SUM-IR 76-06.40
SUM County · est $0.4M
Bid dateThursday, June 18—
SUM County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 40 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Kenmore Construction CO INC | R3Karvo Companies INC | R4Barbicas Construction Company INC | R5Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $25,000 | $39,400 | $35,000 | $65,000 | 20% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 493 CY | $94.00 | $145 | $137 | $125 | $145 | 17% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 338 CY | $63.00 | $60.00 | $62.00 | $50.00 | $85.00 | 8% |
| 614E12420 |
| Item | Quantity | R1Shelly & Sands INC | R2Kenmore Construction CO INC | R3Karvo Companies INC | R4Barbicas Construction Company INC | R5Chagrin Valley Paving INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $1,000 | $3,000 | $500 | $500 |
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 254 FT | $10.00 | $7.00 | $8.00 | $25.00 | $25.00 |
| 202E47801 IMPACT ATTENUATOR REMOVED, AS PER PLAN | 1 EACH | $300 | $800 | $345 | $1,500 | $1,980 |
| 203E20000 EMBANKMENT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $19,000 |
| $44,000 |
| $46,980 |
| $18,250 |
| $54,000 |
| 7% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 94 CY | $175 | $225 | $230 | $200 | $255 | 6% |
| 203E10000 EXCAVATION | 1,087 CY | $15.00 | $30.00 | $17.85 | $25.00 | $35.00 | 6% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (84 CY | $150 | $160 | $174 | $175 | $210 | 5% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 1,930 SY | $6.00 | $10.00 | $6.80 | $15.00 | $14.00 | 4% |
| 832E30000 EROSION CONTROL | 11,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $20,000 | $35,000 | $10,000 | 4% |
| 648E01510 DOTTED LINE, 6" | 1,145 FT | $8.00 | $8.50 | $7.90 | $7.95 | $7.95 | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 733 FT | $10.00 | $15.00 | $10.50 | $15.00 | $18.00 | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,000 | $900 | $950 | $1,050 | $950 | 2% |
| 646E10110 LANE LINE, 6" | 0.81 MILE | $7,400 | $9,000 | $20,385 | $7,020 | $7,020 | 2% |
| 204E10000 SUBGRADE COMPACTION | 2,026 SY | $2.50 | $2.00 | $0.70 | $0.50 | $1.50 | 2% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $4,800 | $5,000 | $4,600 | $4,000 | $4,500 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 70 HOUR | $65.00 | $70.00 | $65.00 | $65.00 | $125 | 2% |
| 621E00100 RPM | 14 EACH | $280 | $260 | $176 | $295 | $215 | 1% |
| 659E10000 SEEDING AND MULCHING | 2,573 SY | $1.50 | $1.00 | $0.73 | $0.75 | $4.00 | 1% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 67 CY | $55.00 | $60.00 | $54.00 | $75.00 | $100 | 1% |
| 87 CY |
| $7.00 |
| $10.00 |
| $15.00 |
| $25.00 |
| $25.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 67 CY | $15.00 | $20.00 | $23.50 | $50.00 | $35.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $200 | $110 | $165 | $100 | $250 |
| 204E50000 GEOTEXTILE FABRIC | 100 SY | $2.50 | $4.00 | $1.30 | $3.00 | $5.00 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 2 SY | $250 | $450 | $132 | $250 | $375 |
| 659E00300 TOPSOIL | 57 CY | $62.00 | $40.00 | $56.00 | $50.00 | $90.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.35 TON | $640 | $500 | $800 | $800 | $1,000 |
| 659E31000 LIME | 0.53 ACRE | $75.00 | $100 | $1.00 | $10.00 | $95.00 |
| 659E35000 WATER | 14 MGAL | $1.00 | $10.00 | $1.00 | $10.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION | 533 SY | $1.00 | $3.00 | $2.75 | $2.50 | $5.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,300 | $1,000 | $1,450 | $1,000 | $1,265 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,400 | $800 | $1,500 | $2,500 | $1,400 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 12 FT | $38.00 | $25.00 | $20.00 | $25.00 | $100 |
| 611E00900 6" CONDUIT, TYPE B | 10 FT | $45.00 | $25.00 | $29.00 | $15.00 | $100 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $400 | $200 | $400 | $250 | $1,000 |
| 407E20000 NON-TRACKING TACK COAT | 213 GAL | $2.80 | $4.00 | $2.55 | $3.00 | $3.00 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 178 FT | $13.00 | $13.00 | $15.00 | $30.00 | $32.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 44.4 LB | $0.60 | $5.00 | $9.00 | $10.00 | $24.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 14 EACH | $8.00 | $5.00 | $3.00 | $1.00 | $5.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 21 FT | $44.00 | $13.00 | $13.10 | $42.50 | $45.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $44.00 | $113 | $113 | $42.00 | $55.00 |
| 630E80100 SIGN, FLAT SHEET | 15 SF | $28.00 | $24.00 | $23.65 | $27.35 | $50.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $26.00 | $95.00 | $94.75 | $25.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $95.00 | $94.75 | $15.00 | $15.00 |
| 646E10010 EDGE LINE, 6" | 0.12 MILE | $8,200 | $9,500 | $21,375 | $7,770 | $7,770 |
| 646E10310 CHANNELIZING LINE, 12" | 818 FT | $3.00 | $4.00 | $4.40 | $3.00 | $3.00 |
| 646E20504 DOTTED LINE, 6" | 920 FT | $2.50 | $3.50 | $3.50 | $2.50 | $2.50 |
| 614E11630 INCREASED BARRIER DELINEATION | 47 FT | $2.60 | $2.50 | $2.50 | $2.50 | $5.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 1 EACH | $2,200 | $4,000 | $2,750 | $2,920 | $2,920 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 12 EACH | $10.00 | $15.00 | $20.00 | $10.00 | $15.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 12 EACH | $15.00 | $15.00 | $25.00 | $13.00 | $15.00 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 1.28 MILE | $2,100 | $2,030 | $2,030 | $2,045 | $2,045 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 1,980 FT | $0.80 | $1.00 | $1.00 | $0.80 | $0.80 |
| 616E10000 WATER | 5 MGAL | $80.00 | $10.00 | $5.00 | $10.00 | $80.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 520 FT | $5.00 | $20.00 | $25.50 | $40.00 | $31.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $4,000 | $4,000 | $4,000 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $2,000 | $4,760 | $5,000 | $4,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $55k | 17% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 493 CY | $94 | $46k | 15% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 338 CY | $63 | $21k | 7% |
| 614E12420 DETOUR SIGNING | 1 LS | $19,000 | $19k | 6% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 94 CY | $175 | $16k | 5% |
| 203E10000 EXCAVATION | 1,087 CY | $15 | $16k | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (84 CY | $150 | $13k | 4% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 1,930 SY | $6 | $12k | 4% |
| 832E30000 EROSION CONTROL | 11,000 EACH | $1 | $11k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |