BUT-SR 73-13.05
BUT County · est $2.8M
Bid dateThursday, May 7—
BUT County · est $2.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 155 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2R B Jergens Contractors INC | R3Rack & Ballauer Excavating CO INC | R4Sunesis Construction CO | R5Milcon Concrete INC | R6Eclipse CO LLC | R7Ford Development CORP | R8John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 7,459 SY | $33.50 | $40.97 | $57.00 | $45.63 | $40.20 | $47.00 | $50.00 | $37.32 | 13% |
| 203E20000 EMBANKMENT | 16,115 CY | $15.00 | $10.69 | $16.00 | $12.60 | $15.00 |
| Item | Quantity | R1Barrett Paving Materials INC | R2R B Jergens Contractors INC | R3Rack & Ballauer Excavating CO INC | R4Sunesis Construction CO | R5Milcon Concrete INC | R6Eclipse CO LLC | R7Ford Development CORP | R8John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,000 | $24,865 | $30,000 | $23,300 | $8,300 | $11,521 | $30,000 | $29,969 |
| 202E23000 PAVEMENT REMOVED | 553 SY | $7.00 | $14.48 | $13.00 | $24.84 | $6.70 | $13.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $12.00 |
| $30.00 |
| $15.91 |
| 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $230,000 | $70,879 | $65,000 | $191,542 | $288,780 | $291,971 | $415,200 | $557,829 | 12% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,271 CY | $102 | $119 | $112 | $113 | $127 | $112 | $123 | $142 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $91,812 | $75,000 | $108,587 | $40,923 | $120,657 | $100,000 | $100,000 | 5% |
| 659E00300 TOPSOIL | 2,182 CY | $43.50 | $45.11 | $43.50 | $14.65 | $18.50 | $30.50 | $49.00 | $39.75 | 5% |
| 609E72001 CONCRETE MEDIAN, AS PER PLAN | 1,255 SY | $74.00 | $91.63 | $74.00 | $65.66 | $90.40 | $79.50 | $90.00 | $66.42 | 5% |
| 304E20000 AGGREGATE BASE | 1,897 CY | $48.00 | $51.38 | $42.00 | $67.66 | $39.50 | $49.50 | $55.00 | $56.29 | 5% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $91,000 | $65,288 | $68,000 | $53,759 | $94,100 | $33,124 | $50,000 | $25,147 | 5% |
| 832E30000 EROSION CONTROL | 82,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 3,161 FT | $20.00 | $19.56 | $23.00 | $28.02 | $24.80 | $26.50 | $26.00 | $26.03 | 3% |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 11,021 SY | $5.40 | $4.14 | $4.25 | $6.72 | $6.50 | $3.50 | $3.60 | $4.20 | 3% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 423 CY | $140 | $169 | $158 | $158 | $179 | $158 | $174 | $196 | 3% |
| 638E01140 6" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTINGS | 1,002 FT | $59.00 | $40.20 | $60.00 | $42.20 | $36.10 | $44.50 | $50.00 | $61.04 | 3% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 317 CY | $180 | $222 | $208 | $208 | $236 | $209 | $230 | $219 | 3% |
| 611E95521 10' X 9' CONDUIT, TYPE A, 706.05, AS PER PLAN | — | $1,300 | $1,673 | $1,860 | $2,064 | $1,343 | $2,032 | $1,600 | $2,500 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,590 FT | $13.50 | $14.00 | $13.50 | $13.50 | $18.50 | $14.00 | $15.00 | $17.07 | 3% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 3,996 FT | $11.00 | $5.43 | $7.75 | $6.65 | $6.60 | $8.00 | $10.00 | $9.64 | 2% |
| 206E10500 CEMENT | 285 TON | $147 | $176 | $163 | $163 | $167 | $168 | $180 | $208 | 2% |
