BEL-SR 9-16.18/16.74
BEL County · est $0.5M
Bid dateThursday, April 9—
BEL County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 55 more items below.
| Item | Quantity | R1Bog Construction INC | R2Stanley Miller Construction Company | R3Shelly & Sands INC | R4Eclipse CO LLC | R5Ohio-west Virginia Excavating CO | R6R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 2,200 DLR | $34.00 | $40.00 | $44.00 | $44.00 | $44.00 | $44.00 | 19% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 600 FT | $52.00 | $24.50 | $25.50 | $25.00 | $38.11 | $55.00 | 8% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 265 FT | $110 |
| Item | Quantity | R1Bog Construction INC | R2Stanley Miller Construction Company | R3Shelly & Sands INC | R4Eclipse CO LLC | R5Ohio-west Virginia Excavating CO | R6R C Construction Company And Son INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $2,167 | $7,460 | $14,380 | $8,000 | $2,500 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 47 FT | $40.00 | $17.00 | $8.00 | $13.00 | $48.00 | $40.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 20 FT | $40.00 | $11.00 | $10.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $122 |
| $145 |
| $168 |
| $121 |
| $125 |
| 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 98 CY | $288 | $277 | $294 | $280 | $271 | $375 | 7% |
| 511E81300 CONCRETE, MISC.: 8"x24"x69" PRECAST CONCRETE LAGGI | 113 EACH | $240 | $218 | $238 | $212 | $384 | $425 | 7% |
| 602E20000 CONCRETE MASONRY | 16.1 CY | $1,500 | $624 | $1,100 | $2,498 | $1,680 | $850 | 6% |
| 611E53100 43" X 68" CONDUIT, TYPE A, 706.04 | 59 FT | $400 | $459 | $400 | $531 | $838 | $325 | 6% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 180 FT | $115 | $142 | $175 | $133 | $186 | $125 | 5% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 135 CY | $125 | $164 | $180 | $180 | $90.00 | $25.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $16,000 | $24,538 | $20,000 | $42,092 | $10,500 | $15,000 | 4% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 498 CY | $29.00 | $50.00 | $45.00 | $18.00 | $107 | $50.00 | 4% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 475 SY | $28.00 | $11.00 | $14.00 | $17.50 | $29.40 | $20.00 | 3% |
| 304E20000 AGGREGATE BASE | 140 CY | $85.00 | $128 | $95.00 | $96.00 | $126 | $125 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 28 CY | $416 | $293 | $497 | $355 | $913 | $475 | 3% |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 148 CY | $70.00 | $104 | $75.00 | $84.50 | $115 | $150 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (23 CY | $440 | $418 | $315 | $430 | $438 | $475 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $7,288 | $5,000 | $17,000 | $8,675 | $18,000 | 3% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 27 CY | $300 | $403 | $455 | $730 | $782 | $425 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/4" | 357 SY | $22.00 | $21.12 | $22.00 | $10.00 | $15.20 | $40.00 | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 95 CY | $75.00 | $115 | $160 | $99.50 | $184 | $225 | 2% |
| $32.50 |
| $45.00 |
| $100 |
| 202E38000 GUARDRAIL REMOVED | 434 FT | $4.00 | $2.00 | $1.50 | $3.50 | $8.00 | $3.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 21 FT | $100 | $142 | $100 | $120 | $260 | $175 |
| 202E98000 REMOVAL MISC.: PILING REMOVED | 1 LS | $5,000 | $168 | $5,500 | $9,213 | $2,270 | $15,000 |
| 203E10000 EXCAVATION | 150 CY | $20.00 | $23.00 | $20.00 | $22.50 | $35.00 | $25.00 |
| 203E20000 EMBANKMENT | 72 CY | $30.00 | $78.00 | $20.00 | $27.50 | $59.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 537 SY | $3.00 | $1.00 | $3.00 | $4.50 | $2.00 | $2.00 |
| 204E50000 GEOTEXTILE FABRIC | 20 SY | $10.00 | $17.35 | $3.00 | $10.00 | $6.00 | $5.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 168.75 FT | $18.00 | $27.16 | $16.40 | $17.50 | $20.40 | $55.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 156.25 FT | $20.00 | $31.67 | $18.00 | $19.00 | $23.00 | $55.00 |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 237.5 FT | $26.00 | $43.17 | $24.60 | $26.00 | $30.50 | $65.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $1,200 | $1,495 | $1,175 | $1,236 | $1,450 | $1,500 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $2,000 | $2,395 | $1,895 | $1,994 | $2,350 | $1,500 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 1 EACH | $2,400 | $2,945 | $2,245 | $2,362 | $2,800 | $2,500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,000 | $973 | $985 | $1,036 | $1,225 | $1,500 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $250 | $250 | $195 | $479 | $350 | $250 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 7 CY | $100 | $185 | $150 | $117 | $290 | $125 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $50.00 | $100 | $88.00 | $132 | $62.00 | $20.00 |
