MED-SR 3-03.80
MED County · est $2.4M
Bid dateThursday, November 19—
MED County · est $2.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 53 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Kokosing Construction Company INC | R3Chagrin Valley Paving INC | R4Shelly Company | R5Shelly & Sands INC | R6Ronyak Paving INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 5,502 CY | $119 | $123 | $120 | $115 | $128 | $135 | 33% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3,935 CY | $140 | $145 | $135 | $150 | $159 | $155 | 28% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 945 CY | $168 | $110 | $150 |
| Item | Quantity | R1Karvo Companies INC | R2Kokosing Construction Company INC | R3Chagrin Valley Paving INC | R4Shelly Company | R5Shelly & Sands INC | R6Ronyak Paving INC |
|---|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 1,420 SF | $2.75 | $2.00 | $4.20 | $4.20 | $4.00 | $2.50 |
| 202E32000 CURB REMOVED | 178 FT | $8.25 | $6.75 | $11.31 | $11.30 | $12.00 | $9.50 |
| 202E38000 GUARDRAIL REMOVED | 87.5 FT | $2.00 | $2.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $165 |
| $230 |
| $280 |
| 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $120,000 | $166,400 | $175,000 | $121,250 | $99,545 | $170,000 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $82,000 | $100,000 | $104,300 | $100,000 | $40,000 | $67,475 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 83,964 SY | $0.78 | $0.60 | $1.00 | $1.00 | $1.25 | $1.00 | 3% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 255 CY | $215 | $140 | $190 | $200 | $540 | $615 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3") | 25,031 SY | $1.60 | $1.15 | $1.90 | $1.25 | $2.25 | $2.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 14,724 GAL | $2.00 | $2.00 | $3.00 | $2.50 | $3.00 | $3.25 | 2% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 158 CY | $140 | $145 | $135 | $150 | $128 | $155 | 1% |
| 519E11100 PATCHING CONCRETE STRUCTURE | 200 SF | $110 | $110 | $85.00 | $110 | $110 | $110 | 1% |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 22,915 FT | $0.90 | $1.35 | $0.50 | $1.25 | $1.00 | $0.75 | 1% |
| 617E10100 COMPACTED AGGREGATE | 814 CY | $25.00 | $50.00 | $45.00 | $55.00 | $60.00 | $55.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $10,000 | $15,000 | $5,000 | $5,863 | $17,500 | 1% |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,801 SY | $10.00 | $10.00 | $7.00 | $10.00 | $10.00 | $9.00 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (TAPER 1.5" TO | 3,208 SY | $5.50 | $3.50 | $2.50 | $2.81 | $2.25 | $10.00 | 1% |
| 253E02000 PAVEMENT REPAIR (LONGITUDINAL) | 97 CY | $175 | $120 | $150 | $175 | $290 | $250 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 17.31 MILE | $885 | $700 | $700 | $885 | $1,000 | $700 | 1% |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,441 SY | $10.00 | $10.00 | $7.00 | $10.00 | $10.00 | $9.00 | 1% |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK, TYPE B | 23 SY | $600 | $600 | $450 | $600 | $600 | $600 | 1% |
| $2.00 |
| $2.00 |
| $2.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 5 EACH | $145 | $115 | $115 | $115 | $115 | $115 |
| 203E20001 EMBANKMENT, AS PER PLAN | 14 CY | $94.50 | $92.50 | $92.50 | $92.50 | $92.50 | $92.50 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 3.38 STA | $150 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 11.33 MILE | $600 | $1,800 | $100 | $1,500 | $1,500 | $1,000 |
| 209E80000 GRADING MAILBOX APPROACHES | 16 EACH | $65.00 | $75.00 | $25.00 | $200 | $400 | $300 |
| 606E13000 GUARDRAIL, TYPE 5 | 87.5 FT | $23.60 | $22.80 | $22.80 | $22.80 | $22.80 | $22.80 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 5 EACH | $2,140 | $2,050 | $2,050 | $2,050 | $2,050 | $2,050 |
| 608E10000 4" CONCRETE WALK | 164 SF | $5.25 | $10.00 | $10.00 | $6.95 | $8.00 | $8.00 |
| 608E52000 CURB RAMP | 1,256 SF | $8.25 | $10.00 | $15.00 | $11.70 | $10.00 | $12.50 |
| 609E26000 CURB, TYPE 6 | 178 FT | $20.00 | $18.25 | $40.00 | $25.00 | $18.00 | $24.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 2 EACH | $235 | $165 | $165 | $165 | $165 | $165 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 11 EACH | $925 | $725 | $1,250 | $815 | $1,000 | $700 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $875 | $725 | $1,000 | $840 | $800 | $675 |
