CUY-IR 480N-00.00 Barrier
CUY County · est $1.1M
Bid dateThursday, June 4—
CUY County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 49 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Great Lakes Construction CO | R3Ruhlin Company | R4Kenmore Construction CO INC | R5Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|---|
| 622E10101 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1, AS PER PL | 1,861 FT | $138 | $151 | $163 | $138 | $128 | 25% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $168,610 | $75,000 | $220,150 | $152,000 | $340,000 | 16% |
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 2,648 FT | $32.50 | $38.00 | $36.00 | $28.00 | $26.00 | 8% |
| 622E25006 |
| Item | Quantity | R1Kokosing Construction Company INC | R2Great Lakes Construction CO | R3Ruhlin Company | R4Kenmore Construction CO INC | R5Karvo Companies INC |
|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 100 FT | $2.40 | $2.40 | $2.40 | $3.00 | $2.40 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 1.5 STA | $510 | $80.00 | $80.00 | $800 | $80.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 50 FT | $38.20 | $38.20 | $38.20 | $40.00 | $38.20 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 26 EACH |
| $2,825 |
| $3,500 |
| $3,300 |
| $4,700 |
| $2,650 |
| 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 8,680 FT | $7.00 | $11.00 | $10.25 | $26.00 | $20.00 | 6% |
| 630E84010 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 5 EACH | $10,000 | $11,000 | $9,775 | $11,700 | $6,450 | 5% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 99 CY | $445 | $350 | $350 | $360 | $380 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $40,000 | $120,000 | 4% |
| 630E74500 OVERHEAD SIGN SUPPORT, MISC.: END FRAME, TYPE TC-7 | 4 EACH | $9,620 | $8,385 | $9,620 | $9,600 | $9,620 | 4% |
| 622E10200 BARRIER TRANSITION | 8 EACH | $3,825 | $5,000 | $4,000 | $4,500 | $5,000 | 3% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 4 EACH | $6,315 | $8,020 | $5,325 | $5,300 | $5,325 | 2% |
| 630E89401 REMOVAL OF OVERHEAD SIGN SUPPORT AND REERECTION, T | 4 EACH | $6,250 | $5,250 | $6,250 | $6,250 | $6,250 | 2% |
| 611E99101 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B1, AS | 5 EACH | $4,600 | $6,500 | $4,100 | $4,650 | $3,200 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $76.00 | $70.00 | $65.00 | $70.00 | $65.00 | 2% |
| 611E99500 INLET, MISC.: INLET, NO. 3B50 | 3 EACH | $6,160 | $7,700 | $4,500 | $5,000 | $3,200 | 2% |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 34 EACH | $525 | $690 | $525 | $525 | $525 | 2% |
| 625E15201 LIGHT TOWER FOUNDATION, 36" X 25' DEEP, AS PER PLA | 1 EACH | $16,600 | $18,000 | $17,300 | $22,000 | $15,000 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 2,366 SY | $6.00 | $10.00 | $10.00 | $10.00 | $8.25 | 1% |
| 304E20000 AGGREGATE BASE | 119 CY | $114 | $130 | $68.00 | $75.00 | $80.00 | 1% |
| 646E10010 EDGE LINE, 6" | 4.43 MILE | $2,795 | $2,795 | $3,075 | $3,075 | $4,900 | 1% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 50 FT | $47.60 | $47.60 | $47.60 | $50.00 | $47.60 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (MASH 2016) | 1 EACH | $2,920 | $2,920 | $2,920 | $3,000 | $2,920 |
| 622E90000 BARRIER, MISC.: CONCRETE BARRIER, TYPE B50 | 11 FT | $190 | $230 | $800 | $300 | $300 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99155 INLET RECONSTRUCTED TO GRADE, AS PER PLAN | 2 EACH | $3,050 | $2,750 | $8,500 | $3,000 | $2,400 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $2.00 | $1.10 | $1.64 | $2.50 | $1.50 |
| 407E20000 NON-TRACKING TACK COAT | 237 GAL | $3.00 | $3.00 | $3.00 | $5.00 | $2.25 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (6.25 CY | $1,700 | $1,028 | $1,028 | $1,350 | $520 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 1.62 MILE | $3,791 | $3,250 | $3,250 | $3,250 | $3,250 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 4 EACH | $122 | $122 | $122 | $122 | $150 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 42 FT | $4.00 | $4.00 | $4.00 | $4.00 | $15.00 |
| 625E25604 CONDUIT, 4", 725.051 | 11 FT | $26.00 | $26.00 | $26.00 | $26.00 | $20.00 |
