HAM-LMST Beechmont Bridge (PART 1 AND PART 2)
HAM County · est $6.6M
Bid dateThursday, December 17—
HAM County · est $6.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 262 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Prus Construction Company | R3Complete General Construction Company | R4Great Lakes Construction CO | R5John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|
| 513E10300 STRUCTURAL STEEL MEMBERS, LEVEL 5 | 291,444 LB | $2.85 | $2.60 | $2.42 | $2.65 | $2.52 | 17% |
| 638E98100 WATER WORK, MISC.:BRIDGE WATERLINE | 1 LS | $550,000 | $700,000 | $805,000 | $750,000 | $575,000 | 11% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 363 CY | $1,190 | $1,250 | $500 | $1,200 | $1,300 | 9% |
| Item | Quantity | R1Kokosing Construction Company INC | R2Prus Construction Company | R3Complete General Construction Company | R4Great Lakes Construction CO | R5John R Jurgensen Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $50,000 | $100,000 | $90,000 | $51,000 | $75,340 |
| 202E32000 CURB REMOVED | 236 FT | $6.00 | $8.25 | $6.00 | $2.00 | $6.01 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 78 FT | $17.00 | $9.00 | $30.00 | $10.00 | $23.06 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 509E10000 EPOXY COATED REINFORCING STEEL | 184,916 LB | $1.75 | $1.40 | $1.30 | $1.50 | $1.45 | 7% |
| 203E20000 EMBANKMENT | 22,862 CY | $13.00 | $19.00 | $15.00 | $16.00 | $26.02 | 6% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 53,992 LB | $4.00 | $2.75 | $3.04 | $3.20 | $3.22 | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $205,931 | $345,000 | $985,000 | $400,000 | $250,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200,000 | $200,000 | $200,000 | $200,000 | 4% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 19,258 SF | $10.00 | $9.50 | $9.00 | $10.00 | $10.00 | 4% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 1,825 CY | $100 | $72.00 | $100 | $90.00 | $154 | 4% |
| 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 519 FT | $350 | $125 | $273 | $275 | $235 | 4% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $165,000 | $75,000 | $175,000 | $400,000 | $250,000 | 3% |
| 517E76300 RAILING, MISC.:AESTHETIC BIKE RAILING | 534 FT | $305 | $418 | $290 | $290 | $235 | 3% |
| 601E35100 ROCK CHANNEL PROTECTION, MISC.: TEMPORARY ACCESS F | 1 LS | $150,000 | $485,000 | $375,000 | $375,000 | $325,000 | 3% |
| 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 162 CY | $885 | $700 | $970 | $925 | $925 | 3% |
| 611E97400 CONDUIT, MISC.:16'X11' CONDUIT, TYPE A, 706.05, 7' | 70 FT | $2,035 | $1,725 | $1,400 | $1,600 | $2,846 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $140,000 | $100,000 | $60,000 | $75,000 | $542,265 | 3% |
| 638E98600 WATER WORK, MISC.: FURNISHING AND LAYING 12" DUCTI | 278 FT | $475 | $330 | $310 | $400 | $493 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $120,000 | $20,000 | $1,000 | $40,000 | $25,000 | 2% |
| 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 24,530 SF | $4.80 | $8.75 | $8.00 | $4.80 | $4.80 | 2% |
| 532 FT |
| $1.50 |
| $6.50 |
| $6.00 |
| $6.00 |
| $2.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $560 | $550 | $480 | $350 | $581 |
| 202E98100 REMOVAL MISC.:EXISTING POSTS | 5 EACH | $120 | $45.00 | $125 | $70.00 | $370 |
| 203E10000 EXCAVATION | 4,380 CY | $12.00 | $26.50 | $11.00 | $12.00 | $14.25 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 5 EACH | $510 | $1,500 | $1,500 | $1,600 | $2,676 |
| 204E45000 PROOF ROLLING | 4 HOUR | $150 | $475 | $110 | $300 | $264 |
| 206E10500 CEMENT | 76 TON | $175 | $190 | $180 | $175 | $287 |
