HIG-SR 28-09.25
HIG County · est $0.5M
Bid dateThursday, November 5—
HIG County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Shelly Company | R2Fillmore Construction | R3Allard Excavation LLC | R4D G M INC | R5Eclipse CO LLC | R6Alan Stone CO INC | R7Sunesis Construction CO | R8Distel Construction INC | R9Axis Civil Construction LLC | R10John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 4,682 CY | $14.50 | $20.00 | $14.38 | $15.00 | $12.28 | $24.00 | $17.50 | $20.00 | $19.00 | $17.50 | 17% |
| 611E26000 72" CONDUIT, TYPE A (SEE SHEET 21 FOR ALLOWABLE MA |
| Item | Quantity | R1Shelly Company | R2Fillmore Construction | R3Allard Excavation LLC | R4D G M INC | R5Eclipse CO LLC | R6Alan Stone CO INC | R7Sunesis Construction CO | R8Distel Construction INC | R9Axis Civil Construction LLC | R10John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $2,000 | $1,500 | $505 | $250 | $270 | $2,200 | $600 | $6,750 | $1,500 | $504 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 112 FT |
| $515 |
| $500 |
| $774 |
| $1,075 |
| $595 |
| $475 |
| $940 |
| $689 |
| $1,350 |
| $977 |
| 14% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN (EXISTING 60"x96" B | 1 LS | $35,000 | $5,500 | $4,015 | $16,500 | $9,820 | $13,000 | $22,800 | $29,750 | $15,000 | $19,461 | 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 163 CY | $161 | $170 | $161 | $166 | $226 | $200 | $161 | $247 | $210 | $215 | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $24,000 | $57,500 | $17,500 | $3,000 | $10,429 | $1,000 | $21,700 | $4,800 | $15,000 | $3,669 | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $22,500 | $2,300 | $8,452 | $15,000 | $12,352 | $15,000 | $14,643 | $13,865 | $10,000 | $21,790 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 104 CY | $185 | $200 | $185 | $192 | $289 | $220 | $185 | $316 | $260 | $275 | 5% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,025 FT | $18.75 | $18.75 | $18.75 | $17.00 | $16.36 | $25.00 | $19.00 | $18.40 | $15.58 | $18.75 | 5% |
| 203E10000 EXCAVATION | 1,415 CY | $12.50 | $10.00 | $3.68 | $10.00 | $8.40 | $10.00 | $11.00 | $8.00 | $8.50 | $15.00 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 100 CY | $170 | $240 | $170 | $140 | $210 | $200 | $170 | $230 | $100 | $200 | 4% |
| 832E30000 EROSION CONTROL | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $300 | $300 | $300 | $250 | $420 | $350 | $300 | $460 | $40.00 | $400 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $1,000 | $65,000 | $12,500 | $54,989 | $20,000 | $58,200 | $18,000 | $28,000 | $20,000 | 4% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT (30") | 247 FT | $40.50 | $48.00 | $43.00 | $40.00 | $34.74 | $20.00 | $32.00 | $47.00 | $28.00 | $58.14 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350/MASH2016) | 4 EACH | $2,320 | $2,320 | $2,320 | $2,200 | $2,205 | $3,300 | $2,320 | $2,500 | $2,100 | $2,320 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $5,500 | $12,250 | $16,000 | $7,125 | $4,500 | $4,350 | $5,005 | $4,000 | $3,290 | 2% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (46 CY | $175 | $220 | $175 | $182 | $257 | $200 | $175 | $282 | $260 | $245 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $2,500 | $9,260 | $4,500 | $7,276 | $6,600 | $5,050 | $7,780 | $8,500 | $8,587 | 2% |
| 202E23000 PAVEMENT REMOVED | 700 SY | $10.50 | $5.00 | $4.10 | $8.00 | $23.40 | $6.00 | $19.00 | $10.00 | $12.00 | $19.15 | 2% |
| 304E20000 AGGREGATE BASE | 134 CY | $54.50 | $80.00 | $53.60 | $60.00 | $49.39 | $93.00 | $71.00 | $50.00 | $85.00 | $82.94 | 2% |
| 1,090 FT |
| $3.50 |
| $3.50 |
| $2.75 |
| $1.00 |
| $4.15 |
| $3.50 |
| $4.00 |
| $5.00 |
| $3.00 |
| $3.50 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 6 EACH | $275 | $300 | $126 | $250 | $953 | $336 | $300 | $550 | $400 | $275 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $550 | $200 | $126 | $250 | $1,570 | $215 | $425 | $500 | $1,200 | $687 |
| 202E75000 FENCE REMOVED | 1,197 FT | $2.00 | $2.00 | $0.65 | $3.00 | $3.78 | $1.00 | $7.00 | $4.00 | $1.50 | $7.30 |
| 202E98100 REMOVAL MISC.:CONC. WEIR REMOVED | 7 EACH | $265 | $300 | $126 | $250 | $447 | $400 | $990 | $750 | $1,000 | $515 |
