614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST
480 HOUR
$40.00
$11.00
$75.00
$75.00
$80.00
11%
642E00104EDGE LINE, 6", TYPE 1
32.32 MILE
$553
$670
$670
$712
$670
10%
642E00204LANE LINE, 6", TYPE 1
30.88 MILE
$252
$325
$325
$547
$325
4%
624E10000MOBILIZATION
1 LS
$2,000
$10,615
$15,500
$760
$40,000
1%
614E11000MAINTAINING TRAFFIC
1 LS
Project details
Description
MRW-IR 71 Crackseal FY20
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$1,500
$20,500
$12,000
$34,700
$100,000
1%
832E30000EROSION CONTROL
1,000 EACH
$1.00
$1.00
$1.00
$1.00
$1.00
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$945
$750
$4,000
$1,800
$5,000
1%
614E18601PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN
2 SNMT
$350
$1,050
$1,100
$880
$1,050
0%
614E12421DETOUR SIGNING, AS PER PLAN
1 LS
$500
$3,200
$3,200
$3,300
$2,700
0%
614E20550WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT
0.78 MILE
$250
$2,380
$2,380
$725
$2,380
0%
614E12460WORK ZONE MARKING SIGN
10 EACH
$10.00
$250
$250
$138
$150
0%
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P
1 LS
$50.00
$200
$500
$18,000
$5,000
0%
$124k
71%
614E11110LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST
480 HOUR
$40
$19k
11%
642E00104EDGE LINE, 6", TYPE 1
32.32 MILE
$553
$18k
10%
642E00204LANE LINE, 6", TYPE 1
30.88 MILE
$252
$8k
4%
624E10000MOBILIZATION
1 LS
$2,000
$2k
1%
614E11000MAINTAINING TRAFFIC
1 LS
$1,500
$2k
1%
832E30000EROSION CONTROL
1,000 EACH
$1
$1k
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$945.48
$945
1%
614E18601PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN