DAR-US 127-21.59
DAR County · est $0.3M
Bid dateThursday, January 14—
DAR County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Bridge Specialists INC | R3Chagrin Valley Paving INC | R4Eagle Bridge CO | R5Brumbaugh Construction INC | R6Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,343 SY | $40.76 | $31.00 | $48.00 | $55.00 | $45.00 | $33.00 | 27% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,343 SY | $34.25 | $43.00 | $27.00 | $53.50 | $55.00 | $78.00 | 23% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 525 SY | $22.79 | $26.00 | $30.00 |
| Item | Quantity | R1Bcc Ohio INC | R2Bridge Specialists INC | R3Chagrin Valley Paving INC | R4Eagle Bridge CO | R5Brumbaugh Construction INC | R6Complete General Construction Company |
|---|---|---|---|---|---|---|---|
| 659E10000 SEEDING AND MULCHING | 100 SY | $1.17 | $19.60 | $7.00 | $5.00 | $5.00 | $19.60 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $1,995 | $9.00 | $800 | $750 | $650 | $450 |
| 659E35000 WATER | 1 MGAL | $10.50 | $1.00 | $10.00 | $10.00 | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $20.00 |
| $32.00 |
| $20.00 |
| 6% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 31 CY | $384 | $500 | $450 | $366 | $450 | $366 | 6% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 521 SY | $18.08 | $16.00 | $18.00 | $23.50 | $20.00 | $23.50 | 5% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $7,605 | $5,000 | $6,000 | $7,500 | $7,500 | $15,000 | 4% |
| 202E23500 WEARING COURSE REMOVED | 245 SY | $25.65 | $6.50 | $9.00 | $4.00 | $25.00 | $20.00 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIES 3/4" TO | 445 SY | $13.65 | $6.50 | $9.00 | $4.00 | $15.00 | $3.15 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $5,962 | $13,243 | $22,700 | $10,000 | $14,257 | $10,000 | 3% |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $9,100 | $5,000 | $6,500 | $5,000 | $7,500 | 2% |
| 516E46701 RESET BEARING, AS PER PLAN | 6 EACH | $788 | $550 | $925 | $1,650 | $1,600 | $2,100 | 2% |
| 618E40800 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 285 FT | $16.43 | $18.00 | $26.00 | $17.00 | $16.00 | $15.65 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $4,184 | $9,000 | $7,000 | $12,500 | $11,500 | $11,000 | 2% |
| 646E10010 EDGE LINE, 6" | 0.18 MILE | $21,812 | $20,715 | $50,000 | $20,715 | $23,000 | $20,715 | 2% |
| 646E10200 CENTER LINE | 0.09 MILE | $43,610 | $26,280 | $50,000 | $26,280 | $46,000 | $26,280 | 2% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 42 SF | $92.69 | $195 | $140 | $150 | $185 | $135 | 2% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 14 CY | $278 | $350 | $300 | $170 | $165 | $175 | 2% |
| 848E50000 HAND CHIPPING | 23 SY | $134 | $125 | $130 | $100 | $100 | $75.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,580 | $6,000 | $2,700 | $4,000 | $4,000 | $3,000 | 1% |
| 848E50200 FULL-DEPTH REPAIR | 2 CY | $1,058 | $500 | $2,000 | $750 | $1,000 | $500 | 1% |
| $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 59 GAL | $9.61 | $4.00 | $1.00 | $4.00 | $10.00 | $4.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $24.38 | $25.00 | $25.00 | $10.00 | $50.00 | $20.00 |
| 616E10000 WATER | 1 MGAL | $10.50 | $1.00 | $10.00 | $10.00 | $5.00 | $60.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $1.60 | $2.00 | $4.00 | $1.00 | $10.00 | $5.00 |
| 513E95020 STRUCTURAL STEEL, MISC.:REPAIR CRACKED WELDS | 1 LS | $1,050 | $1,000 | $1,200 | $6,500 | $15,000 | $16,000 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 91 FT | $19.49 | $26.00 | $21.00 | $16.00 | $20.00 | $22.00 |
| 516E46900 BEARING DEVICE, MISC.:REPLACE EXISTING ANCHOR BOLT | 4 EACH | $431 | $1,875 | $1,000 | $1,000 | $1,400 | $2,500 |
| 848E50100 TEST SLAB | 1 LS | $1,028 | $1,250 | $1,500 | $1,500 | $1,200 | $5,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $1,635 | $7,500 | $4,450 | $10,000 | $2,000 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,830 | $500 | $2,000 | $1,500 | $1,500 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 1,343 SY | $40.76 | $55k | 26% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 1,343 SY | $34.25 | $46k | 21% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 525 SY | $22.79 | $12k | 6% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 31 CY | $384.3 | $12k | 6% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 521 SY | $18.08 | $9k | 4% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $7,605 | $8k | 4% |
| 202E23500 WEARING COURSE REMOVED | 245 SY | $25.65 | $6k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIES 3/4" TO | 445 SY | $13.65 | $6k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $5,962 | $6k | 3% |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $5k | 2% |