| 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4 | 1 EACH | $41,500 | $31,955 | $35,000 | $55,253 | $49,284 | $54,128 | $40,000 | $49,367 | 2% |
| $5.00 |
| $9.57 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 8,475 SY | $4.50 | $4.24 | $4.25 | $11.21 | $5.40 | $7.50 | $4.00 | $10.23 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 735 FT | $16.00 | $22.57 | $11.00 | $11.86 | $13.50 | $20.50 | $5.00 | $27.49 |
| 202E35200 PIPE REMOVED, OVER 24" | 263 FT | $22.50 | $33.43 | $26.00 | $49.16 | $37.70 | $29.50 | $10.00 | $49.52 |
| 202E38000 GUARDRAIL REMOVED | 457 FT | $4.00 | $6.22 | $6.00 | $4.85 | $6.80 | $5.00 | $1.00 | $5.50 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $200 | $259 | $300 | $277 | $283 | $537 | $50.00 | $278 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $50.00 | $312 | $65.00 | $60.28 | $37.00 | $162 | $10.00 | $209 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $300 | $265 | $400 | $415 | $330 | $471 | $100 | $1,806 |
| 202E75000 FENCE REMOVED | 926 FT | $2.00 | $6.22 | $4.25 | $3.00 | $4.00 | $4.00 | $1.00 | $6.90 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 2 EACH | $105 | $82.21 | $150 | $1,266 | $160 | $471 | $50.00 | $658 |
| 202E98200 REMOVAL MISC.: CONDUIT | 300 FT | $10.00 | $8.04 | $10.00 | $6.98 | $9.00 | $19.00 | $2.00 | $47.05 |
| 202E98200 REMOVAL MISC.: DECORATIVE WALL | 43 FT | $20.00 | $8.04 | $12.50 | $87.25 | $45.00 | $77.50 | $10.00 | $219 |
| 203E10000 EXCAVATION | 2,547 CY | $12.75 | $17.52 | $10.00 | $10.48 | $11.00 | $12.00 | $20.00 | $10.23 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $15.00 | $10.69 | $16.00 | $33.22 | $30.25 | $18.50 | $35.00 | $89.29 |
| 204E10000 SUBGRADE COMPACTION | 1,315 SY | $3.50 | $3.93 | $3.50 | $4.15 | $1.40 | $2.50 | $2.00 | $2.28 |
| 204E45000 PROOF ROLLING | 6 HOUR | $100 | $219 | $180 | $270 | $235 | $961 | $100 | $189 |
| 206E11000 CURING COAT | 11,021 SY | $1.25 | $1.19 | $1.13 | $1.13 | $1.40 | $1.00 | $1.25 | $1.48 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $12,500 | $5,600 | $12,515 | $12,515 | $14,160 | $12,891 | $14,000 | $12,600 |
| 623E38500 MONUMENT ASSEMBLY | 9 EACH | $580 | $934 | $875 | $861 | $850 | $1,123 | $700 | $717 |
| 623E40500 REFERENCE MONUMENT | 1 EACH | $415 | $509 | $375 | $328 | $90.00 | $614 | $300 | $365 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 12 EACH | $200 | $519 | $280 | $365 | $195 | $117 | $100 | $335 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $24,600 | $28,701 | $25,060 | $18,200 | $84,990 | $15,142 | $25,000 | $51,350 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 8 SY | $60.00 | $46.59 | $90.00 | $196 | $60.00 | $103 | $50.00 | $91.88 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 21 SY | $60.00 | $75.56 | $90.00 | $197 | $60.00 | $103 | $50.00 | $433 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 24 CY | $105 | $128 | $130 | $111 | $125 | $83.50 | $100 | $183 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $120 | $132 | $170 | $101 | $125 | $83.50 | $100 | $598 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $125 | $130 | $125 | $125 | $65.00 | $146 | $137 | $125 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 14,138 SY | $0.90 | $0.91 | $0.88 | $1.12 | $0.75 | $0.50 | $1.00 | $0.88 |