| 206E11000 CURING COAT | 2,916 SY | $0.90 | $1.00 | $1.25 | $1.37 | $1.58 |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 2,916 SY | $12.00 | $10.00 | $5.80 | $12.95 | $20.59 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $6,500 | $7,000 | $8,550 | $6,500 | $4,000 |
| 606E13000 GUARDRAIL, TYPE 5 | 250 FT | $18.00 | $19.50 | $18.00 | $18.00 | $16.20 |
| 606E15050 GUARDRAIL, TYPE MGS | 100 FT | $18.75 | $20.00 | $18.75 | $18.75 | $17.20 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $775 | $950 | $900 | $900 | $980 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $1,950 | $2,250 | $2,050 | $2,050 | $2,120 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $400 | $140 | $130 | $130 | $625 |
| 607E98000 FENCE, MISC.: WOOD FENCE | 1,007 FT | $42.00 | $45.00 | $42.00 | $42.00 | $39.00 |
| 622E90000 BARRIER, MISC.: MOMENT SLAB BARRIER | 163 FT | $475 | $800 | $555 | $460 | $455 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $37,000 | $16,500 | $40,000 | $35,000 | $8,500 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $40,000 | $25,000 | $60,000 | $45,000 | $40,000 |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 746 SY | $30.00 | $12.00 | $19.00 | $12.00 | $12.00 |
| 607E35000 FENCE REMOVED AND REBUILT | 20 FT | $48.00 | $50.00 | $48.00 | $48.00 | $87.60 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 326 SY | $26.00 | $46.00 | $54.00 | $30.00 | $15.94 |
| 601E21000 CONCRETE SLOPE PROTECTION | 706 SY | $61.00 | $80.00 | $90.00 | $90.00 | $145 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 17 CY | $287 | $150 | $105 | $130 | $531 |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 608 CY | $8.00 | $63.00 | $35.00 | $45.00 | $66.28 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $125 | $115 | $50.00 | $100 |
| 659E00300 TOPSOIL | 997 CY | $8.00 | $68.00 | $35.00 | $36.00 | $4.35 |
| 659E00550 SEEDING AND MULCHING, CLASS 4A | 8,979 SY | $0.92 | $1.30 | $1.25 | $0.75 | $1.60 |
| 659E14000 REPAIR SEEDING AND MULCHING | 449 SY | $1.00 | $1.30 | $1.25 | $0.40 | $0.40 |
| 659E15000 INTER-SEEDING | 449 SY | $1.00 | $1.10 | $1.00 | $0.40 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 1.21 TON | $500 | $850 | $800 | $1,000 | $450 |
| 659E31000 LIME | 1.86 ACRE | $200 | $80.00 | $75.00 | $200 | $100 |
| 659E35000 WATER | 50 MGAL | $1.00 | $1.10 | $1.00 | $25.00 | $1.00 |
| 659E40000 MOWING | 20 MSF | $1.00 | $16.25 | $15.00 | $0.10 | $25.00 |
| 670E00500 SLOPE EROSION PROTECTION | 5,467 SY | $1.95 | $2.25 | $2.15 | $2.00 | $2.50 |
| 671E15000 EROSION CONTROL MAT, TYPE A | 146 SY | $5.00 | $2.25 | $2.15 | $2.50 | $4.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,285 | $5,500 | $1,300 | $3,000 | $1,800 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $12,921 | $5,500 | $18,000 | $13,250 | $11,700 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $18,500 | $5,500 | $15,000 | $15,950 | $14,437 |
| 832E30000 EROSION CONTROL | 35,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.42 CY | $5,825 | $2,700 | $1,686 | $3,000 | $7,172 |
| 611E04600 12" CONDUIT, TYPE C | 83 FT | $128 | $100 | $70.00 | $110 | $88.86 |
| 611E04601 12" CONDUIT, TYPE C, AS PER PLAN | 103 FT | $85.00 | $125 | $105 | $90.00 | $122 |
| 611E04900 12" CONDUIT, TYPE D | 74 FT | $87.00 | $90.00 | $75.00 | $60.00 | $80.69 |
| 611E05900 15" CONDUIT, TYPE B | 24 FT | $190 | $150 | $98.00 | $85.00 | $460 |
| 611E06700 15" CONDUIT, TYPE F, 707.51 OR 707.21 | 54 FT | $175 | $65.00 | $115 | $110 | $119 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $4,815 | $4,300 | $3,000 | $3,600 | $4,266 |