| 625E29931 MEDIAN JUNCTION BOX, AS PER PLAN | 1 EACH | $2,200 | $2,200 | $2,200 | $2,200 | $2,150 |
| 625E35021 RE-ERECT EXISTING LIGHT TOWER, AS PER PLAN | 1 EACH | $4,750 | $4,750 | $4,750 | $5,250 | $9,600 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 1 EACH | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 |
| 621E00301 RPM REFLECTOR, AS PER PLAN | 543 EACH | $17.90 | $17.90 | $28.04 | $20.00 | $18.50 |
| 625E32000 GROUND ROD | 9 EACH | $285 | $262 | $262 | $262 | $500 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE WAY | 54 EACH | $7.50 | $7.50 | $7.50 | $10.00 | $7.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 3 EACH | $10.00 | $10.00 | $10.00 | $12.00 | $10.00 |
| 630E79610 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED | 4 EACH | $365 | $335 | $365 | $365 | $365 |
| 630E80100 SIGN, FLAT SHEET | 60 SF | $17.50 | $12.00 | $17.50 | $17.50 | $17.50 |
| 630E84901 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, AS PE | 8 EACH | $15.00 | $44.00 | $15.00 | $15.00 | $15.00 |
| 630E87101 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION, A | 10 EACH | $625 | $835 | $625 | $625 | $625 |
| 630E89101 REMOVAL OF OVERHEAD SIGN SUPPORT AND REERECTION, T | 1 EACH | $4,050 | $4,000 | $4,050 | $4,050 | $4,050 |
| 646E10110 LANE LINE, 6" | 5.25 MILE | $1,850 | $1,850 | $2,035 | $2,035 | $3,200 |
| 646E10310 CHANNELIZING LINE, 12" | 5,666 FT | $2.00 | $2.00 | $3.00 | $3.00 | $2.35 |
| 646E10620 CHEVRON MARKING | 187 FT | $8.50 | $8.50 | $10.50 | $10.50 | $13.00 |
| 646E20350 LANE REDUCTION ARROW | 2 EACH | $500 | $500 | $600 | $600 | $400 |
| 646E20410 WORD ON PAVEMENT, 96" | 2 EACH | $250 | $250 | $300 | $300 | $400 |
| 646E20504 DOTTED LINE, 6" | 3,427 FT | $1.85 | $1.85 | $2.00 | $2.00 | $1.65 |
| 646E20510 DOTTED LINE, 12" | 1,017 FT | $1.90 | $1.90 | $2.20 | $2.20 | $1.65 |
| 614E12346 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), 24" | 2 EACH | $4,000 | $1,900 | $2,575 | $2,400 | $2,775 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 8 EACH | $460 | $80.00 | $125 | $125 | $200 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 1,283 EACH | $6.69 | $5.20 | $16.92 | $10.00 | $15.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 175 EACH | $5.10 | $6.25 | $11.00 | $11.00 | $15.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 175 EACH | $13.00 | $12.25 | $14.00 | $12.00 | $20.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $575 | $620 | $572 | $1,200 | $950 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 3.75 MILE | $430 | $430 | $525 | $600 | $550 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 4.43 MILE | $765 | $765 | $875 | $900 | $1,560 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 13,071 FT | $0.60 | $0.60 | $0.75 | $0.75 | $0.50 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 4,195 FT | $0.55 | $0.55 | $0.65 | $0.65 | $0.55 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $19.00 | $6.60 | $10.50 | $10.50 | $16.50 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 12 SNMT | $440 | $720 | $850 | $900 | $950 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,500 | $10,000 | $10,000 | $15,000 | $10,000 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 4 MNTH | $2,200 | $2,000 | $1,500 | $3,500 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $9,000 | $18,500 | $4,500 | $3,275 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 622E10101 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1, AS PER PL | 1,861 FT | $138 | $257k | 21% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $168,610 | $169k | 14% |
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 2,648 FT | $32.5 | $86k | 7% |
| 622E25006 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 26 EACH | $2,825 | $73k | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 8,680 FT | $7 | $61k | 5% |
| 630E84010 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 5 EACH | $10,000 | $50k | 4% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 99 CY | $445 | $44k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 630E74500 OVERHEAD SIGN SUPPORT, MISC.: END FRAME, TYPE TC-7 | 4 EACH | $9,620 | $38k | 3% |
| 622E10200 BARRIER TRANSITION | 8 EACH | $3,825 | $31k | 3% |