WAS-SR 339-07.51
WAS County · est $0.7M
Bid dateThursday, July 2—
WAS County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 53 more items below.
| Item | Quantity | R1Beaver Excavating Company | R2Shelly & Sands INC | R3D G M INC | R4Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 504 CY | $192 | $192 | $200 | $193 | 17% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 526 CY | $183 | $183 | $190 | $184 | 16% |
| 203E10000 EXCAVATION | 4,847 CY | $15.00 | $21.00 | $25.00 | $23.50 | 12% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $59,000 | $65,000 | $2,000 | $15,000 | 10% |
| Item | Quantity | R1Beaver Excavating Company | R2Shelly & Sands INC | R3D G M INC | R4Eclipse CO LLC |
|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 3 EACH | $190 | $150 | $300 | $545 |
| 202E30000 WALK REMOVED | 308 SF | $3.00 | $1.50 | $5.00 | $3.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 220 FT | $8.90 | $26.00 | $15.00 | $12.00 |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 61 CY | $70.00 | $78.00 | $85.00 | $84.00 |
| 209E60500 LINEAR GRADING | 0.03 MILE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 304E20000 AGGREGATE BASE | 617 CY | $84.10 | $88.00 | $85.00 | $79.50 | 9% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,160 FT | $14.00 | $15.00 | $15.00 | $24.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $20,000 | $43,062 | 3% |
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 249 CY | $80.00 | $100 | $90.00 | $93.50 | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $19,000 | $25,000 | $68,000 | $105,000 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (91 CY | $199 | $199 | $210 | $201 | 3% |
| 611E16400 36" CONDUIT, TYPE B | 123 FT | $145 | $182 | $110 | $137 | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 6 EACH | $1,980 | $2,000 | $1,800 | $1,976 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $21,000 | $25,000 | $13,500 | 2% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 903 SY | $10.50 | $6.00 | $15.00 | $13.50 | 2% |
| 203E20000 EMBANKMENT | 1,159 CY | $8.00 | $17.00 | $22.00 | $20.00 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 525 FT | $17.60 | $16.50 | $23.00 | $18.50 | 2% |
| 204E10000 SUBGRADE COMPACTION | 2,491 SY | $3.50 | $4.00 | $4.00 | $2.00 | 1% |
| 659E10000 SEEDING AND MULCHING | 9,908 SY | $0.86 | $0.80 | $1.50 | $1.00 | 1% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $7,000 | $6,000 | $6,000 | $5,832 | 1% |
| $30,500 |
| $10,000 |
| $10,000 |
| $45,738 |
| 606E20050 ROUNDED END SECTION | 2 EACH | $65.00 | $50.00 | $25.00 | $67.50 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,380 | $2,300 | $2,250 | $2,475 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $985 | $900 | $900 | $997 |
| 608E10000 4" CONCRETE WALK | 429 SF | $16.00 | $28.50 | $20.00 | $18.00 |
| 608E53020 DETECTABLE WARNING | 72 SF | $27.00 | $37.25 | $40.00 | $32.50 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 1 EACH | $2,480 | $3,000 | $3,000 | $2,591 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 3 EACH | $145 | $185 | $200 | $75.00 |
| 601E11000 RIPRAP, TYPE D, USING 6" REINFORCED CONCRETE SLAB | 1.3 SY | $370 | $1,300 | $1,000 | $660 |
| 659E00300 TOPSOIL | 132 CY | $10.00 | $31.00 | $20.00 | $91.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.9 TON | $610 | $694 | $680 | $635 |
| 659E31000 LIME | 2.05 ACRE | $75.00 | $154 | $80.00 | $78.00 |
| 659E35000 WATER | 54 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 584 SY | $2.50 | $1.64 | $3.00 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $1,300 | $2,000 | $2,080 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $3,500 | $6,000 | $5,500 | $7,280 |
| 602E20000 CONCRETE MASONRY | 3.44 CY | $1,470 | $1,800 | $1,200 | $2,629 |
| 605E31100 AGGREGATE DRAINS | 458 FT | $14.05 | $13.00 | $15.00 | $11.50 |
| 611E04400 12" CONDUIT, TYPE B | 77 FT | $58.00 | $90.50 | $75.00 | $56.50 |
| 611E05700 15" CONDUIT, TYPE A | 93 FT | $60.00 | $100 | $85.00 | $66.00 |
| 611E98341 CATCH BASIN, NO. 5A | 1 EACH | $4,350 | $4,100 | $7,000 | $4,122 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $2,150 | $3,100 | $3,500 | $3,804 |
| 407E20000 NON-TRACKING TACK COAT | 894 GAL | $4.00 | $4.00 | $4.00 | $4.00 |
| 408E10000 PRIME COAT | 275 GAL | $13.00 | $8.00 | $10.00 | $8.32 |
| 617E10100 COMPACTED AGGREGATE | 29 CY | $83.50 | $160 | $140 | $138 |
| 621E00100 RPM | 33 EACH | $105 | $75.00 | $105 | $78.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 14 EACH | $21.50 | $12.00 | $1.00 | $8.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 182 FT | $12.50 | $12.00 | $13.00 | $15.50 |
| 630E08600 SIGN POST REFLECTOR | 5 EACH | $45.00 | $45.00 | $45.00 | $47.00 |
| 630E80100 SIGN, FLAT SHEET | 95 SF | $19.00 | $25.00 | $20.00 | $22.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 5 EACH | $15.00 | $20.00 | $20.00 | $69.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $20.00 | $20.00 | $58.00 |
| 630E86275 REMOVAL OF GROUND MOUNTED PIPE SUPPORT AND REERECT | 1 EACH | $2,120 | $4,000 | $2,500 | $901 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.67 MILE | $3,915 | $1,281 | $3,200 | $7,406 |
| 642E00300 CENTER LINE, TYPE 1 | 0.58 MILE | $4,100 | $1,936 | $6,200 | $7,756 |
| 644E00404 CHANNELIZING LINE, 12" | 235 FT | $2.45 | $2.30 | $2.60 | $4.50 |
| 644E00500 STOP LINE | 122 FT | $5.95 | $12.10 | $9.00 | $11.50 |
| 644E00600 CROSSWALK LINE | 303 FT | $3.95 | $5.25 | $4.50 | $7.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 300 FT | $5.80 | $9.55 | $9.00 | $11.00 |
| 644E00900 ISLAND MARKING | 48 SF | $3.80 | $3.50 | $6.00 | $7.00 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $500 | $710 | $600 | $946 |
| 644E01300 LANE ARROW | 3 EACH | $150 | $122 | $150 | $284 |
| 644E01510 DOTTED LINE, 6" | 50 FT | $2.40 | $1.80 | $3.00 | $4.50 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 44 EACH | $8.90 | $9.00 | $15.00 | $11.50 |
| 614E13360 OBJECT MARKER, TWO WAY | 44 EACH | $13.50 | $18.00 | $15.00 | $15.50 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 1 MILE | $1,350 | $1,350 | $3,000 | $1,404 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 24 FT | $14.00 | $14.00 | $15.00 | $14.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $4,750 | $20,000 | $14,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $10,000 | $7,500 | $26,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 504 CY | $192 | $97k | 14% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 526 CY | $183 | $96k | 14% |
| 203E10000 EXCAVATION | 4,847 CY | $15 | $73k | 10% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $59,000 | $59k | 8% |
| 304E20000 AGGREGATE BASE | 617 CY | $84.1 | $52k | 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,160 FT | $14 | $30k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 249 CY | $80 | $20k | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $19,000 | $19k | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (91 CY | $199 | $18k | 3% |