PUT-SR 115-09.89
PUT County · est $0.9M
Bid dateThursday, December 17—
PUT County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 67 more items below.
| Item | Quantity | R1R & I Construction INC | R2R G Zachrich Construction INC | R3Miller Bros Const INC | R4Eagle Bridge CO | R5Complete General Construction Company | R6Vernon Nagel INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 511E33312 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 239 CY | $750 | $486 | $750 | $900 | $725 | $1,050 | 28% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 67,458 LB | $1.00 | $1.10 | $1.15 | $1.10 | $1.00 | $1.19 | 10% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 218 FT | $299 | $395 |
| Item | Quantity | R1R & I Construction INC | R2R G Zachrich Construction INC | R3Miller Bros Const INC | R4Eagle Bridge CO | R5Complete General Construction Company | R6Vernon Nagel INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $500 | $1,000 | $250 | $9,000 | $1,000 |
| 202E23000 PAVEMENT REMOVED | 623 SY | $6.00 | $7.50 | $6.00 | $7.00 | $15.00 | $12.00 |
| 202E38000 GUARDRAIL REMOVED | 69 FT | $1.00 | $2.50 | $2.50 | $4.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $328 |
| $200 |
| $85.00 |
| $320 |
| 10% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 173 SY | $230 | $200 | $250 | $225 | $240 | $225 | 6% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $35,000 | $95,000 | $45,000 | $33,000 | $65,000 | $65,000 | 5% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 68 CY | $500 | $350 | $625 | $700 | $1,200 | $800 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $29,000 | $40,000 | $20,000 | $20,000 | $40,000 | $40,000 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 156 CY | $165 | $165 | $202 | $165 | $196 | $202 | 4% |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 20 CY | $1,200 | $900 | $2,250 | $3,000 | $2,000 | $2,500 | 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $20,000 | $16,000 | $15,000 | $24,000 | $35,000 | $26,000 | 3% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 27 CF | $585 | $585 | $585 | $585 | $585 | $600 | 2% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 278 CY | $55.00 | $25.00 | $45.00 | $45.00 | $50.00 | $55.00 | 2% |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | 360 FT | $40.00 | $26.00 | $45.00 | $40.00 | $30.00 | $40.00 | 2% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 350 FT | $40.00 | $22.00 | $40.00 | $6.00 | $25.00 | $28.00 | 2% |
| 511E51512 CLASS QC2 CONCRETE WITH QC/QA, SIDEWALK | 23 CY | $600 | $200 | $500 | $550 | $550 | $600 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 55 CY | $226 | $226 | $240 | $226 | $267 | $240 | 2% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 143 FT | $80.00 | $80.00 | $90.00 | $125 | $125 | $88.00 | 2% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $10,000 | $25,000 | $10,000 | $20,000 | $12,000 | $12,000 | 2% |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 78 FT | $125 | $85.00 | $150 | $140 | $200 | $100 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 4 EACH | $2,420 | $2,250 | $2,250 | $2,560 | $2,420 | $2,250 | 1% |
| $2.00 |
| $2.50 |
| 202E98100 REMOVAL MISC.:SCHOOL SPEED LIMIT SIGN ASSEMBLY STR | 1 EACH | $570 | $157 | $425 | $300 | $2,000 | $570 |
| 203E10000 EXCAVATION | 774 CY | $10.00 | $15.00 | $20.00 | $24.00 | $15.00 | $20.00 |
| 203E20000 EMBANKMENT | 151 CY | $15.00 | $18.00 | $20.00 | $24.00 | $25.00 | $22.00 |
| 204E10000 SUBGRADE COMPACTION | 905 SY | $1.00 | $2.05 | $1.50 | $5.00 | $7.00 | $1.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $25.00 | $197 | $200 | $150 | $200 | $270 |
| 204E50000 GEOTEXTILE FABRIC | 894 SY | $1.00 | $1.00 | $1.75 | $1.00 | $2.00 | $1.50 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 50 FT | $29.80 | $22.50 | $22.50 | $18.10 | $29.80 | $22.50 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,340 | $2,100 | $2,100 | $2,355 | $2,340 | $2,100 |
| 608E10000 4" CONCRETE WALK | 883 SF | $4.75 | $4.75 | $6.75 | $6.50 | $9.00 | $7.50 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 133 CY | $70.00 | $35.26 | $75.00 | $65.00 | $75.00 | $112 |
| 659E00300 TOPSOIL | 93 CY | $15.00 | $30.00 | $20.00 | $35.00 | $25.00 | $25.00 |
| 659E10000 SEEDING AND MULCHING | 839 SY | $2.00 | $3.10 | $3.00 | $5.00 | $7.60 | $3.10 |
| 659E14000 REPAIR SEEDING AND MULCHING | 42 SY | $1.00 | $3.10 | $1.00 | $2.00 | $0.46 | $3.10 |
| 659E15000 INTER-SEEDING | 42 SY | $1.00 | $1.00 | $0.20 | $2.00 | $0.11 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $500 | $600 | $400 | $1,250 | $630 | $600 |
| 659E31000 LIME | 0.17 ACRE | $10.00 | $30.00 | $1.00 | $10.00 | $57.24 | $30.00 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $10.00 | $0.80 | $1.00 |
| 832E30000 EROSION CONTROL | 8,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 372 FT | $12.00 | $9.89 | $11.50 | $11.00 | $25.00 | $15.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 75 FT | $12.00 | $23.40 | $20.00 | $14.00 | $25.00 | $25.00 |
| 611E04400 12" CONDUIT, TYPE B | 120 FT | $25.00 | $75.00 | $110 | $80.00 | $125 | $85.00 |