| 611E98470 CATCH BASIN, NO. 2-2B | 4 EACH | $2,435 | $2,650 | $1,500 | $1,600 | $1,826 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 320 FT | $5.00 | $3.50 | $3.00 | $1.22 | $2.50 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 98 CY | $230 | $250 | $230 | $230 | $376 |
| 304E20000 AGGREGATE BASE | 661 CY | $89.00 | $65.00 | $80.00 | $85.00 | $104 |
| 407E20000 NON-TRACKING TACK COAT | 517 GAL | $5.00 | $5.50 | $5.00 | $5.00 | $4.50 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 521 CY | $200 | $215 | $200 | $200 | $339 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (155 CY | $225 | $245 | $225 | $225 | $427 |
| 451E10010 6" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 28 SY | $165 | $130 | $180 | $225 | $170 |
| 609E24510 CURB, TYPE 4-C | 18 FT | $61.00 | $85.00 | $56.00 | $65.00 | $68.62 |
| 609E26000 CURB, TYPE 6 | 236 FT | $42.00 | $32.00 | $42.00 | $35.00 | $43.38 |
| 253E01000 PAVEMENT REPAIR | 35 SY | $266 | $150 | $200 | $300 | $158 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 14 EACH | $14.00 | $13.00 | $12.00 | $14.00 | $12.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $55.50 | $52.00 | $50.00 | $50.00 | $50.00 |
| 630E80100 SIGN, FLAT SHEET | 44.25 SF | $19.00 | $27.00 | $25.00 | $25.00 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $20.00 | $16.00 | $15.00 | $15.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $25.00 | $70.00 | $65.00 | $65.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $30.00 | $21.00 | $20.00 | $20.00 | $20.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $35.00 | $100 | $95.00 | $95.00 | $95.00 |
| 630E97700 SIGNING, MISC.:WOOD POST | 2 EACH | $140 | $190 | $175 | $175 | $175 |
| 630E97900 SIGNING, MISC.:WOOD POST | 140 FT | $75.00 | $19.50 | $18.00 | $18.00 | $18.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.33 MILE | $4,510 | $4,700 | $4,510 | $4,510 | $4,510 |
| 642E00301 CENTER LINE, TYPE 1, AS PER PLAN | 0.44 MILE | $4,610 | $4,900 | $4,610 | $4,610 | $4,610 |
| 642E00500 STOP LINE, TYPE 1 | 28 FT | $2.50 | $2.75 | $2.50 | $2.50 | $2.50 |
| 642E50010 PAVEMENT MARKING, MISC.:WORD ON PAVEMENT, 48", TYP | 1 EACH | $100 | $105 | $100 | $100 | $100 |
| 644E00100 EDGE LINE, 4" | 0.44 MILE | $4,255 | $4,650 | $4,255 | $4,255 | $4,255 |
| 644E00200 LANE LINE, 4" | 0.42 MILE | $2,980 | $3,250 | $2,980 | $1,980 | $2,980 |
| 644E00300 CENTER LINE | 0.28 MILE | $5,820 | $6,350 | $5,820 | $5,820 | $5,820 |
| 644E01500 DOTTED LINE, 4" | 413 FT | $1.50 | $1.65 | $1.50 | $1.50 | $1.50 |
| 646E10000 EDGE LINE, 4" | 0.21 MILE | $8,980 | $9,800 | $8,980 | $8,980 | $8,980 |
| 646E10100 LANE LINE, 4" | 0.21 MILE | $8,345 | $9,200 | $8,345 | $8,345 | $8,345 |
| 646E10200 CENTER LINE | 0.11 MILE | $9,820 | $10,500 | $9,820 | $9,820 | $9,820 |
| 646E20502 DOTTED LINE, 4" | 551 FT | $3.50 | $3.75 | $3.50 | $3.50 | $3.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1.25" | 11,667 SY | $1.15 | $1.25 | $1.15 | $1.15 | $3.33 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 72 HOUR | $85.00 | $100 | $85.00 | $71.09 | $131 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $6,500 | $2,075 | $2,800 | $1,900 | $1,900 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,138 | $4,850 | $4,450 | $4,450 | $2,740 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 21 EACH | $9.00 | $9.50 | $9.00 | $9.00 | $9.00 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 101 EACH | $80.00 | $54.00 | $50.00 | $82.77 | $49.90 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 35 EACH | $11.00 | $11.50 | $11.00 | $11.00 | $11.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 35 EACH | $15.00 | $16.00 | $15.00 | $15.00 | $15.00 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 0.53 MILE | $1,505 | $1,650 | $1,505 | $1,505 | $1,505 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.44 MILE | $2,065 | $2,250 | $2,065 | $2,065 | $2,065 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.38 MILE | $1,730 | $1,875 | $1,730 | $1,730 | $1,730 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 1,000 FT | $0.55 | $0.60 | $0.55 | $0.55 | $0.55 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 38 FT | $2.50 | $2.75 | $2.50 | $2.50 | $2.50 |
