GUE-Salt Fork Resurfacing FY20
GUE County · est $2.3M
Bid dateThursday, May 7—
GUE County · est $2.3M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Amaazz Construction Ohio LLC | R2Nls Paving, INC | R3Shelly & Sands INC | R4Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3,425 CY | $139 | $145 | $130 | $185 | 23% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 2,593 CY | $153 | $160 | $145 | $175 | 19% |
| 411E10001 STABILIZED CRUSHED AGGREGATE, AS PER PLAN | 6,103 CY | $61.40 | $64.00 | $75.00 | $60.00 | 18% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (2736 CY | $129 | $130 | $120 |
| Item | Quantity | R1Amaazz Construction Ohio LLC | R2Nls Paving, INC | R3Shelly & Sands INC | R4Barbicas Construction Company INC |
|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 4,503 SY | $2.10 | $5.00 | $8.50 | $4.00 |
| 202E32000 CURB REMOVED | 130 FT | $3.10 | $7.00 | $5.50 | $10.00 |
| 202E53020 SPECIAL - PARKING BLOCK REMOVED FOR STORAGE | 51 EACH | $13.50 | $25.00 | $38.50 | $10.00 |
| 203E10000 EXCAVATION | 260 CY | $11.25 | $15.00 | $30.00 | $50.00 |
| 203E20000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $175 |
| 17% |
| 253E02000 PAVEMENT REPAIR | 250 CY | $338 | $210 | $245 | $180 | 4% |
| 407E20000 NON-TRACKING TACK COAT | 18,762 GAL | $3.85 | $3.00 | $3.00 | $3.40 | 3% |
| 644E00104 EDGE LINE, 6" | 13.54 MILE | $3,000 | $2,993 | $3,000 | $3,275 | 2% |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN | 1,103 CY | $32.00 | $10.00 | $45.00 | $50.00 | 2% |
| 644E01200 PARKING LOT STALL MARKING | 19,518 FT | $1.75 | $1.70 | $1.75 | $1.55 | 2% |
| 644E00300 CENTER LINE | 7.08 MILE | $4,750 | $4,680 | $4,700 | $4,295 | 2% |
| 209E10001 DITCH CLEANOUT, AS PER PLAN | 7,600 FT | $3.75 | $3.00 | $0.80 | $3.00 | 1% |
| 644E50100 PAVEMENT MARKING, MISC.:PARKING STALL DESIGNATION | 108 EACH | $255 | $250 | $260 | $225 | 1% |
| 601E34300 ROCK CHANNEL PROTECTION, TYPE D WITHOUT FILTER | 365 CY | $72.00 | $75.00 | $65.00 | $125 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 16,565 SY | $1.55 | $1.50 | $2.25 | $2.00 | 1% |
| 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET | 798 EACH | $24.25 | $30.00 | $50.00 | $25.00 | 1% |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 17,055 SY | $1.00 | $0.80 | $0.75 | $1.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,710 | $45,000 | $78,000 | $24,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,781 | $10,499 | $8,200 | $24,000 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $13,530 | $40,000 | $30,821 | $24,000 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 14.16 MILE | $920 | $905 | $945 | $940 | 1% |
| 130 CY |
| $15.25 |
| $15.00 |
| $23.00 |
| $25.00 |
| 609E24510 CURB, TYPE 4-C | 130 FT | $52.00 | $40.00 | $22.50 | $40.00 |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 5 CY | $254 | $120 | $165 | $150 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $101 | $100 | $90.00 | $200 |
| 659E14000 REPAIR SEEDING AND MULCHING | 842 SY | $1.00 | $0.80 | $0.70 | $1.00 |
| 659E15000 INTER-SEEDING | 842 SY | $1.00 | $0.80 | $0.70 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 2.35 TON | $615 | $625 | $650 | $280 |
| 659E31000 LIME | 3.48 ACRE | $77.00 | $75.00 | $155 | $150 |
| 659E35000 WATER | 93 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 20 CY | $120 | $115 | $100 | $200 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 6 EACH | $315 | $785 | $1,250 | $6,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2.25" | 2,423 SY | $3.05 | $3.00 | $4.50 | $2.50 |
| 422E11000 AGGREGATE, SINGLE CHIP SEAL, TYPE A | 10,017 SY | $1.10 | $2.58 | $2.30 | $2.20 |
| 422E25000 EMULSION, CHIP SEAL | 3,707 GAL | $2.60 | $3.49 | $3.25 | $2.30 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 48 FT | $51.00 | $25.00 | $50.00 | $25.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 108 FT | $10.25 | $10.00 | $10.50 | $10.00 |
| 630E80100 SIGN, FLAT SHEET | 14 SF | $39.00 | $38.00 | $40.00 | $38.00 |
| 644E00400 CHANNELIZING LINE, 8" | 861 FT | $1.75 | $1.70 | $1.75 | $1.65 |
| 644E00500 STOP LINE | 378 FT | $5.95 | $5.80 | $5.90 | $6.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 2,108 FT | $5.10 | $5.00 | $5.25 | $6.00 |
| 644E01300 LANE ARROW | 18 EACH | $91.50 | $90.00 | $95.00 | $90.00 |
| 644E01410 WORD ON PAVEMENT, 96" | 2 EACH | $112 | $110 | $110 | $315 |
| 644E50100 PAVEMENT MARKING, MISC.: HELIPAD MARKING | 1 EACH | $2,800 | $2,742 | $2,800 | $1,000 |
| 647E20202 HANDICAP SYMBOL MARKING, TYPE A125 | 17 EACH | $160 | $155 | $160 | $250 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 4 CY | $185 | $322 | $200 | $200 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,662 FT | $0.75 | $1.00 | $0.80 | $1.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 75 FT | $10.15 | $10.00 | $10.00 | $10.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $6,000 | $4,850 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3,425 CY | $139.01 | $476k | 22% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 2,593 CY | $153 | $397k | 18% |
| 411E10001 STABILIZED CRUSHED AGGREGATE, AS PER PLAN | 6,103 CY | $61.4 | $375k | 17% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (2736 CY | $128.75 | $352k | 16% |
| 253E02000 PAVEMENT REPAIR | 250 CY | $338 | $85k | 4% |
| 407E20000 NON-TRACKING TACK COAT | 18,762 GAL | $3.85 | $72k | 3% |
| 644E00104 EDGE LINE, 6" | 13.54 MILE | $3,000 | $41k | 2% |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN | 1,103 CY | $32 | $35k | 2% |
| 644E01200 PARKING LOT STALL MARKING | 19,518 FT | $1.75 | $34k | 2% |
| 644E00300 CENTER LINE | 7.08 MILE | $4,750 | $34k | 2% |