| 611E98160 CATCH BASIN, NO. 3 WITH DIAGONAL GRATE | 1 EACH | $1,500 | $3,110 | $3,500 | $3,100 | $4,000 | $3,000 |
| 611E98190 CATCH BASIN, NO. 3A WITH DIAGONAL GRATE | 1 EACH | $1,500 | $2,742 | $2,800 | $2,500 | $3,000 | $2,500 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $2,000 | $3,387 | $3,500 | $3,200 | $4,500 | $4,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $200 | $284 | $240 | $250 | $500 | $250 |
| 304E20000 AGGREGATE BASE | 155 CY | $50.00 | $50.00 | $55.00 | $75.00 | $85.00 | $65.00 |
| 407E20000 NON-TRACKING TACK COAT | 73 GAL | $4.00 | $4.00 | $1.00 | $4.00 | $3.50 | $1.00 |
| 609E24511 CURB, TYPE 4-C, AS PER PLAN | 230 FT | $24.50 | $24.50 | $27.50 | $28.00 | $30.00 | $42.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 8 EACH | $8.00 | $8.00 | $8.50 | $8.00 | $7.75 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 21 FT | $21.00 | $21.00 | $15.00 | $21.00 | $15.00 | $21.00 |
| 630E80100 SIGN, FLAT SHEET | 18 SF | $42.00 | $42.00 | $20.00 | $42.00 | $20.00 | $42.00 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 3 EACH | $10.00 | $25.00 | $25.00 | $25.00 | $15.00 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $10.00 | $15.00 | $25.00 | $15.00 | $20.00 | $15.00 |
| 631E84000 SIGN SERVICE | 1 EACH | $1,920 | $1,760 | $1.00 | $150 | $1,000 | $1,920 |
| 631E93250 SCHOOL SPEED LIMIT SIGN ASSEMBLY, MISC.: RELOCATIO | 1 EACH | $2,030 | $3,980 | $1.00 | $500 | $6,000 | $2,030 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.12 MILE | $5,000 | $5,000 | $5,000 | $5,000 | $10,475 | $5,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $10,000 | $10,000 | $10,000 | $10,000 | $16,825 | $10,000 |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 24 FT | $2.00 | $2.00 | $2.00 | $2.00 | $10.40 | $2.00 |
| 642E01100 SCHOOL SYMBOL MARKING, 72", TYPE 1 | 1 EACH | $250 | $250 | $250 | $250 | $500 | $250 |
| 625E32000 GROUND ROD | 1 EACH | $280 | $325 | $325 | $325 | $350 | $280 |
| 625E75800 DISCONNECT CIRCUIT | 1 EACH | $62.00 | $955 | $955 | $955 | $300 | $62.00 |
| 632E64001 STRAIN POLE FOUNDATION, AS PER PLAN | 1 EACH | $2,900 | $2,255 | $2,255 | $2,255 | $10,000 | $2,900 |
| 407E20000 NON-TRACKING TACK COAT | 35 GAL | $4.00 | $4.00 | $1.00 | $4.00 | $3.50 | $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 15 CY | $226 | $226 | $175 | $226 | $594 | $175 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $237 | $237 | $175 | $237 | $200 | $175 |
| 616E10000 WATER | 5 MGAL | $1.00 | $1.00 | $75.00 | $10.00 | $60.00 | $10.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $30.00 | $25.00 | $60.00 | $70.00 | $75.00 | $70.00 |
| 202E22900 APPROACH SLAB REMOVED | 67 SY | $20.00 | $80.00 | $27.00 | $40.00 | $35.00 | $45.00 |
| 202E23500 WEARING COURSE REMOVED | 396 SY | $5.00 | $7.50 | $7.50 | $10.00 | $20.00 | $7.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100 | $4,000 | $1.00 | $30,000 | $60,000 | $22,000 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 280 FT | $5.00 | $2.00 | $10.00 | $36.00 | $20.00 | $4.00 |
| 507E93300 STEEL POINTS OR SHOES | 14 EACH | $100 | $95.00 | $115 | $110 | $133 | $90.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 99 SY | $10.00 | $9.86 | $11.50 | $10.00 | $10.00 | $10.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 366 SY | $22.00 | $22.60 | $25.00 | $20.50 | $20.50 | $25.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 58 SF | $4.00 | $8.74 | $5.00 | $5.00 | $15.00 | $10.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 82 SF | $4.00 | $4.73 | $6.00 | $6.00 | $15.00 | $12.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 112 FT | $20.00 | $20.00 | $30.00 | $30.00 | $50.00 | $40.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $2,500 | $5,000 | $7,500 | $7,500 | $7,500 | $5,500 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 89 FT | $8.00 | $8.00 | $9.00 | $10.00 | $12.00 | $8.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 72 FT | $8.00 | $16.83 | $12.00 | $10.00 | $15.00 | $8.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $12,000 | $8,000 | $9,000 | $9,000 | $12,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,750 | $6,000 | $5,250 | $4,500 | $9,000 | $5,000 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $800 | $1,200 | $1,900 | $1,750 | $2,500 | $1,400 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $8,000 | $6,200 | $7,500 | $5,000 | $3,900 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E33312 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 239 CY | $750 | $179k | 23% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 67,458 LB | $1 | $67k | 9% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 218 FT | $299 | $65k | 8% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 173 SY | $230 | $40k | 5% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $35,000 | $35k | 4% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 68 CY | $500 | $34k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $29,000 | $29k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 156 CY | $165 | $26k | 3% |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 20 CY | $1,200 | $24k | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $20,000 | $20k | 3% |