| 659E00300 TOPSOIL | 22 CY | $30.00 | $65.00 | $55.00 | $79.00 | $83.50 | $50.00 |
| 659E10000 SEEDING AND MULCHING | 194 SY | $17.00 | $3.00 | $9.25 | $12.50 | $5.50 | $10.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 10 SY | $2.00 | $1.00 | $0.69 | $1.50 | $46.00 | $0.20 |
| 659E15000 INTER-SEEDING | 10 SY | $2.00 | $1.00 | $0.69 | $0.50 | $64.00 | $0.20 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $2,000 | $800 | $876 | $1,620 | $1,900 | $1,200 |
| 659E31000 LIME | 0.04 ACRE | $100 | $100 | $154 | $79.00 | $1,900 | $800 |
| 659E35000 WATER | 1 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $540 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00900 6" CONDUIT, TYPE B | 20 FT | $15.00 | $5.00 | $15.00 | $31.50 | $26.00 | $10.00 |
| 611E01100 6" CONDUIT, TYPE C | 20 FT | $15.00 | $5.00 | $15.00 | $26.50 | $26.00 | $10.00 |
| 611E01400 6" CONDUIT, TYPE E | 20 FT | $15.00 | $5.00 | $15.00 | $25.00 | $26.00 | $10.00 |
| 611E01500 6" CONDUIT, TYPE F | 20 FT | $15.00 | $5.00 | $15.00 | $25.00 | $26.00 | $10.00 |
| 611E03100 10" CONDUIT, TYPE B | 12 FT | $50.00 | $61.00 | $100 | $99.50 | $98.00 | $10.00 |
| 611E10400 24" CONDUIT, TYPE B | 44 FT | $100 | $56.25 | $160 | $185 | $138 | $175 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $3,500 | $1,511 | $2,700 | $2,399 | $2,400 | $3,500 |
| 407E10000 TACK COAT | 70 GAL | $5.00 | $3.70 | $2.00 | $3.50 | $18.50 | $10.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 12 GAL | $10.00 | $144 | $44.00 | $130 | $97.00 | $20.00 |
| 621E00100 RPM | 10 EACH | $320 | $201 | $225 | $221 | $366 | $650 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 10 EACH | $50.00 | $26.00 | $20.00 | $9.50 | $28.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 11 EACH | $10.00 | $13.34 | $8.00 | $10.00 | $15.00 | $25.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.12 MILE | $5,500 | $17,345 | $4,750 | $11,045 | $5,900 | $12,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $15,000 | $23,123 | $10,000 | $11,466 | $12,400 | $12,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,500 | $4,706 | $5,000 | $5,632 | $6,350 | $15,000 |
| 617E10100 COMPACTED AGGREGATE | 10 CY | $65.00 | $149 | $150 | $160 | $134 | $10.00 |
| 507E00400 STEEL PILES, MISC.: W18x76 STEEL BEAMS, FURNISHED | 40 FT | $150 | $46.00 | $47.50 | $42.00 | $57.00 | $65.00 |
| 511E71100 CONCRETE, MISC.: CAST-IN-PLACE CONCRETE LAGGING | 4 CY | $700 | $2,081 | $5,900 | $4,682 | $2,045 | $1,500 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 169 FT | $5.00 | $6.00 | $4.75 | $7.00 | $6.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 9 FT | $20.00 | $26.00 | $45.00 | $52.00 | $21.00 | $10.00 |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 15 FT | $110 | $195 | $330 | $165 | $158 | $140 |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 12 FT | $175 | $213 | $250 | $194 | $232 | $140 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $400 | $173 | $500 | $180 | $271 | $275 |
| 690E98400 SPECIAL - SHEETING LEFT IN PLACE | 1 LS | $3,500 | $1,217 | $2,275 | $6,200 | $2,100 | $40,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,000 | $32,028 | $15,500 | $6,500 | $18,640 | $35,000 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $500 | $1,000 | $2,600 | $600 | $1,500 | $100 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $29,667 | $15,000 | $19,500 | $995 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 2,200 DLR | $34 | $75k | 15% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 600 FT | $52 | $31k | 6% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 265 FT | $110 | $29k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 98 CY | $288 | $28k | 6% |
| 511E81300 CONCRETE, MISC.: 8"x24"x69" PRECAST CONCRETE LAGGI | 113 EACH | $240 | $27k | 5% |
| 602E20000 CONCRETE MASONRY | 16.1 CY | $1,500 | $24k | 5% |
| 611E53100 43" X 68" CONDUIT, TYPE A, 706.04 | 59 FT | $400 | $24k | 5% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 180 FT | $115 | $21k | 4% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 135 CY | $125 | $17k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $16,000 | $16k | 3% |