LAK-SR 2-13.40
LAK County · est $0.8M
Bid dateThursday, October 1—
LAK County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 15 more items below.
| Item | Quantity | R1Chagrin Valley Paving INC | R2Karvo Companies INC | R3Ronyak Paving INC | R4Shelly Company | % of bid |
|---|---|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,002 CY | $150 | $176 | $160 | $195 | 44% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $76,000 | $80,000 | $125,000 | 11% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 47,868 SY | $1.40 | $0.90 | $1.50 | $1.75 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $64,500 | $68,000 | $69,325 | $20,000 | 9% |
| Item | Quantity | R1Chagrin Valley Paving INC | R2Karvo Companies INC | R3Ronyak Paving INC | R4Shelly Company |
|---|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 110 EACH | $1.00 | $2.50 | $4.00 | $4.00 |
| 646E10110 LANE LINE, 6" | 1.9 MILE | $1,400 | $2,145 | $2,150 | $1,750 |
| 646E10310 CHANNELIZING LINE, 12" | 785 FT | $2.50 | $2.15 | $2.20 | $2.15 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 958 SY | $35.00 | $69.00 | $100 | $70.00 | 5% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 1,114 SY | $30.00 | $40.00 | $60.00 | $50.00 | 5% |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 3.8 MILE | $3,500 | $1,630 | $1,650 | $2,000 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 96 CY | $125 | $90.00 | $95.00 | $100 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $100 | $65.00 | $60.00 | $65.00 | 2% |
| 646E10010 EDGE LINE, 6" | 3.8 MILE | $2,450 | $3,455 | $2,450 | $3,000 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 4,070 GAL | $2.00 | $2.25 | $2.00 | $3.00 | 1% |
| 621E00100 RPM | 146 EACH | $52.50 | $62.50 | $69.00 | $37.75 | 1% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 34 CY | $200 | $185 | $450 | $300 | 1% |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $20.00 | $20.00 | $20.00 | $20.00 | 1% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 1,142 CY | $5.00 | $9.75 | $6.00 | $10.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,500 | $8,000 | $6,500 | $5,000 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 9 SNMT | $600 | $900 | $600 | $900 | 1% |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 25 CY | $200 | $205 | $150 | $151 | 1% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $750 | $2,000 | $1,750 | $2,000 | 1% |
| 209E60201 LINEAR GRADING, AS PER PLAN | 156 STA | $25.00 | $38.00 | $50.00 | $25.00 | 1% |
| 156 FT |
| $8.00 |
| $12.00 |
| $8.00 |
| $12.00 |
| 646E20504 DOTTED LINE, 6" | 1,156 FT | $1.00 | $1.65 | $2.00 | $1.65 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 1.9 MILE | $550 | $800 | $550 | $800 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.9 MILE | $550 | $800 | $550 | $800 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 3.8 MILE | $700 | $800 | $700 | $800 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 3.8 MILE | $700 | $800 | $700 | $800 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 785 FT | $1.15 | $0.75 | $1.00 | $0.75 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 785 FT | $1.15 | $0.75 | $1.00 | $0.75 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 1,156 FT | $0.70 | $1.00 | $1.00 | $1.00 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 1,156 FT | $0.70 | $1.00 | $1.00 | $1.00 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $1,000 | $2,100 | $2,793 | $4,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,002 CY | $150 | $300k | 43% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $75k | 11% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 47,868 SY | $1.4 | $67k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $64,500 | $65k | 9% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 958 SY | $35 | $34k | 5% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 1,114 SY | $30 | $33k | 5% |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 3.8 MILE | $3,500 | $13k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 96 CY | $125 | $12k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $100 | $12k | 2% |
| 646E10010 EDGE LINE, 6" | 3.8 MILE | $2,450 | $9k | 1% |