| 659E14000 REPAIR SEEDING AND MULCHING | 967 SY | $0.85 | $0.91 | $0.88 | $0.30 | $0.30 | $0.50 | $1.00 | $0.88 |
| 659E15000 INTER-SEEDING | 967 SY | $0.30 | $0.91 | $0.30 | $0.30 | $0.30 | $0.50 | $0.40 | $0.30 |
| 659E20000 COMMERCIAL FERTILIZER | 2.61 TON | $775 | $804 | $775 | $900 | $900 | $927 | $850 | $775 |
| 659E31000 LIME | 4 ACRE | $35.00 | $36.30 | $35.00 | $250 | $250 | $258 | $39.00 | $35.00 |
| 659E35000 WATER | 105 MGAL | $1.00 | $1.04 | $1.00 | $10.00 | $10.00 | $10.50 | $2.00 | $1.00 |
| 659E40000 MOWING | 44 MSF | $7.95 | $8.24 | $7.95 | $10.00 | $10.00 | $10.50 | $9.00 | $7.95 |
| 670E00700 DITCH EROSION PROTECTION | 283 SY | $2.30 | $2.39 | $2.30 | $2.00 | $2.30 | $2.00 | $3.00 | $2.30 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,275 | $1,659 | $1,300 | $1,600 | $1,444 | $3,605 | $2,000 | $1,275 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,000 | $24,890 | $10,600 | $12,180 | $11,720 | $10,815 | $3,000 | $6,840 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $12,500 | $15,556 | $12,500 | $12,451 | $14,100 | $7,725 | $14,000 | $12,451 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 112 SY | $9.55 | $9.90 | $9.55 | $5.00 | $5.70 | $5.00 | $11.00 | $9.55 |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 110 SY | $10.90 | $11.30 | $10.90 | $5.00 | $5.70 | $5.00 | $12.00 | $10.90 |
| 602E20000 CONCRETE MASONRY | 3 CY | $1,350 | $2,057 | $1,370 | $2,728 | $1,945 | $1,276 | $1,300 | $2,406 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 80 FT | $14.00 | $27.13 | $12.00 | $10.37 | $19.20 | $10.00 | $12.00 | $32.60 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 284 FT | $11.00 | $14.82 | $17.00 | $47.34 | $17.40 | $17.00 | $20.00 | $32.21 |
| 611E01100 6" CONDUIT, TYPE C | 12 FT | $30.00 | $23.64 | $27.00 | $39.33 | $29.50 | $12.50 | $15.00 | $83.04 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $12.00 | $57.38 | $10.00 | $18.73 | $28.00 | $13.00 | $20.00 | $29.35 |
| 611E04400 12" CONDUIT, TYPE B | 363 FT | $45.00 | $51.18 | $48.00 | $66.94 | $41.70 | $62.50 | $70.00 | $88.07 |
| 611E04600 12" CONDUIT, TYPE C | 133 FT | $45.00 | $72.66 | $42.00 | $69.00 | $67.00 | $56.50 | $50.00 | $87.45 |
| 611E04900 12" CONDUIT, TYPE D | 81 FT | $30.00 | $43.48 | $42.50 | $60.94 | $48.00 | $57.00 | $50.00 | $73.09 |
| 611E05900 15" CONDUIT, TYPE B | 40 FT | $57.00 | $70.29 | $59.00 | $86.01 | $44.80 | $62.00 | $80.00 | $149 |
| 611E06100 15" CONDUIT, TYPE C | 574 FT | $41.00 | $44.92 | $46.00 | $53.86 | $38.60 | $58.50 | $60.00 | $82.47 |
| 611E07400 18" CONDUIT, TYPE B | 95 FT | $55.00 | $59.19 | $63.00 | $130 | $57.60 | $72.00 | $90.00 | $119 |
| 611E07600 18" CONDUIT, TYPE C | 448 FT | $47.00 | $54.25 | $53.00 | $70.26 | $52.25 | $62.00 | $70.00 | $95.20 |
| 611E08900 21" CONDUIT, TYPE B | 62 FT | $77.00 | $85.98 | $78.00 | $133 | $88.00 | $93.50 | $110 | $143 |
| 611E16400 36" CONDUIT, TYPE B | 278 FT | $106 | $136 | $95.00 | $199 | $91.30 | $122 | $150 | $179 |
| 611E16600 36" CONDUIT, TYPE C | 44 FT | $84.00 | $149 | $82.00 | $188 | $295 | $94.50 | $130 | $190 |
