655 CY | $154 | $255k | 49% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 517 CY | $200 | $103k | 20% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 7% |
| 617E10100 COMPACTED AGGREGATE | 755 CY | $30 | $23k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $22,300 | $22k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (0.75") | 39,320 SY | $0.5 | $20k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $8k | 1% |
| 407E10000 TACK COAT | 3,556 GAL | $2 | $7k | 1% |
| 253E02000 PAVEMENT REPAIR | 30 CY | $200 | $6k | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 2,963 GAL | $2 | $6k | 1% |