MEG-US 33-08.66 R
MEG County · est $0.1M
Bid dateThursday, June 4—
MEG County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 16items by winning bid’s extended amount.
| Item | Quantity | R1Bcc Ohio INC | R2Ohio-west Virginia Excavating CO | R3D G M INC | R4Becdir Construction Company | R5R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|---|---|
| 511E32210 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 9.5 CY | $1,770 | $3,200 | $3,600 | $4,500 | $1,850 | 20% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $11,882 | $12,000 | $28,000 | $18,000 | $30,000 | 14% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 280 FT | $35.10 | $60.00 | $22.50 | $33.50 | $35.00 | 12% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $9,683 | $12,000 | $25,000 | $31,000 | $18,000 | 11% |
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 68.75 FT | $135 | $150 | $130 | $135 | $150 | 11% |
| 624E10000 MOBILIZATION | 1 LS |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $7,241 |
| $4,300 |
| $5,000 |
| $7,000 |
| $15,000 |
| 9% |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 1 EACH | $5,381 | $5,000 | $4,000 | $5,050 | $6,500 | 6% |
| 659E00511 SEEDING AND MULCHING, CLASS 2, AS PER PLAN | 667 SY | $5.78 | $5.00 | $3.50 | $3.20 | $15.00 | 5% |
| 606E13000 GUARDRAIL, TYPE 5 | 87.5 FT | $26.04 | $43.00 | $35.00 | $36.00 | $40.00 | 3% |
| 509E25000 UNCOATED REINFORCING STEEL | 1,397 LB | $1.50 | $2.75 | $4.00 | $1.50 | $10.00 | 2% |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 75 FT | $22.33 | $20.00 | $20.00 | $26.00 | $10.00 | 2% |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 1 EACH | $1,656 | $5,000 | $2,000 | $2,500 | $2,500 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,050 | $3,000 | $6,000 | $3,000 | $8,500 | 1% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 1 EACH | $1,029 | $650 | $600 | $1,575 | $750 | 1% |
| 642E00100 EDGE LINE, 4", TYPE 1 (YELLOW) | 0.07 MILE | $13,466 | $15,000 | $15,000 | $13,500 | $25,000 | 1% |
| 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $336 | $300 | $275 | $158 | $650 | 0% |
| Item |
|---|
| Qty |
|---|
| Unit price |
|---|
| Extended |
|---|
| % |
|---|
| 511E32210 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 9.5 CY | $1,770 | $17k | 20% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $11,882 | $12k | 14% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 280 FT | $35.1 | $10k | 12% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $9,683 | $10k | 11% |
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 68.75 FT | $135.24 | $9k | 11% |
| 624E10000 MOBILIZATION | 1 LS | $7,241 | $7k | 9% |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 1 EACH | $5,381 | $5k | 6% |
| 659E00511 SEEDING AND MULCHING, CLASS 2, AS PER PLAN | 667 SY | $5.78 | $4k | 5% |
| 606E13000 GUARDRAIL, TYPE 5 | 87.5 FT | $26.04 | $2k | 3% |
| 509E25000 UNCOATED REINFORCING STEEL | 1,397 LB | $1.5 | $2k | 2% |