| 611E97400 CONDUIT, MISC.: TYPE B FOR DRAINAGE DISCHARGE CONT | 100 FT | $18.00 | $30.75 | $9.00 | $65.56 | $30.00 | $34.50 | $10.00 | $45.28 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 100 FT | $18.00 | $30.75 | $9.00 | $65.56 | $30.00 | $30.00 | $8.00 | $40.28 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 100 FT | $18.00 | $30.75 | $9.00 | $59.25 | $30.00 | $27.00 | $12.00 | $48.03 |
| 611E98180 CATCH BASIN, NO. 3A | 11 EACH | $2,900 | $2,005 | $2,400 | $2,269 | $2,740 | $2,185 | $2,500 | $1,974 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $3,200 | $1,952 | $2,150 | $2,698 | $2,005 | $2,298 | $3,000 | $2,370 |
| 611E98470 CATCH BASIN, NO. 2-2B | 8 EACH | $1,750 | $1,438 | $1,100 | $1,310 | $1,485 | $1,677 | $1,800 | $1,123 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $950 | $970 | $850 | $442 | $447 | $1,060 | $1,000 | $1,145 |
| 611E99574 MANHOLE, NO. 3 | 8 EACH | $3,800 | $2,956 | $3,000 | $4,192 | $4,578 | $3,287 | $3,500 | $2,444 |
| 611E99586 MANHOLE, NO. 3 WITH 108" BASE I.D. AND 12" WEIR | 1 EACH | $14,500 | $13,868 | $21,000 | $19,736 | $19,750 | $20,899 | $20,000 | $20,044 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 2 EACH | $1,150 | $910 | $1,000 | $881 | $356 | $1,326 | $1,000 | $1,494 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 6 EACH | $150 | $367 | $300 | $237 | $310 | $251 | $300 | $329 |
| 611E99720 INSPECTION WELL | 5 EACH | $480 | $717 | $500 | $6,500 | $858 | $393 | $400 | $1,417 |
| 407E20000 NON-TRACKING TACK COAT | 762 GAL | $3.00 | $3.20 | $3.00 | $3.00 | $3.00 | $3.15 | $3.30 | $3.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 22 CY | $380 | $613 | $575 | $575 | $651 | $579 | $630 | $392 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 615 SY | $57.00 | $85.00 | $66.00 | $60.63 | $71.15 | $59.00 | $66.00 | $58.95 |
| 452E11010 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 493 SY | $64.00 | $73.83 | $67.00 | $66.70 | $79.00 | $66.00 | $71.00 | $64.95 |
| 609E26000 CURB, TYPE 6 | 513 FT | $23.00 | $27.58 | $31.00 | $28.67 | $29.50 | $33.00 | $27.00 | $25.40 |
| 609E31000 COMBINATION CURB AND GUTTER, TYPE 9 | 352 FT | $23.00 | $33.53 | $30.00 | $29.21 | $32.00 | $38.50 | $27.00 | $27.15 |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN | 243 FT | $29.00 | $33.53 | $36.00 | $42.40 | $38.90 | $44.00 | $33.00 | $40.79 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $18,450 | $16,614 | $7,500 | $6,300 | $21,444 | $17,000 | $10,000 | $4,740 |
| 638E04900 1" COPPER SERVICE BRANCH | 203 FT | $35.00 | $59.82 | $60.00 | $71.83 | $38.90 | $48.00 | $40.00 | $49.18 |
| 638E07800 6" GATE VALVE AND VALVE BOX | 4 EACH | $1,850 | $1,227 | $650 | $2,754 | $1,000 | $940 | $1,000 | $4,522 |
| 638E10201 6" FIRE HYDRANT, AS PER PLAN, TWO-WAY | 1 EACH | $5,000 | $4,288 | $4,200 | $4,949 | $2,980 | $5,283 | $5,000 | $3,572 |
| 638E11200 METER, SETTING, STOP AND CHAMBER | 5 EACH | $1,175 | $1,099 | $1,550 | $1,278 | $1,020 | $944 | $1,000 | $3,496 |
| 638E98000 WATER WORK, MISC.:CONNECT TO EX. WATER MAIN | 3 EACH | $2,125 | $2,933 | $3,800 | $5,145 | $845 | $3,548 | $6,000 | $7.32 |
| 638E98600 WATER WORK, MISC.:12" STEEL CASING | 50 FT | $81.00 | $52.42 | $65.00 | $119 | $56.00 | $141 | $100 | $130 |
| 638E98600 WATER WORK, MISC.:2" PVC CASING | 90 FT | $14.00 | $0.58 | $30.00 | $16.59 | $9.40 | $64.50 | $10.00 | $23.94 |
