DEF-SR 2-09.01
DEF County · est $1.1M
Bid dateThursday, January 14—
DEF County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 41 more items below.
| Item | Quantity | R1R & I Construction INC | R2Chagrin Valley Paving INC | R3Miller Bros Const INC | R4Vernon Nagel INC | R5Eagle Bridge CO | R6Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 511E33312 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 328 CY | $800 | $510 | $725 | $850 | $780 | $800 | 30% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 81,326 LB | $1.20 | $1.10 | $1.25 | $1.10 | $1.15 | $1.00 | 11% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $66,400 | $70,000 | $50,000 |
| Item | Quantity | R1R & I Construction INC | R2Chagrin Valley Paving INC | R3Miller Bros Const INC | R4Vernon Nagel INC | R5Eagle Bridge CO | R6Rietschlin Construction INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $2,500 | $2,000 | $1,000 | $500 | $8,000 |
| 202E23000 PAVEMENT REMOVED | 922 SY | $5.00 | $20.00 | $11.50 | $8.00 | $9.00 | $7.00 |
| 202E38000 GUARDRAIL REMOVED | 606 FT | $1.00 | $1.40 | $1.40 | $2.00 | $3.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $75,000 |
| $45,000 |
| $70,000 |
| 8% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 244 SY | $245 | $245 | $275 | $225 | $250 | $210 | 7% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 102 CY | $500 | $485 | $345 | $500 | $350 | $440 | 6% |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 800 FT | $50.00 | $53.00 | $95.00 | $80.00 | $85.00 | $86.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $49,000 | $20,000 | $40,000 | $40,000 | $60,000 | 5% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 900 FT | $40.00 | $31.00 | $47.00 | $45.00 | $50.00 | $41.00 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 171 CY | $194 | $200 | $194 | $200 | $200 | $215 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 220 FT | $140 | $140 | $140 | $140 | $140 | $151 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 116 CY | $218 | $240 | $218 | $240 | $240 | $266 | 3% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 41 CF | $527 | $425 | $527 | $525 | $675 | $570 | 3% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 213 CY | $70.00 | $90.00 | $80.00 | $85.00 | $75.00 | $65.00 | 2% |
| 526E90010 TYPE A INSTALLATION | 97 FT | $150 | $120 | $170 | $100 | $135 | $125 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $9,250 | $10,000 | $10,000 | $20,000 | $12,000 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $13,000 | $12,000 | $20,000 | $15,000 | $35,000 | $32,000 | 2% |
| 304E20000 AGGREGATE BASE | 218 CY | $50.00 | $65.05 | $60.00 | $65.00 | $75.00 | $70.00 | 1% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $10,000 | $36,000 | $25,000 | $35,000 | $30,000 | $10,000 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,450 | $2,450 | $2,450 | $2,450 | $2,450 | $2,646 | 1% |
| $2.75 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $100 | $250 | $250 | $250 | $300 | $351 |
| 203E10000 EXCAVATION | 99 CY | $8.00 | $40.00 | $25.00 | $20.00 | $30.00 | $24.00 |
| 203E20000 EMBANKMENT | 46 CY | $10.00 | $90.00 | $25.00 | $20.00 | $50.00 | $42.00 |
| 204E10000 SUBGRADE COMPACTION | 1,070 SY | $1.00 | $2.50 | $1.75 | $1.00 | $5.00 | $1.50 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 125 FT | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 | $19.50 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,175 | $2,175 | $2,175 | $2,175 | $2,175 | $2,349 |
| 659E10000 SEEDING AND MULCHING | 501 SY | $4.00 | $5.00 | $4.60 | $4.60 | $4.00 | $7.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $500 | $750 | $600 | $600 | $1,250 | $800 |
| 659E35000 WATER | 3 MGAL | $1.00 | $10.00 | $1.00 | $1.00 | $10.00 | $20.00 |
| 605E31100 AGGREGATE DRAINS | 146 FT | $10.00 | $35.00 | $18.00 | $14.00 | $10.00 | $11.50 |
| 407E10000 TACK COAT | 126 GAL | $4.00 | $1.00 | $4.00 | $1.00 | $1.00 | $2.25 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 4 EACH | $55.00 | $55.00 | $75.00 | $75.00 | $75.00 | $81.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BI-DIRECTIONAL) | 12 EACH | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 | $9.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $65.00 | $65.00 | $45.00 | $45.00 | $30.00 | $33.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $95.00 | $95.00 | $83.00 | $83.00 | $30.00 | $33.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.14 MILE | $5,500 | $5,500 | $5,500 | $5,500 | $5,500 | $6,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.07 MILE | $11,000 | $11,000 | $11,000 | $11,000 | $11,000 | $12,000 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $295 | $250 | $295 | $250 | $250 | $314 |
| 407E10000 TACK COAT | 20 GAL | $4.00 | $1.00 | $4.00 | $1.00 | $1.00 | $2.25 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $305 | $250 | $305 | $250 | $250 | $422 |
| 616E10000 WATER | 1 MGAL | $1.00 | $50.00 | $75.00 | $10.00 | $10.00 | $20.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $29.00 | $98.50 | $75.00 | $78.99 | $70.00 | $65.00 |
| 202E22900 APPROACH SLAB REMOVED | 229 SY | $10.00 | $35.00 | $35.00 | $27.93 | $40.00 | $30.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $500 | $9,000 | $1.00 | $15,000 | $20,000 | $32,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 780 FT | $5.00 | $14.00 | $10.00 | $6.00 | $5.00 | $15.00 |
| 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 720 FT | $5.00 | $14.00 | $10.00 | $8.00 | $7.00 | $17.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 104 SY | $25.00 | $35.00 | $28.00 | $24.00 | $30.00 | $32.50 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 76 SF | $4.00 | $15.00 | $5.00 | $10.00 | $5.00 | $7.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 101 SF | $4.00 | $20.00 | $7.00 | $8.00 | $8.00 | $7.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 114 FT | $20.00 | $20.00 | $30.00 | $30.00 | $35.00 | $26.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $2,000 | $5,000 | $7,000 | $5,000 | $10,000 | $5,500 |
| 518E22300 SPECIAL - STEEL DRIP STRIP (DS-1-92) | 250 FT | $10.00 | $17.00 | $14.00 | $10.00 | $15.00 | $12.50 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 138 FT | $8.00 | $18.00 | $8.00 | $8.00 | $10.00 | $11.50 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 80 FT | $8.00 | $20.00 | $12.00 | $8.00 | $15.00 | $13.00 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $2,980 | $3,000 | $3,750 | $3,500 | $3,500 | $4,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $4,900 | $4,000 | $5,000 | $5,000 | $5,200 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $500 | $1,100 | $1,750 | $1,400 | $2,000 | $1,314 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $9,000 | $6,120 | $5,000 | $7,500 | $6,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E33312 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 328 CY | $800 | $262k | 28% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 81,326 LB | $1.2 | $98k | 10% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $66,400 | $66k | 7% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 244 SY | $245 | $60k | 6% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 102 CY | $500 | $51k | 5% |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 800 FT | $50 | $40k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 900 FT | $40 | $36k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 171 CY | $194 | $33k | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 220 FT | $139.5 | $31k | 3% |