BEL-BARKCAMP ODNR BRIDGES
BEL County · est $0.3M
Bid dateThursday, April 23—
BEL County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 15 more items below.
| Item | Quantity | R1Bog Construction INC | R2Ohio-west Virginia Excavating CO | R3J & J Bridge Company INC | R4Stanley Miller Construction Company | R5Suburban Maintenance & Construction | % of bid |
|---|---|---|---|---|---|---|---|
| 507E71200 SPECIAL - PILE ENCASEMENT | 180 FT | $125 | $165 | $130 | $188 | $200 | 9% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 180 FT | $125 | $165 | $130 | $188 | $200 | 9% |
| 606E26551 ANCHOR ASSEMBLY, MGS TYPE T, AS PER PLAN | 16 EACH | $1,250 | $1,250 | $1,000 | $1,278 | $1,800 | 8% |
| 519E11101 |
| Item | Quantity | R1Bog Construction INC | R2Ohio-west Virginia Excavating CO | R3J & J Bridge Company INC | R4Stanley Miller Construction Company | R5Suburban Maintenance & Construction |
|---|---|---|---|---|---|---|
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 1,090 FT | $1.50 | $1.25 | $2.00 | $2.00 | $3.50 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 11 STA | $60.00 | $50.00 | $300 | $45.00 | $200 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $110 | $50.00 | $100 | $100 |
| 659E20000 COMMERCIAL FERTILIZER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 185 SF |
| $105 |
| $75.00 |
| $225 |
| $119 |
| $115 |
| 8% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 875 FT | $21.00 | $25.00 | $18.00 | $21.80 | $22.25 | 8% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 2,058 LB | $8.00 | $8.00 | $9.17 | $9.86 | $18.00 | 7% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 2,058 LB | $8.00 | $8.00 | $9.17 | $9.86 | $18.00 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $10,000 | $7,500 | $31,180 | $20,000 | 6% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 140 SF | $105 | $77.00 | $225 | $119 | $115 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $11,000 | $12,000 | $100 | $11,389 | $10,000 | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $10,000 | $12,000 | $100 | $11,278 | $10,000 | 4% |
| 659E00300 TOPSOIL | 190 CY | $45.00 | $45.00 | $5.00 | $38.00 | $45.00 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $2,500 | $13,250 | $4,000 | $12,000 | 3% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 176 CY | $45.00 | $74.00 | $110 | $101 | $100 | 3% |
| 659E10000 SEEDING AND MULCHING | 1,712 SY | $3.50 | $2.00 | $0.50 | $2.50 | $2.50 | 3% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 209 SY | $28.00 | $27.00 | $92.00 | $22.00 | $28.00 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 207 SY | $28.00 | $27.00 | $92.00 | $22.00 | $28.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,500 | $14,000 | $5,000 | $4,445 | $20,000 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $1,600 | $100 | $1,611 | $12,000 | 1% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,500 | $8,800 | $5,400 | $6,889 | $20,000 | 1% |
| 0.23 TON |
| $1,000 |
| $850 |
| $500 |
| $800 |
| $500 |
| 659E31000 LIME | 0.35 ACRE | $100 | $200 | $500 | $200 | $500 |
| 659E35000 WATER | 9 MGAL | $1.00 | $10.00 | $10.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 25 EACH | $10.00 | $10.00 | $10.00 | $8.90 | $50.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 36 FT | $15.00 | $15.00 | $5.00 | $15.30 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 86 FT | $17.00 | $18.00 | $10.00 | $16.70 | $12.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 15 EACH | $75.00 | $50.00 | $15.00 | $61.00 | $55.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 9 EACH | $100 | $18.00 | $10.00 | $17.00 | $75.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,500 | $8,800 | $5,400 | $6,889 | $20,000 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $500 | $700 | $1,000 | $1,000 | $900 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $1,000 | $100 | $12,167 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E71200 SPECIAL - PILE ENCASEMENT | 180 FT | $125 | $23k | 9% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 180 FT | $125 | $23k | 9% |
| 606E26551 ANCHOR ASSEMBLY, MGS TYPE T, AS PER PLAN | 16 EACH | $1,250 | $20k | 8% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 185 SF | $105 | $19k | 8% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 875 FT | $21 | $18k | 7% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 2,058 LB | $8 | $16k | 6% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 2,058 LB | $8 | $16k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 6% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 140 SF | $105 | $15k | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $11,000 | $11k | 4% |