| 625E00450 CONNECTION, FUSED PULL APART | 26 EACH | $89.00 | $98.52 | $89.00 | $89.00 | $108 | $98.00 | $98.00 | $61.00 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 13 EACH | $78.00 | $98.52 | $78.00 | $78.00 | $108 | $98.00 | $86.00 | $64.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 45 EACH | $20.00 | $109 | $20.00 | $20.00 | $120 | $98.00 | $22.00 | $55.00 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT6B32.5 | 13 EACH | $2,120 | $2,160 | $2,120 | $2,120 | $2,360 | $2,163 | $2,340 | $1,568 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 13 EACH | $1,110 | $1,697 | $1,110 | $1,110 | $1,853 | $1,916 | $1,220 | $1,695 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 573 FT | $3.00 | $3.42 | $3.00 | $3.00 | $3.70 | $3.00 | $3.30 | $2.15 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,482 FT | $1.00 | $1.87 | $1.00 | $1.00 | $2.00 | $1.00 | $1.10 | $1.00 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 1,691 FT | $9.00 | $9.13 | $9.00 | $9.00 | $10.00 | $9.00 | $10.00 | $4.95 |
| 625E25900 CONDUIT, JACKED OR DRILLED, 3" | 191 FT | $33.00 | $47.81 | $33.00 | $33.00 | $52.20 | $22.50 | $37.00 | $38.00 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, SOLID STATE | 13 EACH | $390 | $414 | $390 | $390 | $452 | $309 | $430 | $495 |
| 625E29002 TRENCH, 24" DEEP | 1,653 FT | $8.50 | $12.86 | $8.50 | $8.50 | $14.00 | $9.50 | $9.40 | $8.75 |
| 625E30700 PULL BOX, 725.08, 18" | 8 EACH | $940 | $824 | $940 | $940 | $900 | $876 | $1,030 | $745 |
| 625E32000 GROUND ROD | 14 EACH | $251 | $239 | $251 | $251 | $260 | $273 | $276 | $249 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,925 | $5,638 | $1,925 | $1,925 | $6,156 | $824 | $2,100 | $2,280 |
| 625E34450 CONTROL CENTER CABINET, COMPLETE | 1 EACH | $3,100 | $3,437 | $3,100 | $3,100 | $3,750 | $6,180 | $3,400 | $3,580 |
| 625E36000 PLASTIC CAUTION TAPE | 1,653 FT | $0.05 | $0.16 | $0.05 | $0.05 | $0.20 | $0.21 | $0.06 | $0.10 |
| 632E70200 CONDUIT RISER, 1" DIAMETER | 1 EACH | $50.00 | $442 | $50.00 | $50.00 | $483 | $155 | $55.00 | $450 |
| 621E00100 RPM | 63 EACH | $63.20 | $65.54 | $63.20 | $63.20 | $71.60 | $65.00 | $70.00 | $63.20 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 28 EACH | $8.50 | $11.15 | $10.50 | $18.23 | $68.90 | $11.50 | $10.00 | $17.81 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 337 FT | $11.00 | $11.41 | $11.00 | $11.00 | $12.50 | $11.50 | $12.00 | $11.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 91 FT | $11.00 | $17.11 | $16.50 | $11.00 | $18.70 | $11.50 | $18.00 | $11.00 |
| 630E08600 SIGN POST REFLECTOR | 6 EACH | $50.00 | $50.82 | $49.00 | $50.00 | $55.50 | $51.50 | $55.00 | $50.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 1 EACH | $125 | $181 | $175 | $125 | $201 | $129 | $195 | $125 |
| 630E80100 SIGN, FLAT SHEET | 233 SF | $25.00 | $13.38 | $12.90 | $25.00 | $14.60 | $26.00 | $15.00 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 22 EACH | $20.00 | $20.74 | $20.00 | $20.00 | $22.90 | $20.50 | $22.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $65.00 | $41.48 | $45.00 | $65.00 | $45.30 | $67.00 | $50.00 | $65.00 |