| 616E10000 WATER | 100 MGAL | $70.00 | $10.00 | $42.00 | $50.00 | $20.24 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 720 FT | $8.00 | $20.00 | $19.00 | $19.00 | $19.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 32 EACH | $100 | $88.00 | $130 | $75.00 | $120 |
| 625E10614 LIGHT POLE ANCHOR BOLTS ON STRUCTURE | 1 EACH | $250 | $600 | $900 | $862 | $590 |
| 625E14101 LIGHT POLE FOUNDATION, 24" X 8' DEEP, AS PER PLAN | 1 EACH | $3,300 | $3,000 | $3,650 | $2,500 | $2,500 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 2,397 FT | $3.50 | $3.00 | $3.00 | $2.50 | $4.50 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 266 FT | $2.00 | $2.40 | $1.75 | $2.00 | $2.10 |
| 625E25300 CONDUIT, 1-1/2", 725.04 | 48 FT | $24.00 | $20.00 | $40.00 | $18.00 | $8.50 |
| 625E25400 CONDUIT, 2", 725.04 | 1,578 FT | $28.00 | $20.00 | $17.00 | $18.00 | $10.60 |
| 625E27502 LUMINAIRE, UNDERPASS, SOLID STATE (LED), 70W LED, | 2 EACH | $950 | $1,250 | $780 | $1,100 | $1,065 |
| 625E27505 LUMINAIRE, TUNNEL, SOLID STATE (LED), AS PER PLAN, | 6 EACH | $2,900 | $1,750 | $2,500 | $1,500 | $3,515 |
| 625E29000 TRENCH | 788 FT | $13.00 | $12.00 | $6.00 | $10.00 | $13.05 |
| 625E29600 TRENCH IN PAVED AREA, TYPE B | 273 FT | $29.00 | $90.00 | $20.00 | $60.00 | $115 |
| 625E29900 JUNCTION BOX | 2 EACH | $600 | $3,000 | $425 | $2,500 | $825 |
| 625E29920 STRUCTURE JUNCTION BOX | 3 EACH | $2,200 | $3,000 | $2,250 | $2,500 | $2,500 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $1,000 | $1,100 | $1,000 | $950 | $960 |
| 625E31506 PULL BOX REMOVED AND REPLACED | 1 EACH | $1,250 | $2,200 | $1,400 | $1,900 | $1,250 |
| 625E32000 GROUND ROD | 10 EACH | $275 | $250 | $225 | $205 | $320 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 2 EACH | $5,200 | $3,000 | $5,500 | $2,500 | $3,500 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $9,800 | $6,000 | $7,500 | $5,000 | $6,525 |
| 625E35011 REMOVE AND REERECT EXISTING LIGHT POLE, AS PER PLA | 2 EACH | $1,550 | $1,400 | $1,050 | $1,200 | $1,450 |
| 625E98100 LIGHTING, MISC.: NO. 4 AWG 5000 VOLT DISTRIBUTION | 550 FT | $3.50 | $8.00 | $2.75 | $7.00 | $4.25 |
| 625E98100 LIGHTING, MISC.:1 1/2" DUCT CABLE WITH TWO NO. 4 A | 173 FT | $7.50 | $29.00 | $18.00 | $25.00 | $14.25 |
| 625E98200 LIGHTING, MISC.:LIGHTING. | 1 LS | $9,100 | $10,000 | $6,200 | $9,000 | $8,750 |
| 625E98200 LIGHTING, MISC.:MAINTAIN EXISTING LIGHTING | 1 LS | $9,600 | $3,500 | $5,200 | $3,000 | $14,850 |
| 630E89814 REMOVAL OF WOOD POLE AND STORAGE | 1 EACH | $214 | $1,100 | $650 | $950 | $1,500 |
| 632E28200 DISCONNECT SWITCH WITH ENCLOSURE | 2 EACH | $1,500 | $1,200 | $1,600 | $1,000 | $2,150 |
| 632E30100 MESSENGER WIRE, 7 STRAND, 5/16" DIAMETER WITH ACCE | 30 FT | $35.00 | $35.00 | $30.00 | $30.00 | $14.25 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 30 FT | $35.00 | $35.00 | $30.00 | $30.00 | $13.80 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $500 | $750 | $875 | $650 | $1,495 |
| 632E89300 WOOD POLE, CLASS 3-40 FT | 2 EACH | $2,800 | $2,400 | $1,900 | $2,000 | $1,210 |
| 632E89400 DOWN GUY | 1 EACH | $500 | $730 | $500 | $650 | $850 |
| 451E10020 6" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P WITH | 125 SY | $120 | $103 | $110 | $150 | $251 |