| 253E02000 PAVEMENT REPAIR (TRANSVERSE) | 28 CY | $180 | $150 | $190 | $250 | $730 | $630 |
| 254E01600 PATCHING PLANED SURFACE | 562 SY | $0.75 | $2.00 | $10.00 | $1.00 | $6.00 | $1.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 5,750 GAL | $2.20 | $2.75 | $3.00 | $3.50 | $3.00 | $4.00 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 4.34 MILE | $1,400 | $1,400 | $3,000 | $1,400 | $1,400 | $1,500 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $500 | $525 | $750 | $600 | $30.00 | $550 |
| 621E00100 RPM | 464 EACH | $27.00 | $27.00 | $27.00 | $28.50 | $27.00 | $27.00 |
| 621E00300 RPM REFLECTOR | 30 EACH | $10.00 | $10.00 | $10.00 | $13.70 | $10.00 | $10.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 447 EACH | $1.00 | $2.50 | $1.00 | $4.00 | $5.00 | $5.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 9 EACH | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 11.54 MILE | $615 | $575 | $575 | $575 | $766 | $575 |
| 642E00300 CENTER LINE, TYPE 1 | 5.77 MILE | $900 | $800 | $800 | $800 | $773 | $800 |
| 644E00400 CHANNELIZING LINE, 8" | 2,839 FT | $1.00 | $0.95 | $0.95 | $0.95 | $1.80 | $1.00 |
| 644E00500 STOP LINE | 586 FT | $6.00 | $5.85 | $5.85 | $5.85 | $6.25 | $6.00 |
| 644E00600 CROSSWALK LINE | 322 FT | $3.00 | $3.00 | $3.00 | $3.00 | $5.00 | $3.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 1,725 FT | $5.00 | $5.50 | $5.50 | $5.50 | $5.90 | $5.50 |
| 644E00900 ISLAND MARKING | 256 SF | $5.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 644E01300 LANE ARROW | 41 EACH | $85.00 | $95.00 | $95.00 | $95.00 | $80.00 | $95.00 |
| 646E10010 EDGE LINE, 6" | 0.26 MILE | $24,300 | $6,900 | $6,900 | $6,900 | $24,300 | $6,900 |
| 646E10200 CENTER LINE | 0.13 MILE | $24,800 | $8,900 | $8,900 | $8,900 | $24,800 | $8,900 |
| 646E10300 CHANNELIZING LINE, 8" | 172 FT | $2.25 | $1.90 | $1.90 | $1.90 | $2.25 | $2.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 435 FT | $9.00 | $7.50 | $7.50 | $7.50 | $9.00 | $7.50 |
| 646E20300 LANE ARROW | 3 EACH | $188 | $175 | $175 | $175 | $188 | $175 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $80.00 | $100 | $65.00 | $67.00 | $65.00 |
| 614E12460 WORK ZONE MARKING SIGN | 87 EACH | $85.00 | $85.00 | $85.00 | $85.00 | $125 | $55.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $200 | $125 | $150 | $115 | $140 | $250 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 8,517 FT | $0.50 | $0.75 | $0.75 | $0.50 | $0.50 | $1.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 1,758 FT | $2.75 | $3.00 | $3.00 | $2.75 | $3.00 | $3.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 123 EACH | $30.00 | $45.00 | $45.00 | $30.00 | $45.00 | $45.00 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING | 1,393 FT | $3.00 | $3.00 | $2.00 | $3.00 | $3.00 | $4.00 |
| 512E74520 REMOVAL OF EXISTING PAVEMENT MARKING | 3 EACH | $150 | $150 | $200 | $150 | $150 | $150 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK, TYPE B | 18 SY | $600 | $600 | $450 | $600 | $600 | $600 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 125 FT | $34.80 | $29.40 | $29.40 | $29.40 | $29.40 | $29.40 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 132 SY | $50.00 | $50.00 | $18.00 | $50.00 | $50.00 | $19.00 |
| 512E74520 REMOVAL OF EXISTING PAVEMENT MARKING | 1,297 EACH | $3.00 | $3.00 | $2.00 | $3.00 | $3.00 | $4.00 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $2,000 | $2,000 | $1,500 | $2,000 | $2,000 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $2,500 | $250 | $5,000 | $2,500 | $6,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 5,502 CY | $119 | $655k | 30% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3,935 CY | $140 | $551k | 25% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 945 CY | $168 | $159k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $120,000 | $120k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $82,000 | $82k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 83,964 SY | $0.78 | $65k | 3% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 255 CY | $215 | $55k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3") | 25,031 SY | $1.6 | $40k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 14,724 GAL | $2 | $29k | 1% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 158 CY | $140 | $22k | 1% |