| 204E10000 SUBGRADE COMPACTION | 606 SY | $1.50 | $3.00 | $3.00 | $4.00 | $2.95 | $4.50 | $2.00 | $3.00 | $2.00 | $4.06 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 21 CY | $145 | $100 | $80.00 | $100 | $85.12 | $116 | $127 | $120 | $110 | $141 |
| 659E00300 TOPSOIL | 81 CY | $80.00 | $20.00 | $18.00 | $20.00 | $54.66 | $67.50 | $40.00 | $30.00 | $35.00 | $83.92 |
| 659E10000 SEEDING AND MULCHING | 6,328 SY | $0.74 | $1.00 | $0.85 | $1.00 | $0.89 | $1.50 | $1.50 | $2.00 | $1.00 | $0.85 |
| 659E14000 REPAIR SEEDING AND MULCHING | 316 SY | $0.68 | $1.00 | $0.05 | $0.05 | $0.53 | $7.00 | $0.50 | $4.00 | $1.00 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.85 TON | $672 | $610 | $500 | $650 | $525 | $732 | $500 | $720 | $610 | $500 |
| 659E31000 LIME | 1.31 ACRE | $153 | $80.00 | $200 | $80.00 | $210 | $937 | $200 | $100 | $80.00 | $200 |
| 659E35000 WATER | 34 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.05 | $14.00 | $1.00 | $2.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 726 SY | $1.55 | $2.00 | $1.95 | $2.00 | $2.05 | $3.50 | $2.00 | $2.50 | $2.00 | $1.95 |
| 670E00700 DITCH EROSION PROTECTION | 371 SY | $1.38 | $2.25 | $1.95 | $2.50 | $2.05 | $4.50 | $2.00 | $3.00 | $2.25 | $1.95 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,350 | $1,500 | $1,350 | $1,500 | $1,680 | $4,000 | $1,350 | $1,600 | $1,500 | $1,350 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $720 | $16,400 | $3,211 | $3,500 | $4,725 | $11,000 | $1,170 | $2,000 | $16,400 | $1,140 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,009 | $6,500 | $10,000 | $6,500 | $5,985 | $13,000 | $1,000 | $6,420 | $6,500 | $8,788 |
| 602E20000 CONCRETE MASONRY | 4.8 CY | $1,350 | $1,000 | $1,704 | $1,000 | $883 | $3,500 | $2,300 | $1,255 | $2,000 | $1,484 |
| 605E31100 AGGREGATE DRAINS | 400 FT | $9.00 | $20.00 | $10.14 | $15.00 | $17.24 | $7.00 | $9.00 | $15.00 | $8.00 | $16.50 |
| 407E10000 TACK COAT | 374 GAL | $1.85 | $3.00 | $1.85 | $1.85 | $5.25 | $2.00 | $2.00 | $6.00 | $3.00 | $5.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 35 CY | $95.00 | $100 | $67.00 | $90.00 | $59.99 | $110 | $65.00 | $55.00 | $112 | $159 |
| 621E00100 RPM | 8 EACH | $259 | $412 | $412 | $270 | $272 | $400 | $412 | $490 | $412 | $438 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $12.50 | $20.00 | $8.75 | $1.00 | $21.42 | $38.50 | $6.50 | $25.00 | $19.00 | $24.93 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 12 EACH | $15.00 | $15.00 | $15.00 | $10.00 | $8.93 | $13.00 | $16.00 | $10.00 | $8.50 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.2 MILE | $4,556 | $5,965 | $5,965 | $5,000 | $1,355 | $8,500 | $6,000 | $7,039 | $1,290 | $4,820 |
| 642E00300 CENTER LINE, TYPE 1 | 0.1 MILE | $9,118 | $11,475 | $11,475 | $6,000 | $2,048 | $16,000 | $11,500 | $13,541 | $1,950 | $5,005 |
| 407E10000 TACK COAT | 200 GAL | $1.85 | $5.00 | $1.85 | $1.85 | $5.25 | $0.10 | $2.00 | $6.00 | $3.00 | $5.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $65.00 | $100 | $75.00 | $50.00 | $68.25 | $86.50 | $65.00 | $90.00 | $75.00 | $75.00 |
| 616E10000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $49.81 | $0.10 | $10.00 | $5.00 | $1.00 | $243 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $2,500 | $6,857 | $15,000 | $7,268 | $3,500 | $3,950 | $10,015 | $5,000 | $3,155 |
| 619E16000 FIELD OFFICE, TYPE A | 1 MNTH | $2,000 | $1,000 | $1,200 | $1,500 | $600 | $63.50 | $3,500 | $5,500 | $1,800 | $2,350 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 4,682 CY | $14.5 | $68k | 14% |
| 611E26000 72" CONDUIT, TYPE A (SEE SHEET 21 FOR ALLOWABLE MA | 112 FT | $515 | $58k | 12% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN (EXISTING 60"x96" B | 1 LS | $35,000 | $35k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 163 CY | $161 | $26k | 6% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $24,000 | $24k | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $22,500 | $23k | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 104 CY | $185 | $19k | 4% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,025 FT | $18.75 | $19k | 4% |
| 203E10000 EXCAVATION | 1,415 CY | $12.5 | $18k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 100 CY | $170 | $17k | 4% |