| 503E21100 UNCLASSIFIED EXCAVATION | 4,172 CY | $5.00 | $9.00 | $22.00 | $20.00 | $14.16 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 19,805 LB | $1.34 | $1.10 | $1.25 | $1.20 | $1.31 |
| 511E52100 CLASS QC FS CONCRETE | 175 CY | $400 | $550 | $400 | $500 | $526 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 747 SY | $20.00 | $18.00 | $20.00 | $22.50 | $20.00 |
| 512E33000 TYPE 2 WATERPROOFING | 381 SY | $16.00 | $95.00 | $22.50 | $22.00 | $22.50 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 73 SF | $6.00 | $5.80 | $11.23 | $13.00 | $8.51 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 50 CY | $122 | $132 | $70.00 | $95.00 | $990 |
| 511E71300 CONCRETE, MISC.:, CLASS QC FS CONCRETE (WINGWALLS | 168 SY | $625 | $590 | $600 | $500 | $1,002 |
| 888E10000 HIGH FRICTION SURFACE TREATMENT, SINGLE LIFT | 133 SY | $164 | $175 | $164 | $100 | $164 |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 222 SY | $8.00 | $23.50 | $24.00 | $20.00 | $30.44 |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $17,865 | $10,000 | $22,000 | $100,000 | $8,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,289 LB | $1.15 | $1.10 | $1.30 | $1.21 | $1.00 |
| 511E53014 CLASS QC3 CONCRETE, MISC.:QC3 CONCRETE WITH QC/QA, | 54 CY | $1,725 | $1,800 | $2,600 | $1,850 | $2,100 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 164 SY | $20.00 | $25.00 | $20.00 | $23.00 | $20.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 8 SF | $14.25 | $16.50 | $20.00 | $13.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 189 FT | $25.00 | $43.00 | $11.00 | $40.00 | $25.00 |
| 518E62600 STRUCTURE DRAINAGE, MISC.:PREFABRICATED GEOCOMPOSI | 866 SF | $6.50 | $5.50 | $7.00 | $3.00 | $3.00 |
| 520E10001 PNEUMATICALLY PLACED CONCRETE SHOTCRETE, AS PER PL | 1,648 SF | $28.00 | $38.00 | $53.00 | $53.89 | $54.00 |
| 601E21000 CONCRETE SLOPE PROTECTION | 38 SY | $140 | $90.00 | $225 | $140 | $110 |
| 601E37500 PAVED GUTTER, TYPE 1-2 | 99 FT | $51.00 | $50.00 | $95.00 | $70.00 | $60.00 |
| 610E50000 RETAINING WALL, MISC.: SOIL NAIL PROOF TEST | 6 EACH | $600 | $875 | $800 | $800 | $800 |
| 610E50000 RETAINING WALL, MISC.: SOIL NAIL VERIFICATION TEST | 2 EACH | $2,500 | $10,500 | $2,113 | $2,113 | $2,113 |
| 610E50010 RETAINING WALL, MISC.: SOIL NAIL RETAINING WALL | 1,819 SF | $45.00 | $80.00 | $105 | $71.00 | $71.00 |
| 203E10001 EXCAVATION, AS PER PLAN (ADDITIONAL EXCAVATION (CI | 5 CY | $139 | $38.00 | $35.00 | $45.00 | $45.45 |
| 509E25000 UNCOATED REINFORCING STEEL | 550 LB | $1.30 | $1.19 | $2.00 | $1.40 | $1.13 |
| 602E20000 CONCRETE MASONRY CONCRETE CLASS "C" (CIN. 1110) | 6 CY | $376 | $180 | $500 | $250 | $360 |
| 638E98000 WATER WORK, MISC.: FURNISHING AND INSTALLING FIRE | 1 EACH | $3,534 | $3,900 | $4,000 | $5,500 | $6,434 |
| 638E98000 WATER WORK, MISC.: FURNISHING AND INSTALLING FIRE | 1 EACH | $950 | $415 | $550 | $700 | $923 |
| 638E98000 WATER WORK, MISC.: FURNISHING AND INSTALLING VALVE | 3 EACH | $2,455 | $300 | $1,850 | $325 | $1,427 |
| 638E98000 WATER WORK, MISC.: FURNISHING AND INSTALLING VALVE | 2 EACH | $2,666 | $635 | $1,140 | $1,850 | $2,995 |
| 638E98000 WATER WORK, MISC.: FURNISHING AND INSTALLING VALVE | 2 EACH | $4,700 | $1,800 | $2,060 | $4,100 | $4,094 |
| 638E98000 WATER WORK, MISC.: REMOVING EXISTING VALVE BOXES ( | 1 EACH | $409 | $230 | $410 | $150 | $577 |
| 638E98000 WATER WORK, MISC.: REMOVING FIRE HYDRANT (CIN. 111 | 1 EACH | $1,280 | $735 | $755 | $600 | $970 |
| 638E98600 WATER WORK, MISC.: FURNISHING AND INSTALLING 24" S | 165 FT | $130 | $155 | $620 | $140 | $350 |
| 638E98600 WATER WORK, MISC.: FURNISHING AND LAYING 24" DUCTI | 36 FT | $330 | $600 | $710 | $650 | $430 |
| 638E98600 WATER WORK, MISC.: FURNISHING AND LAYING 6" DUCTIL | 12 FT | $229 | $250 | $265 | $200 | $632 |
| 638E98600 WATER WORK, MISC.: REMOVE EXISTING WATER MAIN | 75 FT | $17.00 | $38.00 | $15.00 | $70.00 | $67.01 |
| 690E98400 SPECIAL - MISC.: WORK INVOLVING ASBESTOS CONTAININ | 1 LS | $31,175 | $145,000 | $55,000 | $1,025 | $39,000 |
| 690E98400 SPECIAL -SANITARY SEWER, MSD SANITARY SEWER PROTEC | 1 LS | $3,300 | $6,000 | $6,000 | $30,000 | $8,762 |
| 690E98000 SPECIAL -SANITARY CONDUIT INSPECTION | 3 EACH | $1,500 | $1,100 | $1,600 | $3,000 | $1,316 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $72,500 | $15,000 | $50,000 | $200,000 | $60,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $30,000 | $26,000 | $35,000 | $30,000 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,710 FT | $35.00 | $30.00 | $45.00 | $31.00 | $42.00 |
| 507E00251 STEEL PILES HP12X53, DRIVEN, AS PER PLAN | 1,500 FT | $13.00 | $50.00 | $10.00 | $55.00 | $6.00 |
| 507E00410 STEEL PILES, MISC.:STEEL PILES DRIVEN THRU HOLES I | 8 EACH | $1,970 | $825 | $680 | $1,800 | $800 |
| 507E92201 PREBORED HOLES, AS PER PLAN | 32 FT | $500 | $485 | $1,350 | $820 | $600 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 200 LB | $1.75 | $1.10 | $2.25 | $2.00 | $1.50 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 172 EACH | $17.00 | $35.00 | $18.00 | $35.00 | $25.00 |
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 6 CY | $2,325 | $1,100 | $3,930 | $4,750 | $3,000 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 31 CY | $715 | $475 | $340 | $450 | $750 |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 178 CY | $535 | $550 | $380 | $425 | $500 |
| 511E50212 CLASS QC1 CONCRETE WITH QC/QA, SUBSTRUCTURE | 38 CY | $1,115 | $1,000 | $1,100 | $1,200 | $1,200 |
| 512E10051 SEALING OF CONCRETE SURFACES (NON-EPOXY), AS PER P | 288 SY | $10.00 | $30.00 | $10.00 | $12.50 | $10.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 122 SY | $16.00 | $38.00 | $13.50 | $25.00 | $13.50 |
| 512E33000 TYPE 2 WATERPROOFING | 7 SY | $45.00 | $70.00 | $50.00 | $48.81 | $70.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 316 EACH | $4.00 | $10.50 | $3.50 | $3.80 | $10.00 |
| 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P | 24,530 SF | $4.80 | $3.25 | $3.00 | $4.80 | $4.80 |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 44 FT | $620 | $750 | $590 | $600 | $725 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 45 SF | $5.00 | $15.00 | $11.00 | $11.50 | $5.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 42 SF | $7.00 | $16.00 | $12.00 | $12.50 | $6.00 |
| 516E46000 BEARING DEVICE, BOLSTER | 4 EACH | $5,835 | $4,000 | $5,000 | $3,500 | $4,750 |
| 516E46200 BEARING DEVICE, ROCKER | 8 EACH | $4,140 | $1,350 | $4,000 | $4,750 | $4,750 |
| 518E12301 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 13 EACH | $2,302 | $1,250 | $2,200 | $2,500 | $2,500 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 39 CY | $93.00 | $140 | $80.00 | $100 | $115 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 64 FT | $12.00 | $14.00 | $10.00 | $15.00 | $15.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 19 FT | $18.00 | $22.00 | $25.00 | $30.00 | $15.00 |
| 518E51101 8" PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN | 327 FT | $114 | $108 | $70.00 | $150 | $60.00 |
| 518E51201 PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN10" | 444 FT | $110 | $130 | $75.00 | $160 | $80.00 |
| 526E10001 REINFORCED CONCRETE APPROACH SLABS (T=12"), AS PER | 25 SY | $745 | $485 | $475 | $850 | $650 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $4,400 | $5,000 | $5,000 | $7,000 | $31,326 |