| 630E85201 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY, AS PE | 4 EACH | $35.00 | $36.30 | $40.00 | $35.00 | $39.60 | $36.00 | $39.00 | $35.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 15 EACH | $20.00 | $36.30 | $35.00 | $20.00 | $39.60 | $20.50 | $39.00 | $20.00 |
| 632E90010 PEDESTAL, MISC.: REMOVAL & RE-ERECT PEDESTAL W/ SO | 4 EACH | $1,655 | $2,427 | $1,655 | $1,655 | $2,650 | $2,833 | $1,820 | $1,980 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $1,285 | $1,685 | $1,285 | $1,285 | $1,840 | $623 | $1,410 | $2,800 |
| 644E00104 EDGE LINE, 6" | 0.71 MILE | $6,655 | $6,902 | $6,655 | $6,655 | $7,536 | $6,855 | $7,300 | $6,550 |
| 644E00300 CENTER LINE, DOUBLE SOLID | 0.28 MILE | $7,370 | $7,643 | $7,370 | $7,370 | $4,347 | $7,591 | $8,100 | $7,370 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 110 FT | $5.10 | $5.29 | $5.10 | $5.10 | $5.80 | $5.50 | $6.00 | $5.10 |
| 644E01510 DOTTED LINE, 6" | 319 FT | $3.10 | $3.21 | $3.10 | $3.10 | $3.50 | $3.00 | $3.50 | $3.10 |
| 644E01520 DOTTED LINE, 12" | 139 FT | $3.60 | $3.73 | $3.60 | $3.60 | $4.10 | $3.50 | $4.00 | $3.60 |
| 644E20800 YIELD LINE | 61 FT | $10.65 | $11.04 | $10.65 | $10.65 | $12.00 | $11.00 | $13.00 | $10.65 |
| 661E00501 MULCH, AS PER PLAN SHREDDED BARK, 4" THICKNESS | 76 CY | $79.50 | $82.45 | $79.50 | $65.00 | $92.60 | $67.00 | $88.00 | $79.50 |
| 661E12100 GROUND COVER AND VINES, 1 YEAR, FLAT VINVA MINOR - | 2,988 EACH | $3.85 | $3.99 | $3.85 | $3.50 | $4.50 | $3.50 | $4.50 | $3.85 |
| 661E20070 DECIDUOUS SHRUB, 30" HEIGHT CORNUS ALBA 'CHBLZAM' | 30 EACH | $84.00 | $87.12 | $84.00 | $75.00 | $96.70 | $77.50 | $95.00 | $84.00 |
| 661E30040 EVERGREEN SHRUB, 18" HEIGHT THUJA OCCIDENTALIS 'AU | 76 EACH | $81.00 | $84.00 | $81.00 | $80.00 | $102 | $82.50 | $89.00 | $81.00 |
| 662E31000 LANDSCAPE WATERING | 424 GAL | $1.00 | $1.04 | $1.00 | $1.00 | $1.00 | $1.00 | $2.00 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $65.00 | $72.60 | $65.00 | $65.00 | $75.00 | $67.00 | $65.00 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 610 FT | $2.50 | $2.59 | $2.50 | $1.75 | $2.80 | $2.50 | $2.75 | $2.50 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 18 EACH | $1,900 | $1,970 | $1,900 | $1,900 | $2,300 | $1,957 | $2,100 | $2,347 |
| 614E12420 DETOUR SIGNING | 1 LS | $11,770 | $12,207 | $11,770 | $11,770 | $15,100 | $12,123 | $10,000 | $8,460 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 72 EACH | $11.00 | $11.41 | $11.00 | $11.00 | $12.50 | $11.50 | $12.00 | $10.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 72 EACH | $13.00 | $13.48 | $13.00 | $11.00 | $14.70 | $13.50 | $14.00 | $16.75 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.91 MILE | $1,470 | $1,525 | $1,470 | $1,470 | $1,665 | $1,514 | $1,620 | $1,470 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 2.68 MILE | $1,285 | $1,333 | $1,285 | $1,285 | $1,455 | $1,324 | $1,410 | $1,285 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I, 6" | 46 FT | $1.00 | $1.04 | $1.00 | $1.00 | $1.15 | $1.00 | $1.10 | $1.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I, 24" | 54 FT | $5.00 | $5.19 | $5.00 | $5.00 | $5.70 | $5.00 | $5.50 | $5.00 |
| 616E10000 WATER | 59 MGAL | $25.00 | $101 | $80.00 | $12.58 | $74.75 | $20.00 | $2.00 | $4.09 |
| 614E21001 WORK ZONE CENTER LINE, CLASS I, AS PER PLAN, SPRAY | 0.44 MILE | $3,415 | $3,542 | $3,415 | $3,415 | $3,700 | $3,518 | $3,700 | $3,415 |
| 614E22011 WORK ZONE EDGE LINE, CLASS I, 6", AS PER PLAN, SPR | 1.48 MILE | $3,130 | $3,246 | $3,130 | $3,130 | $3,500 | $3,224 | $3,400 | $3,130 |
| 614E24001 WORK ZONE DOTTED LINE, CLASS I, AS PER PLAN, 6", | 80 FT | $10.00 | $10.37 | $10.00 | $10.00 | $11.30 | $10.50 | $11.00 | $10.00 |
| 614E26001 WORK ZONE STOP LINE, CLASS I, AS PER PLAN, 24", SR | 27 FT | $25.00 | $25.93 | $25.00 | $25.00 | $28.30 | $26.00 | $28.00 | $25.00 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $8,000 | $11,632 | $15,000 | $11,148 | $12,890 | $21,445 | $12,000 | $15,022 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $12,000 | $17,831 | $11,500 | $10,012 | $10,925 | $6,626 | $5,000 | $9,852 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 6,929 LB | $0.75 | $1.87 | $0.75 | $1.48 | $0.80 | $2.50 | $2.00 | $2.35 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 18 EACH | $65.00 | $23.36 | $25.00 | $13.73 | $141 | $15.00 | $30.00 | $12.38 |
| 511E46011 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 68 CY | $443 | $1,128 | $430 | $695 | $559 | $1,053 | $1,000 | $876 |
| 511E46513 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, AS PER PLA | 77 CY | $505 | $711 | $650 | $615 | $884 | $662 | $500 | $965 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 75 SY | $32.00 | $29.87 | $20.00 | $51.93 | $64.20 | $18.00 | $25.00 | $32.00 |
| 512E33000 TYPE 2 WATERPROOFING | 195 SY | $23.50 | $19.20 | $24.00 | $24.17 | $43.70 | $28.00 | $20.00 | $23.50 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 60 SF | $4.75 | $4.90 | $3.00 | $4.34 | $4.40 | $7.50 | $5.00 | $4.50 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $1,700 | $2,206 | $6,200 | $7,384 | $4,124 | $5,195 | $6,000 | $23,550 |
| 601E11000 RIPRAP, TYPE D | 19 SY | $155 | $146 | $235 | $372 | $374 | $170 | $100 | $297 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 66 CY | $110 | $141 | $120 | $132 | $125 | $84.00 | $150 | $162 |
| 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER | 17 CY | $110 | $118 | $170 | $241 | $118 | $82.00 | $100 | $307 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 21 CY | $90.00 | $210 | $85.00 | $314 | $172 | $215 | $125 | $120 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,900 | $8,414 | $25,000 | $16,986 | $26,387 | $64,000 | $30,000 | $29,178 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $29,500 | $15,193 | $30,000 | $18,313 | $22,300 | $55,000 | $30,000 | $20,947 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 7,459 SY | $33.5 | $250k | 9% |
| 203E20000 EMBANKMENT | 16,115 CY | $15 | $242k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $230,000 | $230k | 8% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,271 CY | $102 | $130k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 659E00300 TOPSOIL | 2,182 CY | $43.5 | $95k | 3% |
| 609E72001 CONCRETE MEDIAN, AS PER PLAN | 1,255 SY | $74 | $93k | 3% |
| 304E20000 AGGREGATE BASE | 1,897 CY | $48 | $91k | 3% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $91,000 | $91k | 3% |
| 832E30000 EROSION CONTROL | 82,000 EACH | $1 | $82k | 3% |