SUM-SR 18-04.91/07.98
SUM County · est $2.2M
Bid dateThursday, July 2—
SUM County · est $2.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 31 more items below.
| Item | Quantity | R1Kenmore Construction CO INC | R2Karvo Companies INC | R3Shelly & Sands INC | R4Shelly Company | R5Barbicas Construction Company INC | R6Northstar Asphalt INC | R7Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (5475 CY | $128 | $120 | $111 | $107 | $145 | $123 | $170 | 39% |
| 424E10001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE A, AS P | 2,359 CY | $185 | $176 | $206 | $190 | $200 | $198 | $180 | 24% |
| 611E99655 |
| Item | Quantity | R1Kenmore Construction CO INC | R2Karvo Companies INC | R3Shelly & Sands INC | R4Shelly Company | R5Barbicas Construction Company INC | R6Northstar Asphalt INC | R7Chagrin Valley Paving INC |
|---|---|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 4,311 SF | $1.00 | $4.00 | $2.50 | $3.00 | $3.00 | $2.00 | $3.00 |
| 202E32000 CURB REMOVED | 399 FT | $3.00 | $6.00 | $13.50 | $12.15 | $5.00 | $5.00 | $12.15 |
| 608E10000 4" CONCRETE WALK | 1,112 SF |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 200 EACH |
| $850 |
| $1,050 |
| $1,350 |
| $1,325 |
| $900 |
| $1,150 |
| $1,325 |
| 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(T=1 1/2" at cen | 60,407 SY | $1.30 | $1.30 | $1.00 | $1.65 | $2.25 | $2.50 | $2.40 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=2 1/2") | 52,206 SY | $1.45 | $1.75 | $1.00 | $1.65 | $2.50 | $2.60 | $2.50 | 4% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 90 EACH | $550 | $550 | $600 | $560 | $450 | $550 | $560 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 14,640 GAL | $3.00 | $2.20 | $3.00 | $2.50 | $3.00 | $3.40 | $3.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $57,000 | $89,100 | $120,350 | $50,000 | $225,000 | $107,000 | 2% |
| 608E52000 CURB RAMP | 3,015 SF | $13.00 | $14.50 | $18.00 | $11.00 | $10.00 | $14.50 | $11.00 | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 45 EACH | $750 | $950 | $950 | $1,000 | $600 | $450 | $675 | 2% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,000 SY | $25.00 | $42.00 | $56.00 | $44.00 | $26.00 | $55.00 | $40.00 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $60,000 | $50,000 | $100,000 | $25,000 | $60,000 | $40,000 | 1% |
| 644E00300 CENTER LINE | 3.55 MILE | $5,200 | $4,300 | $4,030 | $4,300 | $4,300 | $4,300 | $4,300 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 20 EACH | $850 | $1,100 | $1,100 | $1,100 | $1,150 | $1,100 | $1,100 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $65.00 | $65.00 | $67.00 | $65.00 | $65.00 | $65.00 | $105 | 1% |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 24 EACH | $500 | $900 | $1,000 | $625 | $450 | $900 | $625 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $1,000 | $2,000 | $2,000 | $2,000 | $700 | $1,150 | $1,250 | 1% |
| 644E01300 LANE ARROW | 104 EACH | $105 | $70.00 | $75.00 | $70.00 | $70.00 | $70.00 | $70.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $12,000 | $3,965 | $8,500 | $25,000 | $10,000 | $20,000 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $800 | $900 | $900 | $900 | $900 | $450 | $900 | 1% |
| $6.50 |
| $7.00 |
| $9.00 |
| $5.10 |
| $5.00 |
| $7.00 |
| $5.10 |
| 608E53020 DETECTABLE WARNING | 184 SF | $50.00 | $21.00 | $175 | $56.70 | $25.00 | $25.00 | $57.00 |
| 609E26000 CURB, TYPE 6 | 88 FT | $30.00 | $35.00 | $64.00 | $27.75 | $30.00 | $35.00 | $30.00 |
| 625E31600 PULL BOX, MISC.: ADJUSTED TO GRADE | 13 EACH | $350 | $300 | $600 | $500 | $233 | $550 | $625 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 6 EACH | $700 | $750 | $1,000 | $1,325 | $600 | $950 | $725 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,200 LB | $1.50 | $4.00 | $1.50 | $4.00 | $1.49 | $4.00 | $2.00 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 1 EACH | $1,000 | $1,775 | $2,000 | $4,500 | $2,500 | $1,670 | $2,500 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $750 | $450 | $600 | $560 | $322 | $550 | $575 |
| 644E00204 LANE LINE, 6" | 7.03 MILE | $1,200 | $1,500 | $1,405 | $1,500 | $1,500 | $1,500 | $1,500 |
| 644E00400 CHANNELIZING LINE, 8" | 3,775 FT | $1.50 | $1.50 | $1.15 | $1.50 | $1.50 | $1.50 | $1.50 |
| 644E00500 STOP LINE | 1,168 FT | $6.25 | $5.25 | $4.65 | $5.25 | $5.25 | $5.30 | $5.25 |
| 644E00600 CROSSWALK LINE | 2,500 FT | $3.15 | $2.70 | $2.65 | $2.70 | $2.70 | $2.70 | $2.70 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 505 FT | $5.75 | $5.25 | $4.50 | $5.25 | $5.25 | $5.30 | $5.25 |
| 644E00900 ISLAND MARKING | 81.5 SF | $3.00 | $2.00 | $2.50 | $2.00 | $2.00 | $2.00 | $2.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 4 EACH | $600 | $500 | $550 | $500 | $500 | $500 | $500 |
| 644E01200 PARKING LOT STALL MARKING | 265 FT | $2.00 | $1.50 | $2.40 | $1.50 | $1.50 | $1.50 | $1.50 |
| 614E12460 WORK ZONE MARKING SIGN | 40 EACH | $125 | $50.00 | $95.00 | $50.00 | $58.42 | $50.00 | $50.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $100 | $100 | $270 | $115 | $225 | $150 | $250 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 7.03 MILE | $500 | $600 | $835 | $600 | $600 | $600 | $600 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 7.03 MILE | $500 | $500 | $240 | $500 | $500 | $500 | $500 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 3.55 MILE | $900 | $875 | $1,355 | $875 | $875 | $880 | $875 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.55 MILE | $900 | $700 | $520 | $700 | $700 | $880 | $700 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 3,775 FT | $0.85 | $0.50 | $0.55 | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 3,775 FT | $0.85 | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 1,168 FT | $3.00 | $2.35 | $2.50 | $2.35 | $2.35 | $2.40 | $2.35 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 1,168 FT | $3.00 | $2.35 | $2.40 | $3.35 | $2.35 | $2.40 | $2.35 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $2,000 | $5,000 | $4,000 | $8,000 | $10,000 | $2,500 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $1,200 | $2,500 | $5,000 | $1,000 | $3,500 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (5475 CY | $128 | $701k | 36% |
| 424E10001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE A, AS P | 2,359 CY | $185 | $436k | 23% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 200 EACH | $850 | $170k | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(T=1 1/2" at cen | 60,407 SY | $1.3 | $79k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=2 1/2") | 52,206 SY | $1.45 | $76k | 4% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 90 EACH | $550 | $50k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 14,640 GAL | $3 | $44k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $40k | 2% |
| 608E52000 CURB RAMP | 3,015 SF | $13 | $39k | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 45 EACH | $750 | $34k | 2% |