| 202E32000 CURB REMOVED | 56 FT | $48.00 | $23.00 | $10.00 | $15.00 | $42.03 |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 108 SY | $30.00 | $14.50 | $29.00 | $50.00 | $50.88 |
| 202E38000 GUARDRAIL REMOVED | 906 FT | $6.00 | $6.25 | $6.00 | $6.00 | $2.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 2 EACH | $650 | $700 | $650 | $651 | $245 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $125 | $135 | $125 | $125 | $85.00 |
| 209E15050 RESHAPING UNDER GUARDRAIL | 0.13 MILE | $6,235 | $8,200 | $7,500 | $7,500 | $1,500 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 587.5 FT | $21.50 | $23.50 | $21.50 | $21.50 | $17.80 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E , (MASH OR NCHRP 350) | 3 EACH | $2,500 | $2,750 | $2,500 | $2,500 | $2,260 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 9 EACH | $2,050 | $2,250 | $2,050 | $2,050 | $2,120 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 106 FT | $311 | $270 | $380 | $170 | $190 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 4 EACH | $4,800 | $1,150 | $4,200 | $5,000 | $3,500 |
| 659E00540 SEEDING AND MULCHING, CLASS 3C | 298 SY | $5.00 | $4.50 | $4.25 | $0.75 | $3.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 15 SY | $1.00 | $4.50 | $4.25 | $0.40 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $1,000 | $1,050 | $1,000 | $1,000 | $525 |
| 659E31000 LIME | 0.06 ACRE | $200 | $160 | $150 | $200 | $100 |
| 659E35000 WATER | 1.6 MGAL | $1.00 | $110 | $100 | $25.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E04600 12" CONDUIT, TYPE C | 7 FT | $561 | $104 | $180 | $200 | $445 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,970 | $1,750 | $2,400 | $2,000 | $2,931 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 0.5 SY | $1,500 | $500 | $3,700 | $1,400 | $26,124 |
| 409E30001 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 64 FT | $15.50 | $5.50 | $8.00 | $5.72 | $20.00 |
| 625E98200 LIGHTING, MISC.: REPAIR DAMAGED LIGHTING SYSTEM | 1 LS | $1,100 | $19,000 | $2,400 | $1,800 | $17,250 |
| 621E00300 RPM REFLECTOR | 13 EACH | $152 | $165 | $153 | $152 | $152 |
| 621E90000 RPM, MISC.: RPM REFLECTOR REMOVED | 13 EACH | $9.00 | $25.00 | $150 | $6.28 | $87.68 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, UNI-DIRECTIONAL | 8 EACH | $12.00 | $13.00 | $12.00 | $12.00 | $12.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, UNI-DIRECTIONAL | 15 EACH | $15.00 | $13.00 | $12.00 | $14.00 | $12.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.25 MILE | $4,090 | $4,300 | $4,200 | $3,958 | $3,958 |
| 642E00200 LANE LINE, 4", TYPE 1 | 0.25 MILE | $3,865 | $4,100 | $3,900 | $3,740 | $3,740 |
| 642E00300 CENTER LINE, TYPE 1 | 0.25 MILE | $4,425 | $4,700 | $4,500 | $4,282 | $4,282 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $11,000 | $21,000 | $20,000 | $20,000 | $20,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 264 LB | $1.43 | $3.50 | $2.85 | $2.87 | $2.50 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 88 EACH | $16.00 | $40.00 | $16.00 | $18.00 | $25.00 |
| 511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT | 2 CY | $3,050 | $3,800 | $3,000 | $5,000 | $2,500 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 941 SY | $20.00 | $55.00 | $20.00 | $22.00 | $20.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 1,518 SY | $16.00 | $17.00 | $13.50 | $23.00 | $13.50 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 941 SY | $25.00 | $21.50 | $25.00 | $20.00 | $25.00 |
| 513E21599 STRUCTURAL STEEL FOR REHABILITATION | 62 LB | $8.00 | $47.00 | $20.15 | $19.42 | $35.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 19,258 SF | $1.50 | $5.50 | $5.00 | $1.50 | $1.50 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 19,258 SF | $1.50 | $3.25 | $3.00 | $1.50 | $1.50 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 19,258 SF | $1.50 | $1.10 | $1.00 | $1.50 | $1.50 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 31 MNHR | $100 | $165 | $150 | $100 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 17 EACH | $300 | $275 | $250 | $300 | $300 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 165 FT | $48.00 | $55.00 | $68.00 | $60.00 | $63.00 |
| 516E44000 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 26 EACH | $775 | $825 | $524 | $850 | $1,015 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $14,250 | $8,500 | $13,000 | $13,000 | $17,500 |
| 518E51101 8" PIPE DOWNSPOUT, INCLUDING SPECIALS, AS PER PLAN | 20 FT | $276 | $300 | $290 | $260 | $175 |
| 518E63300 STRUCTURE DRAINAGE, MISC.: PLUG SCUPPER | 1 LS | $1,880 | $1,600 | $2,300 | $250 | $1,250 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: CLEANING OF DRAINAGE | 1 LS | $1,000 | $9,000 | $7,000 | $2,000 | $5,000 |
| 530E00200 SPECIAL - STRUCTURES, MISC.: SWEEPING BRIDGES | 1 LS | $413 | $925 | $3,500 | $4,000 | $5,000 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING BRIDGE JOINT | 2 EACH | $550 | $4,700 | $3,200 | $3,800 | $1,500 |
| 530E00400 SPECIAL - STRUCTURES, MISC.: CLEANING OF BRIDGE SE | 2 EACH | $1,230 | $2,250 | $2,600 | $3,000 | $1,500 |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $85.00 | $100 | $85.00 | $70.00 | $131 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,900 | $2,000 | $1,900 | $1,900 | $1,900 |
| 614E12420 DETOUR SIGNING | 1 LS | $15,317 | $15,000 | $13,640 | $13,640 | $9,450 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, UNI-DIRECTIONAL | 30 EACH | $10.00 | $11.00 | $10.00 | $10.00 | $10.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 30 EACH | $15.00 | $16.00 | $15.00 | $15.00 | $15.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $985 | $900 | $900 | $995 |
| 614E20200 WORK ZONE LANE LINE, CLASS I, 4", 740.06, TYPE I | 0.15 MILE | $5,740 | $3,700 | $3,400 | $3,400 | $3,400 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.15 MILE | $14,500 | $12,500 | $11,700 | $11,700 | $11,700 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.28 MILE | $7,650 | $7,000 | $6,500 | $650 | $6,500 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,320 FT | $8.00 | $20.00 | $19.00 | $16.00 | $19.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | $150,000 | $55,000 | $90,000 | $79,067 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $50,000 | $60,000 | $30,000 | $41,000 | $85,315 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $500 | $25,000 | $5,000 | $10,000 | $6,489 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10300 STRUCTURAL STEEL MEMBERS, LEVEL 5 | 291,444 LB | $2.85 | $831k | 10% |
| 638E98100 WATER WORK, MISC.:BRIDGE WATERLINE | 1 LS | $550,000 | $550k | 7% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 363 CY | $1,190 | $432k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 184,916 LB | $1.75 | $324k | 4% |
| 203E20000 EMBANKMENT | 22,862 CY | $13 | $297k | 4% |
| 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN | 53,992 LB | $4 | $216k | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $205,931 | $206k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 3% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 19,258 SF | $10 | $193k | 2% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 1,825 CY | $100 | $183k | 2% |