HAM-IR 75-14.61
HAM County · est $45M
Bid dateThursday, February 25—
HAM County · est $45M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 529 more items below.
| Item | Quantity | R1Sunesis Construction CO | R2John R Jurgensen Company | R3Complete General Construction Company | R4Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 50,032 CY | $123 | $112 | $112 | $123 | 23% |
| 304E20000 AGGREGATE BASE | 44,490 CY | $54.08 | $44.79 | $45.00 | $57.00 | 9% |
| 452E16050 13.5" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1 | 21,778 SY | $104 | $85.91 | $82.00 | $104 | 9% |
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9,946 CY | $190 | $231 | $235 |
| Item | Quantity | R1Sunesis Construction CO | R2John R Jurgensen Company | R3Complete General Construction Company | R4Kokosing Construction Company INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $72,868 | $100,000 | $89,605 |
| 202E20010 HEADWALL REMOVED | 3 EACH | $248 | $522 | $550 | $1,000 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 39,444 SY | $0.80 | $3.03 | $4.00 | $1.20 |
| 202E30000 WALK REMOVED | 10,228 SF | $1.15 | $2.07 | $2.00 | $2.00 |
| 202E30700 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $190 |
| 7% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 38,914 SY | $45.50 | $45.28 | $45.00 | $47.00 | 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 105,800 FT | $15.10 | $9.95 | $17.00 | $10.00 | 6% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 8,212 CY | $165 | $154 | $155 | $165 | 5% |
| 203E10000 EXCAVATION | 114,258 CY | $11.45 | $8.81 | $12.00 | $12.00 | 5% |
| 832E30000 EROSION CONTROL | 1,248,307 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 206E10500 CEMENT | 5,759 TON | $166 | $165 | $162 | $166 | 4% |
| 203E20000 EMBANKMENT | 156,417 CY | $4.76 | $10.23 | $15.00 | $8.50 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $671,375 | $1,200,000 | $1,200,000 | $1,200,000 | 3% |
| 202E23000 PAVEMENT REMOVED | 88,404 SY | $7.53 | $6.30 | $8.00 | $5.00 | 3% |
| 515E15130 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 8 EACH | $73,506 | $69,000 | $70,000 | $100,000 | 2% |
| 515E15130 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 8 EACH | $73,506 | $69,000 | $70,000 | $100,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $498,215 | $897,234 | $1,445,000 | $1,220,000 | 2% |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 190,682 SY | $2.36 | $2.80 | $3.45 | $4.00 | 2% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 51,887 FT | $8.65 | $9.13 | $9.00 | $11.00 | 2% |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 50,564 FT | $8.65 | $9.77 | $10.00 | $13.00 | 2% |
| 611E26400 72" CONDUIT, TYPE C | 956 FT | $457 | $472 | $400 | $470 | 2% |
| 315 FT |
| $9.87 |
| $65.13 |
| $27.00 |
| $17.00 |
| 202E32000 CURB REMOVED | 1,307 FT | $5.26 | $7.47 | $5.00 | $6.00 |
| 202E32500 CURB AND GUTTER REMOVED | 1,391 FT | $5.80 | $6.81 | $7.00 | $8.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,494 FT | $11.85 | $23.58 | $23.00 | $9.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 68 FT | $44.23 | $35.21 | $45.00 | $23.00 |
| 202E38000 GUARDRAIL REMOVED | 10,069 FT | $3.50 | $3.50 | $2.00 | $3.50 |
| 202E53100 MAILBOX REMOVED | 5 EACH | $125 | $332 | $120 | $90.00 |
| 202E58000 MANHOLE REMOVED | 3 EACH | $677 | $1,706 | $750 | $600 |
| 202E58100 CATCH BASIN REMOVED | 29 EACH | $377 | $1,706 | $360 | $600 |
| 202E58500 CATCH BASIN ABANDONED | 3 EACH | $472 | $1,219 | $650 | $800 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 341 FT | $6.96 | $24.48 | $16.50 | $16.00 |
| 202E75000 FENCE REMOVED | 2,306 FT | $3.75 | $3.75 | $2.50 | $3.75 |
| 203E10001 EXCAVATION, AS PER PLAN | 4,459 CY | $35.02 | $20.97 | $20.00 | $18.00 |
| 204E10000 SUBGRADE COMPACTION | 11,272 SY | $1.51 | $3.38 | $2.50 | $4.00 |
| 204E13000 EXCAVATION OF SUBGRADE, 18 INCHES DEEP | 17,915 CY | $20.72 | $15.03 | $15.00 | $18.00 |
| 204E20001 EMBANKMENT, AS PER PLAN | 13,866 CY | $4.69 | $8.71 | $30.00 | $32.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 5,041 CY | $54.69 | $39.57 | $41.00 | $60.00 |
| 204E45000 PROOF ROLLING | 75 HOUR | $199 | $187 | $300 | $220 |
| 204E50000 GEOTEXTILE FABRIC | 9,966 SY | $2.21 | $1.96 | $1.50 | $1.60 |
| 206E11000 CURING COAT | 190,682 SY | $1.10 | $1.10 | $1.09 | $1.10 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $59,500 | $59,500 | $49,000 | $59,500 |
| 606E15050 GUARDRAIL, TYPE MGS | 12,037.5 FT | $18.75 | $18.75 | $18.40 | $18.75 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 9 EACH | $1,925 | $1,925 | $1,935 | $1,925 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 11 EACH | $2,375 | $2,375 | $2,430 | $2,375 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 16 EACH | $985 | $985 | $980 | $985 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 6 EACH | $1,950 | $1,950 | $2,140 | $1,950 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 3 EACH | $265 | $265 | $495 | $265 |
| 606E60040 IMPACT ATTENUATOR, TYPE 3 UNIDIRECTIONAL | — | $34,825 | $37,961 | $36,350 | $38,000 |
| 607E23000 FENCE, TYPE CLT | 2,017 FT | $17.75 | $17.75 | $24.40 | $17.75 |
| 607E70000 FENCELINE SEEDING AND MULCHING | 2,017 FT | $1.20 | $1.00 | $2.10 | $1.11 |
| 607E98000 FENCE, MISC.:TEMPORARY CONSTRUCTION FENCE | 2,000 FT | $20.00 | $20.00 | $7.50 | $4.00 |
| 608E10000 4" CONCRETE WALK | 13,636 SF | $5.93 | $6.34 | $5.30 | $9.00 |
| 608E15000 8" CONCRETE WALK | 390 SF | $11.73 | $11.56 | $9.00 | $11.00 |
| 608E52000 CURB RAMP | 761 SF | $27.00 | $22.76 | $16.00 | $16.00 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 1,590 FT | $66.00 | $51.00 | $62.00 | $65.00 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 1 EACH | $3,250 | $7,472 | $4,000 | $3,200 |
| 622E25001 CONCRETE BARRIER END SECTION, TYPE D, AS PER PLAN | 3 EACH | $3,400 | $5,422 | $5,000 | $3,200 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 5 EACH | $2,562 | $5,132 | $4,100 | $2,500 |
| 622E25051 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 5 EACH | $3,780 | $6,422 | $4,000 | $6,400 |
| 623E38500 MONUMENT ASSEMBLY | 4 EACH | $708 | $1,017 | $950 | $900 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 2 EACH | $20.66 | $1,251 | $650 | $300 |
| 690E98000 SPECIAL - BOLLARD REMOVED AND RESET | 3 EACH | $841 | $342 | $985 | $280 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $31,500 | $107,000 | $112,500 | $120,000 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $153,950 | $306,000 | $290,000 | $125,000 |
| 202E23500 WEARING COURSE REMOVED | 127,644 SY | $1.25 | $2.18 | $2.80 | $1.25 |
| 622E10140 CONCRETE BARRIER, SINGLE SLOPE, TYPE C1 | 80 FT | $260 | $240 | $270 | $330 |
| 608E21200 TEMPORARY ASPHALT CONCRETE WALK | 6,410 SF | $3.80 | $4.85 | $4.50 | $26.00 |
| 601E11000 RIPRAP, TYPE D | 9 SY | $268 | $585 | $205 | $560 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 1,368 SY | $85.58 | $43.03 | $74.00 | $70.00 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 4 CY | $108 | $349 | $200 | $230 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 29 CY | $114 | $232 | $117 | $180 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 33 CY | $110 | $239 | $208 | $245 |
| 601E39000 PAVED GUTTER, TYPE 4 | 1,626 FT | $40.00 | $35.50 | $53.00 | $51.00 |
| 601E45050 BIORETENTION CELL | 4,459 CY | $59.44 | $68.47 | $60.00 | $32.00 |
| 659E00100 SOIL ANALYSIS TEST | 5 EACH | $75.00 | $100 | $75.00 | $100 |
| 659E00300 TOPSOIL | 28,390 CY | $9.85 | $2.53 | $12.00 | $11.00 |
| 659E10000 SEEDING AND MULCHING | 220,445 SY | $0.87 | $0.44 | $0.62 | $0.44 |
| 659E14000 REPAIR SEEDING AND MULCHING | 11,023 SY | $0.56 | $0.40 | $1.00 | $0.40 |
| 659E15000 INTER-SEEDING | 11,023 SY | $0.30 | $0.01 | $0.75 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 30.74 TON | $450 | $500 | $450 | $500 |
| 659E31000 LIME | 45.55 ACRE | $30.00 | $1.00 | $5.00 | $1.00 |
| 659E35000 WATER | 1,221 MGAL | $0.50 | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 497 MSF | $1.50 | $1.00 | $7.25 | $1.00 |
| 659E98000 SEEDING, MISC.: BIORETENTION CELLS | 3,350 SY | $1.20 | $2.00 | $1.30 | $2.00 |
| 670E00500 SLOPE EROSION PROTECTION | 23,512 SY | $1.60 | $1.95 | $3.10 | $2.95 |
| 670E00700 DITCH EROSION PROTECTION | 4,425 SY | $2.05 | $1.44 | $1.95 | $3.00 |
| 671E15000 EROSION CONTROL MAT, TYPE A | 3,937 SY | $1.60 | $1.22 | $2.50 | $3.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,600 | $2,425 | $5,000 | $2,425 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $28,860 | $15,960 | $25,000 | $32,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $24,143 | $24,143 | $30,000 | $36,000 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 2,531 SY | $5.15 | $4.30 | $3.90 | $8.00 |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 658 SY | $5.15 | $4.68 | $4.00 | $10.00 |
| 602E20000 CONCRETE MASONRY | 6.72 CY | $1,883 | $2,098 | $1,500 | $1,900 |
| 602E98200 MASONRY, MISC.: SPECIAL HALF-HEIGHT HEADWALL | 4 CY | $1,050 | $1,274 | $2,200 | $3,500 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $11.37 | $33.14 | $12.50 | $31.00 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 389 FT | $9.06 | $31.27 | $13.50 | $22.00 |
| 611E00100 4" CONDUIT, TYPE B | 100 FT | $22.22 | $29.22 | $25.00 | $22.00 |
| 611E00200 4" CONDUIT, TYPE C | 100 FT | $22.22 | $29.22 | $15.00 | $22.00 |
| 611E00200 4" CONDUIT, TYPE C, 707.41 (NON-PERFORATED) | 627 FT | $2.70 | $30.88 | $7.00 | $42.00 |
| 611E00200 4" CONDUIT, TYPE C, 707.41 (PERFORATED) | 2,709 FT | $6.02 | $34.17 | $7.00 | $40.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 3,922 FT | $16.92 | $30.07 | $13.00 | $28.00 |
| 611E00900 6" CONDUIT, TYPE B | 159 FT | $16.46 | $31.42 | $18.00 | $33.00 |
| 611E01100 6" CONDUIT, TYPE C | 100 FT | $13.71 | $30.96 | $16.00 | $27.00 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $14.53 | $30.96 | $13.00 | $27.00 |
| 611E04400 12" CONDUIT, TYPE B | 325 FT | $52.79 | $67.63 | $90.00 | $108 |
| 611E04400 12" CONDUIT, TYPE B, 706.02 | 66 FT | $67.49 | $135 | $105 | $182 |
| 611E04600 12" CONDUIT, TYPE C | 20 FT | $56.32 | $182 | $70.00 | $180 |
| 611E05900 15" CONDUIT, TYPE B | 87 FT | $95.42 | $123 | $95.00 | $570 |
| 611E05900 15" CONDUIT, TYPE B, 706.02 | 123 FT | $97.97 | $147 | $105 | $190 |
| 611E07400 18" CONDUIT, TYPE B | 339 FT | $88.77 | $104 | $92.00 | $180 |
| 611E07400 18" CONDUIT, TYPE B, 706.02 | 150 FT | $129 | $173 | $95.00 | $280 |
| 611E07600 18" CONDUIT, TYPE C | 401 FT | $72.70 | $81.69 | $75.00 | $90.00 |
| 611E08900 21" CONDUIT, TYPE B, 706.02 | 17 FT | $175 | $224 | $160 | $430 |
| 611E10400 24" CONDUIT, TYPE B | 50 FT | $113 | $119 | $105 | $160 |
| 611E10400 24" CONDUIT, TYPE B, 706.02 | 87 FT | $102 | $121 | $120 | $225 |
| 611E12100 27" CONDUIT, TYPE C, 706.02 | 17 FT | $196 | $302 | $160 | $309 |
| 611E13400 30" CONDUIT, TYPE B, 706.02 | 25 FT | $222 | $341 | $160 | $449 |
| 611E13600 30" CONDUIT, TYPE C, 706.02 | 45 FT | $205 | $316 | $145 | $340 |
| 611E16600 36" CONDUIT, TYPE C, 706.02 | 15 FT | $246 | $389 | $180 | $340 |
| 611E24000 60" CONDUIT, TYPE C, 706.02 | 17 FT | $570 | $944 | $400 | $650 |
| 611E96600 CONDUIT, BORED OR JACKED, 18" CONDUIT, TYPE B, 748 | 50 FT | $683 | $765 | $650 | $840 |
| 611E96600 CONDUIT, BORED OR JACKED, 24" CONDUIT, TYPE B, 748 | 280 FT | $497 | $375 | $450 | $470 |
| 611E98150 CATCH BASIN, NO. 3 | 7 EACH | $2,712 | $2,389 | $3,250 | $3,600 |
| 611E98180 CATCH BASIN, NO. 3A | 5 EACH | $2,170 | $1,805 | $2,750 | $3,306 |
| 611E98230 CATCH BASIN, NO. 4 | 9 EACH | $5,634 | $3,966 | $3,800 | $4,400 |
| 611E98300 CATCH BASIN, NO. 5 | 2 EACH | $4,969 | $4,402 | $3,500 | $3,000 |
| 611E98341 CATCH BASIN, NO. 5A | 1 EACH | $5,741 | $4,447 | $5,000 | $6,300 |
| 611E98390 CATCH BASIN, NO. 7 | 2 EACH | $3,541 | $3,353 | $1,800 | $2,300 |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $6,780 | $5,352 | $3,250 | $3,600 |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 1 EACH | $9,006 | $12,568 | $8,500 | $9,100 |
| 611E99115 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D, AS | 4 EACH | $11,549 | $12,855 | $19,700 | $16,000 |
| 611E99574 MANHOLE, NO. 3 | 8 EACH | $12,676 | $9,544 | $10,000 | $11,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 8 EACH | $390 | $822 | $600 | $1,200 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 24 EACH | $314 | $522 | $250 | $450 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $1.92 | $5.52 | $1.50 | $2.00 |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $6,277 | $21,419 | $10,000 | $10,000 |
| 622E25014 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 2 EACH | $5,000 | $5,900 | $5,200 | $6,000 |
| 251E98000 PARTIAL DEPTH REPAIR, MISC.:PERFORMED IN 2021 | 1,000 CY | $228 | $276 | $325 | $228 |
| 251E98000 PARTIAL DEPTH REPAIR, MISC.:PERFORMED IN 2022 | 1,000 CY | $228 | $276 | $325 | $228 |
| 251E98000 PARTIAL DEPTH REPAIR, MISC.:PERFORMED IN 2023 | 300 CY | $266 | $276 | $325 | $266 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1"-3.25") | 19,447 SY | $2.50 | $4.75 | $4.75 | $2.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1.5" AVG) | 80,496 SY | $2.50 | $2.45 | $2.50 | $2.50 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,278 CY | $130 | $134 | $135 | $130 |
| 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN | 667 CY | $160 | $158 | $160 | $160 |
| 407E20000 NON-TRACKING TACK COAT | 39,369 GAL | $3.25 | $4.50 | $4.50 | $3.25 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $1,750 | $1,682 | $1,700 | $1,750 |
| 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (3 CY | $1,715 | $1,654 | $1,700 | $1,715 |
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 415 CY | $160 | $201 | $200 | $160 |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,232 CY | $180 | $205 | $205 | $180 |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 995 CY | $140 | $192 | $190 | $140 |
| 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 667 CY | $175 | $191 | $190 | $175 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 67 SY | $108 | $98.00 | $112 | $115 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 555 FT | $28.10 | $32.39 | $44.00 | $42.00 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 3,272 FT | $34.16 | $32.39 | $32.00 | $42.00 |
| 609E14000 CURB, TYPE 2-A | 419 FT | $24.88 | $8.39 | $13.00 | $22.00 |
| 609E24510 CURB, TYPE 4-C | 76 FT | $39.53 | $82.39 | $45.00 | $63.00 |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 6.58 MILE | $1,525 | $1,000 | $1,525 | $1,750 |
| 203E10001 EXCAVATION, AS PER PLAN (ADDITIONAL EXCAVATION (CI | 5 CY | $30.93 | $41.26 | $60.00 | $120 |
| 203E10001 EXCAVATION, AS PER PLAN (EXPLORATORY EXCAVATION (C | 5 CY | $30.93 | $41.26 | $150 | $330 |
| 509E25000 UNCOATED REINFORCING STEEL | 120 LB | $1.42 | $0.78 | $1.50 | $1.00 |
| 602E98200 MASONRY, MISC.: BRICK MASONRY * | 1 CY | $2,056 | $444 | $800 | $1,600 |
| 602E98200 MASONRY, MISC.: CONCRETE, CLASS QC (CIN. 1110) | 1 CY | $366 | $369 | $300 | $1,300 |
| 638E11500 SHEETING AND BRACING ORDERED LEFT IN PLACE * | 1 MBF | $1.28 | $42.11 | $500 | $1,200 |
| 638E98000 WATER WORK, MISC.: ADJUST EXISTING VALVE CHAMBER T | 4 EACH | $291 | $478 | $350 | $360 |
| 638E98000 WATER WORK, MISC.: DISCONNECTING EXISTING 5/8-INCH | 1 EACH | $6,273 | $1,097 | $250 | $9,000 |
| 638E98000 WATER WORK, MISC.: FURNISHING AND INSTALLING 6" FI | 2 EACH | $495 | $817 | $850 | $1,700 |
| 638E98000 WATER WORK, MISC.: FURNISHING AND INSTALLING FIRE | 2 EACH | $1,321 | $1,074 | $3,500 | $1,600 |
| 638E98000 WATER WORK, MISC.: FURNISHING AND INSTALLING VALVE | 2 EACH | $378 | $599 | $500 | $600 |
| 638E98000 WATER WORK, MISC.: REMOVING CURB AND ROADWAY BOXES | 1 EACH | $68.39 | $239 | $130 | $360 |
| 638E98000 WATER WORK, MISC.: REMOVING EXISTING VALVE BOX (CI | 2 EACH | $98.78 | $436 | $130 | $600 |
| 638E98000 WATER WORK, MISC.: REMOVING FIRE HYDRANT (CIN. 111 | 2 EACH | $776 | $537 | $650 | $2,900 |
| 638E98000 WATER WORK, MISC.: RESETTING EXISTING VALVE BOXES | 3 EACH | $98.77 | $537 | $225 | $360 |
| 638E98600 WATER WORK, MISC.: FURNISHING AND LAYING 12" DUCTI | 24 FT | $876 | $524 | $400 | $1,200 |
| 638E98600 WATER WORK, MISC.: FURNISHING AND LAYING 6" DUCTIL | 82 FT | $211 | $164 | $130 | $300 |
| 611E97910 SPECIAL - SANITARY SEWER, MSD SANITARY SEWER PROTE | 1 LS | $4,500 | $15,001 | $6,000 | $20,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 9 EACH | $431 | $478 | $700 | $2,000 |
| 625E00450 CONNECTION, FUSED PULL APART | 268 EACH | $88.00 | $88.00 | $91.00 | $88.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 48 EACH | $88.00 | $88.00 | $100 | $88.00 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT20B40 | 4 EACH | $3,099 | $3,099 | $2,300 | $3,099 |
| 625E10494 LIGHT POLE, LOW MAST, ATLM50 | 115 EACH | $2,589 | $2,589 | $2,300 | $2,589 |
| 625E14200 LIGHT POLE FOUNDATION, 24" X 10' DEEP | 124 EACH | $1,824 | $1,824 | $900 | $1,824 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 9,978 FT | $3.12 | $3.12 | $2.85 | $3.12 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 18,370 FT | $1.74 | $1.74 | $1.50 | $1.74 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 22,018 FT | $6.91 | $6.91 | $7.00 | $6.91 |
| 625E25400 CONDUIT, 2", 725.04 | 1,676 FT | $18.11 | $18.11 | $24.00 | $18.11 |
| 625E25500 CONDUIT, 3", 725.04 | 149 FT | $35.23 | $35.23 | $37.00 | $35.23 |
| 625E25900 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 1,399 FT | $62.79 | $62.79 | $49.00 | $62.79 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 2 EACH | $450 | $450 | $415 | $450 |
| 625E26273 LUMINAIRE, LOW MAST, SOLID STATE (LED), AS PER PLA | 117 EACH | $961 | $961 | $885 | $961 |
| 625E27503 LUMINAIRE, UNDERPASS, SOLID STATE (LED), AS PER PL | 8 EACH | $577 | $577 | $1,175 | $577 |
| 625E29000 TRENCH | 21,969 FT | $9.10 | $9.10 | $6.00 | $9.10 |
| 625E29500 TRENCH IN PAVED AREA, TYPE A | 549 FT | $53.05 | $53.05 | $28.00 | $53.05 |
| 625E29900 JUNCTION BOX | 8 EACH | $608 | $608 | $850 | $608 |
| 625E30510 PULL BOX, 725.06, SIZE 4 | 4 EACH | $442 | $442 | $735 | $442 |
| 625E30700 PULL BOX, 725.08, 18" | 17 EACH | $718 | $718 | $985 | $718 |
| 625E31510 PULL BOX REMOVED | 20 EACH | $205 | $205 | $150 | $205 |
| 625E32000 GROUND ROD | 127 EACH | $224 | $224 | $225 | $224 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 2 EACH | $6,630 | $6,630 | $12,700 | $6,630 |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $12,204 | $12,204 | $6,600 | $12,204 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 21,969 FT | $0.38 | $0.38 | $1.00 | $0.38 |
| 625E37100 SERVICE TO UNDERPASS LIGHTING | 4 EACH | $1,601 | $1,601 | $1,250 | $1,601 |
| 625E38000 HIGH VOLTAGE TEST | 1 LS | $1,772 | $1,772 | $4,000 | $1,772 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $120,148 | $120,148 | $40,000 | $120,148 |
| 625E75350 LIGHT TOWER REMOVED | 12 EACH | $1,164 | $1,164 | $3,420 | $1,164 |
| 625E75400 LIGHT POLE REMOVED | 41 EACH | $194 | $194 | $350 | $194 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 41 EACH | $416 | $416 | $375 | $416 |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | $776 | $776 | $400 | $776 |
| 625E75520 LUMINAIRE SUPPORT REMOVED | 6 EACH | $194 | $194 | $350 | $194 |
| 625E75540 LIGHT TOWER FOUNDATION REMOVED | 12 EACH | $610 | $610 | $750 | $610 |
| 625E75801 DISCONNECT CIRCUIT, AS PER PLAN | 100 EACH | $205 | $205 | $150 | $205 |
| 625E10495 LIGHT POLE, LOW MAST, AS PER PLAN, ATLM50 | 3 EACH | $637 | $637 | $2,400 | $637 |
| 621E00100 RPM | 1,693 EACH | $23.25 | $23.70 | $23.70 | $23.70 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,524 EACH | $6.51 | $13.65 | $10.00 | $10.00 |
| 625E32000 GROUND ROD | 30 EACH | $224 | $224 | $225 | $224 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 8 EACH | $11.00 | $11.00 | $7.80 | $7.80 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 28 EACH | $10.00 | $10.00 | $7.80 | $7.80 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 27 EACH | $9.00 | $9.00 | $8.20 | $9.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE-WAY | 139 EACH | $8.50 | $8.50 | $8.20 | $8.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 1,419 FT | $9.75 | $9.75 | $11.00 | $9.75 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 99.9 FT | $14.75 | $14.75 | $23.00 | $14.75 |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 348.7 FT | $31.00 | $31.00 | $44.00 | $31.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 172.6 FT | $19.00 | $19.00 | $28.00 | $19.00 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 120 FT | $11.00 | $11.00 | $12.50 | $11.00 |
| 630E08600 SIGN POST REFLECTOR | 18 EACH | $62.50 | $62.50 | $40.00 | $62.50 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 14 EACH | $375 | $375 | $395 | $375 |
| 630E20800 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 8 | 2 EACH | $15,772 | $15,772 | $19,250 | $15,772 |
| 630E74500 OVERHEAD SIGN SUPPORT, MISC.: TYPE TC-12.31 DESIGN | 4 EACH | $25,272 | $25,272 | $28,975 | $25,272 |
| 630E74500 OVERHEAD SIGN SUPPORT, MISC.: TYPE TC-12.31 DESIGN | 2 EACH | $17,370 | $17,370 | $20,550 | $17,370 |
| 630E74500 OVERHEAD SIGN SUPPORT, MISC.: TYPE TC-15.116 DESIG | 6 EACH | $68,202 | $68,202 | $78,250 | $68,202 |
| 630E74500 OVERHEAD SIGN SUPPORT, MISC.: TYPE TC-15.116 DESIG | 1 EACH | $95,636 | $95,636 | $108,250 | $95,636 |
| 630E74500 OVERHEAD SIGN SUPPORT, MISC.: TYPE TC-16.22 DESIGN | 2 EACH | $16,950 | $16,950 | $19,250 | $16,950 |
| 630E74500 OVERHEAD SIGN SUPPORT, MISC.: TYPE TC-17.11 DESIGN | 1 EACH | $16,575 | $16,575 | $21,000 | $16,575 |
| 630E74500 OVERHEAD SIGN SUPPORT, MISC.: TYPE TC-17.11 DESIGN | 2 EACH | $12,200 | $12,200 | $17,250 | $12,200 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 14 EACH | $217 | $217 | $420 | $217 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 2 EACH | $130 | $130 | $145 | $130 |
| 630E80100 SIGN, FLAT SHEET | 1,202.7 SF | $14.00 | $14.00 | $16.00 | $14.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 549 SF | $22.25 | $22.25 | $20.00 | $22.25 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 3,429.5 SF | $21.00 | $21.00 | $21.00 | $21.00 |
| 630E81020 CONCRETE MEDIAN BARRIER SIGN BRACKET | 1 EACH | $850 | $850 | $940 | $850 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 28 EACH | $1,125 | $1,125 | $685 | $1,125 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 21 EACH | $6,200 | $6,200 | $6,150 | $6,200 |
| 630E84520 SPAN WIRE SIGN SUPPORT FOUNDATION | 6 EACH | $3,800 | $3,800 | $4,120 | $3,800 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 130 EACH | $15.00 | $15.00 | $10.00 | $15.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 6 EACH | $85.00 | $85.00 | $185 | $85.00 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 7 EACH | $575 | $575 | $420 | $575 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 112 EACH | $20.00 | $20.00 | $15.00 | $20.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 43 EACH | $125 | $125 | $220 | $125 |
| 630E86310 REMOVAL OF STRUCTURE MOUNTED SIGN AND DISPOSAL | 2 EACH | $350 | $350 | $235 | $350 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 1 EACH | $850 | $850 | $485 | $850 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 42 EACH | $375 | $375 | $225 | $375 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 4 EACH | $40.00 | $40.00 | $20.00 | $40.00 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 5 EACH | $2,153 | $2,251 | $1,250 | $850 |
| 630E89802 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 5 EACH | $3,605 | $2,401 | $1,950 | $1,000 |
| 630E89810 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 4 EACH | $2,003 | $2,101 | $1,180 | $700 |
| 630E89812 REMOVAL OF WOOD POLE AND DISPOSAL | 1 EACH | $325 | $325 | $320 | $325 |
| 631E94406 REMOVAL OF SIGNS WIRED | 1 EACH | $194 | $194 | $365 | $194 |
| 631E97700 SIGN LIGHTING MISC.: REMOVE AND REERECT ILLUMINATE | 2 EACH | $632 | $632 | $800 | $632 |
| 644E00100 EDGE LINE, 4" | 0.1 MILE | $4,830 | $4,830 | $4,830 | $4,830 |
| 644E00104 EDGE LINE, 6" | 0.41 MILE | $5,635 | $5,635 | $5,635 | $5,635 |
| 644E00200 LANE LINE, 4" | 0.71 MILE | $3,555 | $3,555 | $3,555 | $3,555 |
| 644E00300 CENTER LINE | 1 MILE | $6,395 | $6,395 | $6,395 | $6,395 |
| 644E00400 CHANNELIZING LINE, 8" | 6,531 FT | $1.15 | $1.15 | $1.15 | $1.15 |
| 644E00404 CHANNELIZING LINE, 12" | 1,162 FT | $1.25 | $1.25 | $1.25 | $1.25 |
| 644E00500 STOP LINE | 392 FT | $5.60 | $5.60 | $5.60 | $5.60 |
| 644E00600 CROSSWALK LINE | 630 FT | $4.95 | $4.95 | $4.95 | $4.95 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 735 FT | $5.45 | $5.45 | $5.45 | $5.45 |
| 644E00720 CHEVRON MARKING | 887 FT | $5.45 | $5.45 | $5.45 | $5.45 |
| 644E00900 ISLAND MARKING | 640 SF | $3.45 | $3.45 | $3.45 | $3.45 |
| 644E01120 SCHOOL SYMBOL MARKING, 120" | 2 EACH | $500 | $500 | $500 | $500 |
| 644E01300 LANE ARROW | 86 EACH | $100 | $100 | $100 | $100 |
| 644E01500 DOTTED LINE, 4" | 620 FT | $1.10 | $1.10 | $1.10 | $1.10 |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 3.72 MILE | $1,210 | $1,210 | $1,210 | $1,210 |
| 646E10400 STOP LINE | 169 FT | $11.00 | $11.00 | $11.00 | $11.00 |
| 646E10500 CROSSWALK LINE | 265 FT | $6.00 | $6.00 | $6.00 | $6.00 |
| 646E20300 LANE ARROW | 31 EACH | $215 | $215 | $215 | $215 |
| 646E20320 WRONG WAY ARROW | 4 EACH | $300 | $300 | $300 | $300 |
| 646E20502 DOTTED LINE, 4" | 276 FT | $2.00 | $2.00 | $2.00 | $2.00 |
| 630E84010 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 1 EACH | $6,400 | $6,400 | $12,500 | $12,659 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 15.1 MILE | $710 | $710 | $710 | $710 |
| 642E00204 LANE LINE, 6", TYPE 1 | 18.14 MILE | $360 | $360 | $360 | $360 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 20,866 FT | $0.65 | $0.65 | $0.65 | $0.65 |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 9,705 FT | $0.60 | $0.60 | $0.60 | $0.60 |
| 625E25400 CONDUIT, 2", 725.04 | 345 FT | $18.65 | $18.65 | $24.00 | $18.65 |
| 625E25408 CONDUIT, 2", 725.051 | 726 FT | $6.75 | $6.75 | $14.00 | $6.75 |
| 625E25500 CONDUIT, 3", 725.04 | 1,113 FT | $33.10 | $33.10 | $37.00 | $33.10 |
| 625E25504 CONDUIT, 3", 725.051 | 1,271 FT | $9.15 | $9.15 | $16.50 | $9.15 |
| 625E25750 CONDUIT, 4", MULTICELL, 725.20 , EPC-40 | 20,838 FT | $18.40 | $18.40 | $22.00 | $18.40 |
| 625E25752 CONDUIT, 4", MULTICELL, 725.20 , EPC-80 | 1,198 FT | $23.60 | $23.60 | $45.00 | $23.60 |
| 625E25901 CONDUIT, JACKED OR DRILLED, AS PER PLAN ,3" OR 4" | 1,341 FT | $53.98 | $53.98 | $50.00 | $53.95 |
| 625E29010 TRENCH, 30" DEEP | 12,921 FT | $3.17 | $3.17 | $8.00 | $3.17 |
| 625E30700 PULL BOX, 725.08, 18" | 10 EACH | $718 | $718 | $985 | $718 |
| 625E30710 PULL BOX, 725.08, 32" | 38 EACH | $1,766 | $1,766 | $3,100 | $1,766 |
| 625E31510 PULL BOX REMOVED | 6 EACH | $205 | $205 | $150 | $205 |
| 625E32000 GROUND ROD | 6 EACH | $224 | $224 | $225 | $224 |
| 625E32001 GROUND ROD, AS PER PLAN | 5 EACH | $224 | $224 | $225 | $224 |
| 625E34001 POWER SERVICE, AS PER PLAN | 6 EACH | $3,333 | $3,333 | $3,850 | $3,333 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 12,921 FT | $0.38 | $0.38 | $1.00 | $0.38 |
| 630E70021 OVERHEAD SIGN SUPPORT, DMS TRUSS, 115', AS PER PLA | 1 EACH | $82,966 | $82,966 | $96,750 | $82,966 |
| 630E70051 CATWALK, DMS TRUSS, AS PER PLAN | 1 EACH | $23,503 | $23,503 | $29,225 | $23,503 |
| 630E70080 OVERHEAD SIGN SUPPORT FOUNDATION, DMS TRUSS | 2 EACH | $15,500 | $15,500 | $9,250 | $15,500 |
| 632E04905 VEHICULAR SIGNAL HEAD, (LED), 2-SECTION, 12" LENS, | 8 EACH | $682 | $682 | $620 | $682 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $35.25 | $32.25 | $35.00 | $35.25 |
| 632E26500 DETECTOR LOOP | 8 EACH | $1,328 | $1,328 | $2,100 | $1,328 |
| 632E27004 LOOP DETECTOR UNIT | 8 EACH | $229 | $229 | $275 | $229 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 2,625 FT | $2.20 | $2.20 | $2.00 | $2.20 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $4,644 | $4,644 | $6,500 | $4,644 |
| 632E65300 LOOP DETECTOR LEAD-IN CABLE, 2 CONDUCTOR, NO. 14 A | 2,751 FT | $1.76 | $1.76 | $1.00 | $1.76 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 3,153 FT | $4.09 | $4.09 | $3.50 | $4.09 |
| 632E90300 SIGNALIZATION, MISC.: REMOVAL OF ITS EQUIPMENT | 1 LS | $6,978 | $6,978 | $10,000 | $6,978 |
| 632E90400 SIGNALIZATION, MISC.: RAMP METER SIGN | 2 EACH | $2,297 | $2,297 | $2,700 | $2,297 |
| 632E90400 SIGNALIZATION, MISC.: SIGNAL SUPPORT, MECHANICAL D | 2 EACH | $378 | $378 | $500 | $378 |
| 632E90400 SIGNALIZATION, MISC.: SIGNAL SUPPORT, TYPE TC-81.2 | 2 EACH | $12,181 | $12,181 | $11,900 | $12,181 |
| 633E67100 CABINET FOUNDATION | 4 EACH | $1,410 | $1,410 | $3,500 | $1,410 |
| 633E67200 CONTROLLER WORK PAD | 2 EACH | $304 | $304 | $2,500 | $304 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 3 EACH | $4,696 | $4,696 | $2,500 | $4,696 |
| 633E74000 UNINTERRUPTIBLE POWER SUPPLY (UPS) | 4 EACH | $5,506 | $5,506 | $5,150 | $5,506 |
| 804E15010 FIBER OPTIC CABLE, 24 FIBER | 13,358 FT | $2.35 | $2.35 | $3.50 | $2.35 |
| 804E34022 FIBER TERMINATION PANEL, 24 FIBER | 7 EACH | $2,762 | $2,762 | $2,450 | $2,762 |
| 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE | 1 EACH | $9,189 | $9,189 | $8,000 | $9,189 |
| 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET | 1 EACH | $52,011 | $52,011 | $46,000 | $52,011 |
| 809E63000 DYNAMIC MESSAGE SIGN (DMS), FULL-SIZE WALK-IN | 1 EACH | $72,758 | $72,758 | $70,650 | $72,758 |
| 809E65000 ITS CABINET - GROUND MOUNTED | 2 EACH | $9,802 | $9,802 | $9,995 | $9,802 |
| 809E65030 ITS CABINET - RAMP METER | 2 EACH | $22,342 | $22,342 | $22,350 | $22,342 |
| 809E65990 ITS DEVICE, MISC.: EX. CABINET WORK | 3 EACH | $608 | $608 | $850 | $608 |
| 809E67000 RAMP METER STATION | 2 EACH | $1,326 | $1,326 | $4,450 | $1,326 |
| 809E68900 SIDE-FIRED RADAR DETECTOR | 2 EACH | $8,256 | $8,256 | $8,560 | $8,256 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 4 EACH | $5,000 | $5,000 | $6,000 | $5,000 |
| 809E70000 MAINTAINING ITS DURING CONSTRUCTION | 1 LS | $63,372 | $63,372 | $14,000 | $63,372 |
| 611E00400 4" CONDUIT, TYPE E | 100 FT | $11.35 | $11.35 | $11.00 | $11.35 |
| 625E00450 CONNECTION, FUSED PULL APART | 2 EACH | $88.00 | $88.00 | $91.00 | $88.00 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 2 EACH | $88.00 | $88.00 | $100 | $88.00 |
| 625E18401 BRACKET ARM, 20', AS PER PLAN | 2 EACH | $1,099 | $1,099 | $1,200 | $1,099 |
| 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE | 646 FT | $2.45 | $2.45 | $2.00 | $2.45 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 420 FT | $1.70 | $1.70 | $1.50 | $1.70 |
| 625E25400 CONDUIT, 2", 725.04 | 272 FT | $22.00 | $22.00 | $24.00 | $22.00 |
| 625E25600 CONDUIT, 4", 725.04 | 187 FT | $45.95 | $45.95 | $53.00 | $45.95 |
| 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN (SHARONVILLE) | 2 EACH | $1,197 | $1,197 | $1,550 | $1,197 |
| 625E29000 TRENCH | 459 FT | $10.50 | $10.50 | $6.00 | $10.50 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $718 | $718 | $985 | $718 |
| 625E31506 PULL BOX REMOVED AND REPLACED | 3 EACH | $912 | $912 | $1,200 | $912 |
| 625E32001 GROUND ROD, AS PER PLAN | 8 EACH | $235 | $235 | $225 | $235 |
| 625E36000 PLASTIC CAUTION TAPE | 272 FT | $0.38 | $0.38 | $1.00 | $0.38 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 10 EACH | $828 | $828 | $710 | $828 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 4 EACH | $703 | $703 | $690 | $703 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,058 | $1,058 | $1,000 | $1,058 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 5 EACH | $550 | $550 | $585 | $550 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 16 EACH | $35.25 | $35.25 | $38.00 | $35.25 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 7 EACH | $18.75 | $18.75 | $30.00 | $18.75 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 3 EACH | $240 | $240 | $325 | $240 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 3 EACH | $1,328 | $1,328 | $2,100 | $1,328 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,975 FT | $2.20 | $2.20 | $2.00 | $2.20 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,546 FT | $2.50 | $2.50 | $2.85 | $2.50 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 3 EACH | $5,084 | $5,084 | $7,100 | $5,084 |
| 632E64020 PEDESTAL FOUNDATION | 5 EACH | $996 | $996 | $1,600 | $996 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 7 EACH | $608 | $608 | $1,400 | $608 |
| 632E80700 SIGNAL SUPPORT, MISC.:SIGNAL SUPPORT, MECHANICAL D | 3 EACH | $378 | $378 | $500 | $378 |
| 632E80700 SIGNAL SUPPORT, MISC.:SIGNAL SUPPORT, TYPE TC-81.2 | 1 EACH | $14,405 | $14,405 | $14,000 | $14,405 |
| 632E81700 COMBINATION SIGNAL SUPPORT, MISC.:COMBINATION SIGN | 2 EACH | $21,230 | $21,230 | $16,975 | $21,230 |
| 632E89900 PEDESTAL, 8', TRANSFORMER BASE | 4 EACH | $639 | $639 | $800 | $639 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 1 EACH | $686 | $686 | $885 | $686 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 3 EACH | $3,324 | $3,324 | $3,100 | $3,324 |
| 632E90200 REUSE OF VEHICULAR SIGNAL HEAD | 9 EACH | $390 | $390 | $300 | $390 |
| 632E90202 REUSE OF PEDESTRIAN SIGNAL HEAD | 2 EACH | $346 | $346 | $250 | $346 |
| 633E99300 CONTROLLER ITEM, MISC.: PREEMPTION REUSE / REINSTA | 1 LS | $1,251 | $1,251 | $3,900 | $1,251 |
| 804E30000 FAN-OUT KIT, 6 FIBER | 4 EACH | $119 | $119 | $275 | $119 |
| 804E32020 DROP CABLE, 6 FIBER | 4 FT | $663 | $663 | $495 | $663 |
| 804E34000 FIBER TERMINATION PANEL, 6 FIBER | 4 EACH | $1,601 | $1,601 | $1,530 | $1,601 |
| 804E36000 SLACK INSTALLATION | 4 EACH | $332 | $332 | $600 | $332 |
| 804E37001 SPLICE ENCLOSURE, AS PER PLAN | 4 EACH | $1,992 | $1,992 | $1,125 | $1,992 |
| 804E37700 FIBER OPTIC CABLE TESTING | 1 LS | $1,772 | $1,772 | $7,320 | $1,772 |
| 804E38000 FIBER OPTIC CABLE MODEM | 4 EACH | $3,798 | $3,798 | $750 | $3,798 |
| 804E98000 FIBER OPTIC CABLE, MISC.: FIBER OPTIC CABLE, ARMOR | 100 FT | $2.94 | $2.94 | $2.50 | $2.94 |
| 804E98000 FIBER OPTIC CABLE, MISC.: REROUTE EXISTING FIBER O | 1,686 FT | $3.30 | $3.30 | $6.00 | $3.30 |
| 809E69100 STOP LINE RADAR DETECTION | 6 EACH | $7,046 | $7,046 | $6,900 | $7,046 |
| 816E30001 VIDEO DETECTION SYSTEM, AS PER PLAN | 2 EACH | $1,161 | $1,161 | $3,600 | $1,160 |
| 824E00010 SYSTEM ANALYSIS | 1 LS | $22,776 | $22,776 | $21,000 | $22,776 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 100 CY | $59.34 | $127 | $80.00 | $120 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 3,000 HOUR | $55.00 | $87.84 | $85.00 | $90.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 11,680 FT | $2.50 | $1.65 | $2.30 | $0.32 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,900 | $1,861 | $2,770 | $2,500 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 20 EACH | $185 | $300 | $270 | $205 |
| 614E12500 REPLACEMENT SIGN | 20 EACH | $125 | $150 | $365 | $400 |
| 614E12600 REPLACEMENT DRUM | 100 EACH | $50.00 | $60.00 | $70.00 | $75.00 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 12,500 EACH | $20.85 | $11.00 | $26.50 | $25.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $308 | $556 | $300 | $300 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 4,933 EACH | $10.00 | $17.38 | $7.00 | $5.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, ONE-WAY | 50 EACH | $11.00 | $23.14 | $10.00 | $12.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 4,983 EACH | $13.00 | $11.28 | $12.00 | $15.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: MAINTENANCE OF MAJOR G | 13 EACH | $3,650 | $3,650 | $6,100 | $3,650 |
| 614E18002 MAINTAINING TRAFFIC, MISC.:TEMPORARY TRAFFIC SIGNA | 1 LS | $27,900 | $27,900 | $42,000 | $45,620 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 60 SNMT | $700 | $650 | $1,200 | $650 |
| 614E20011 WORK ZONE LANE LINE, CLASS I, 6", AS PER PLAN | 7.75 MILE | $700 | $700 | $700 | $700 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 3.34 MILE | $230 | $230 | $230 | $230 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 40.37 MILE | $270 | $270 | $270 | $270 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.71 MILE | $530 | $1,230 | $530 | $1,230 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 17 MILE | $570 | $1,270 | $570 | $1,270 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 3.5 MILE | $790 | $790 | $790 | $790 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1 MILE | $1,090 | $1,790 | $1,090 | $1,790 |
| 614E22011 WORK ZONE EDGE LINE, CLASS I, 6", AS PER PLAN | 22.06 MILE | $1,545 | $1,545 | $1,545 | $1,545 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 3.14 MILE | $455 | $455 | $455 | $455 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 74.27 MILE | $605 | $605 | $605 | $605 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.1 MILE | $755 | $1,455 | $755 | $1,455 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 12.74 MILE | $905 | $1,605 | $905 | $1,605 |
| 614E23011 WORK ZONE CHANNELIZING LINE, CLASS I, 12", AS PER | 60,114 FT | $1.10 | $1.10 | $1.10 | $1.10 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 17,324 FT | $0.40 | $0.40 | $0.40 | $0.40 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 192,392 FT | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 6,531 FT | $0.40 | $1.02 | $0.40 | $1.02 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 18,756 FT | $0.50 | $1.12 | $0.50 | $1.12 |
| 614E24001 WORK ZONE DOTTED LINE, CLASS I, AS PER PLAN | 15,842 FT | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 4", 642 PAINT | 3,467 FT | $0.30 | $0.30 | $0.30 | $0.30 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 52,706 FT | $0.35 | $0.35 | $0.35 | $0.35 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT | 620 FT | $0.30 | $0.92 | $0.30 | $0.92 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 9,705 FT | $0.35 | $0.97 | $0.35 | $0.97 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 1,388 FT | $2.50 | $2.50 | $2.50 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 392 FT | $2.50 | $2.50 | $2.50 | $2.50 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 1,071 FT | $2.00 | $2.00 | $2.00 | $2.00 |
| 614E28200 WORK ZONE GORE MARKING, CLASS II, 642 PAINT | 1,112 FT | $0.40 | $0.40 | $0.40 | $0.40 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 240 EACH | $55.00 | $55.00 | $55.00 | $55.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 86 EACH | $55.00 | $55.00 | $55.00 | $55.00 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 2 EACH | $220 | $276 | $600 | $500 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $397,616 | $521,867 | $670,000 | $400,000 |
| 616E10000 WATER | 2,550 MGAL | $2.05 | $37.32 | $60.00 | $65.00 |
| 622E41050 PORTABLE BARRIER, "Y" CONNECTOR | 6 EACH | $3,500 | $1,528 | $1,800 | $1,200 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 1,528 FT | $18.00 | $15.73 | $40.00 | $30.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 162 SNMT | $816 | $350 | $350 | $481 |
| 203E20000 EMBANKMENT | 298 CY | $17.01 | $9.00 | $8.00 | $7.00 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 1,025 CY | $53.46 | $65.00 | $55.00 | $60.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 518 SY | $30.96 | $20.00 | $20.00 | $20.00 |
| 601E37501 PAVED GUTTER, TYPE 1-2, AS PER PLAN | 117 FT | $34.61 | $60.00 | $100 | $58.00 |
| 840E20000 MECHANICALLY STABILIZED EARTH WALL | 5,225 SF | $49.81 | $35.00 | $47.00 | $35.00 |
| 840E21000 WALL EXCAVATION | 3,782 CY | $16.99 | $16.00 | $10.00 | $24.00 |
| 840E22000 FOUNDATION PREPARATION | 861 SY | $20.46 | $35.00 | $25.00 | $21.00 |
| 840E23000 SELECT GRANULAR BACKFILL | 3,804 CY | $40.61 | $37.00 | $38.00 | $60.00 |
| 840E23050 NATURAL SOIL | 162 CY | $26.49 | $9.00 | $35.00 | $11.00 |
| 840E25010 6" DRAINAGE PIPE, PERFORATED | 777 FT | $2.53 | $14.00 | $8.00 | $7.00 |
| 840E25020 6" DRAINAGE PIPE, NON-PERFORATED | 73 FT | $25.12 | $12.00 | $12.00 | $12.00 |
| 840E26000 CONCRETE COPING | 376 FT | $213 | $155 | $200 | $200 |
| 840E26050 AESTHETIC SURFACE TREATMENT | 5,225 SF | $1.37 | $1.00 | $1.00 | $1.00 |
| 840E27000 ON-SITE ASSISTANCE | 5 DAY | $0.13 | $450 | $500 | $250 |
| 867E00100 TEMPORARY WIRE FACED MECHANICALLY STABILIZED EARTH | 1 LS | $91,738 | $185,000 | $80,000 | $110,000 |
| 203E20000 EMBANKMENT | 369 CY | $16.03 | $9.00 | $8.00 | $7.00 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 1,058 CY | $53.45 | $65.00 | $55.00 | $60.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 528 SY | $30.96 | $20.00 | $20.00 | $20.00 |
| 601E37501 PAVED GUTTER, TYPE 1-2, AS PER PLAN | 116 FT | $34.80 | $60.00 | $100 | $58.00 |
| 840E20000 MECHANICALLY STABILIZED EARTH WALL | 5,487 SF | $49.70 | $35.00 | $47.00 | $35.00 |
| 840E21000 WALL EXCAVATION | 3,974 CY | $17.09 | $16.00 | $10.00 | $24.00 |
| 840E22000 FOUNDATION PREPARATION | 891 SY | $19.81 | $35.00 | $25.00 | $21.00 |
| 840E23000 SELECT GRANULAR BACKFILL | 4,018 CY | $40.53 | $37.00 | $38.00 | $60.00 |
| 840E23050 NATURAL SOIL | 182 CY | $26.95 | $9.00 | $35.00 | $11.00 |
| 840E25010 6" DRAINAGE PIPE, PERFORATED | 769 FT | $2.49 | $14.00 | $8.00 | $7.00 |
| 840E25020 6" DRAINAGE PIPE, NON-PERFORATED | 56 FT | $29.33 | $12.00 | $12.00 | $12.00 |
| 840E26000 CONCRETE COPING | 380 FT | $200 | $155 | $200 | $200 |
| 840E26050 AESTHETIC SURFACE TREATMENT | 5,487 SF | $1.37 | $1.00 | $1.00 | $1.00 |
| 840E27000 ON-SITE ASSISTANCE | 5 DAY | $0.13 | $450 | $500 | $250 |
| 867E00100 TEMPORARY WIRE FACED MECHANICALLY STABILIZED EARTH | 1 LS | $97,912 | $185,000 | $80,000 | $110,000 |
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 28 FT | $326 | $600 | $750 | $338 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 368 LB | $1.70 | $1.15 | $2.50 | $2.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 16 EACH | $13.14 | $22.00 | $75.00 | $24.50 |
| 511E53014 CLASS QC3 CONCRETE, MISC.:QC3 CONCRETE, SUPERSTRUC | 3 CY | $1,882 | $3,100 | $7,000 | $3,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 30 SY | $30.96 | $20.00 | $20.00 | $20.00 |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $141,441 | $135,000 | $200,000 | $120,000 |
| 202E22900 APPROACH SLAB REMOVED | 288 SY | $34.55 | $35.00 | $50.00 | $20.00 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 4 EACH | $1,207 | $1,250 | $1,500 | $550 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $152,943 | $175,000 | $160,000 | $190,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $17,485 | $25,000 | $20,000 | $15,000 |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 4,860 FT | $33.53 | $6.00 | $28.00 | $24.00 |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 5,220 FT | $62.41 | $75.00 | $58.00 | $69.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 135,169 LB | $1.15 | $1.15 | $1.15 | $1.70 |
| 509E30040 NO. 6 GFRP DEFORMED BARS | 648 FT | $2.11 | $2.75 | $4.00 | $5.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $1,911 | $3,250 | $5,000 | $3,500 |
| 511E34462 CLASS QC SCC CONCRETE WITH QC/QA, BRIDGE DECK (PAR | 78 CY | $1,098 | $1,000 | $1,400 | $2,000 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 252 CY | $472 | $475 | $450 | $600 |
| 511E53014 CLASS QC3 CONCRETE, MISC.: WITH QC/QA, BRIDGE DECK | 546 CY | $687 | $825 | $875 | $1,060 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,222 SY | $30.96 | $20.50 | $20.50 | $20.50 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 61 SY | $30.00 | $25.00 | $25.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 12 SY | $16.42 | $110 | $110 | $60.00 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 21 EACH | $1,983 | $1,750 | $2,500 | $2,300 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 163 SF | $3.84 | $6.00 | $10.00 | $6.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 84 SF | $5.70 | $12.00 | $10.00 | $9.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 203 FT | $36.52 | $30.00 | $40.00 | $32.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $2,661 | $2,500 | $2,500 | $2,700 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 130 CY | $78.26 | $100 | $125 | $89.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 253 FT | $2.39 | $9.00 | $6.00 | $10.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 78 FT | $10.35 | $12.00 | $15.00 | $15.00 |
| 523E20000 DYNAMIC LOAD TESTING | 4 EACH | $4,297 | $2,500 | $6,000 | $3,000 |
| 523E20500 RESTRIKE | 4 EACH | $672 | $1,500 | $6,000 | $1,800 |
| 526E30000 REINFORCED CONCRETE APPROACH SLABS (T=17") | 558 SY | $296 | $275 | $270 | $400 |
| 526E90010 TYPE A INSTALLATION | 164 FT | $108 | $165 | $195 | $250 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 9 SY | $108 | $75.00 | $195 | $115 |
| 625E25604 CONDUIT, 4", 725.051 | 467 FT | $11.30 | $11.30 | $22.00 | $11.30 |
| 625E29921 STRUCTURE JUNCTION BOX, AS PER PLAN | 2 EACH | $2,096 | $2,096 | $1,400 | $2,096 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $718 | $718 | $985 | $718 |
| 690E98400 SPECIAL - TEMPORARY SURCHARGE | 1 LS | $207,278 | $75,139 | $90,000 | $145,000 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 68 CF | $450 | $451 | $450 | $450 |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $137,470 | $135,000 | $195,000 | $120,000 |
| 202E22900 APPROACH SLAB REMOVED | 288 SY | $20.77 | $35.00 | $50.00 | $20.00 |
| 203E65000 SPECIAL - SETTLEMENT PLATFORM | 4 EACH | $1,073 | $1,250 | $1,500 | $500 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $152,943 | $175,000 | $170,000 | $190,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $17,485 | $25,000 | $20,000 | $15,000 |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 4,680 FT | $33.91 | $6.00 | $28.00 | $24.00 |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 5,040 FT | $62.53 | $75.00 | $58.00 | $69.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 135,203 LB | $1.15 | $1.15 | $1.15 | $1.70 |
| 509E30040 NO. 6 GFRP DEFORMED BARS | 648 FT | $2.11 | $2.75 | $4.00 | $5.00 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $1,911 | $3,250 | $5,000 | $3,600 |
| 511E34462 CLASS QC SCC CONCRETE WITH QC/QA, BRIDGE DECK (PAR | 78 CY | $1,058 | $1,000 | $1,400 | $1,930 |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 252 CY | $463 | $475 | $450 | $600 |
| 511E53014 CLASS QC3 CONCRETE, MISC.: WITH QC/QA, BRIDGE DECK | 546 CY | $687 | $825 | $875 | $1,100 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,222 SY | $30.96 | $20.00 | $20.00 | $20.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 61 SY | $30.00 | $25.00 | $25.00 | $21.00 |
| 512E33000 TYPE 2 WATERPROOFING | 13 SY | $16.42 | $110 | $110 | $60.00 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 21 EACH | $1,983 | $1,750 | $2,500 | $2,300 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 163 SF | $3.84 | $6.00 | $10.00 | $6.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 85 SF | $5.68 | $12.00 | $10.00 | $9.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 203 FT | $36.52 | $30.00 | $40.00 | $32.00 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 16 EACH | $2,661 | $2,500 | $2,500 | $2,700 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 131 CY | $78.05 | $100 | $125 | $89.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 252 FT | $2.39 | $9.00 | $6.00 | $10.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 51 FT | $10.52 | $12.00 | $15.00 | $18.00 |
| 523E20000 DYNAMIC LOAD TESTING | 4 EACH | $4,297 | $2,500 | $6,000 | $3,000 |
| 523E20500 RESTRIKE | 4 EACH | $672 | $1,500 | $6,000 | $1,900 |
| 526E30000 REINFORCED CONCRETE APPROACH SLABS (T=17") | 558 SY | $285 | $275 | $270 | $400 |
| 526E90010 TYPE A INSTALLATION | 164 FT | $108 | $165 | $195 | $250 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 9 SY | $108 | $75.00 | $195 | $118 |
| 625E25604 CONDUIT, 4", 725.051 | 467 FT | $11.30 | $11.30 | $22.00 | $11.30 |
| 625E29921 STRUCTURE JUNCTION BOX, AS PER PLAN | 2 EACH | $2,096 | $2,096 | $1,400 | $2,096 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $718 | $718 | $985 | $718 |
| 690E98400 SPECIAL - TEMPORARY SURCHARGE | 1 LS | $228,066 | $75,639 | $90,000 | $145,000 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 68 CF | $450 | $451 | $450 | $450 |
| 202E35200 PIPE REMOVED, OVER 24" | 48 FT | $57.02 | $218 | $275 | $750 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $24,233 | $86,714 | $90,000 | $70,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $13,081 | $34,020 | $70,000 | $20,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 10,553 LB | $1.13 | $0.98 | $1.25 | $1.40 |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 113 CY | $732 | $1,042 | $870 | $860 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 120 SY | $30.96 | $20.00 | $20.00 | $20.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $1,743 | $17,105 | $10,000 | $5,500 |
| 601E11000 RIPRAP, TYPE D | 75 SY | $109 | $408 | $100 | $265 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 106 CY | $116 | $132 | $100 | $150 |
| 611E30000 96" CONDUIT, TYPE A, 706.02 | 48 FT | $905 | $1,536 | $750 | $1,600 |
| 843E50001 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 40 SF | $152 | $115 | $115 | $44.00 |
| 614E18030 MAINTAINING TRAFFIC, MISC.: RUMBLE STRIPS, SHOULDE | 14,000 FT | $5.50 | $7.60 | $8.00 | $0.55 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $204,031 | $244,155 | $293,000 | $225,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $11,535 | $25,000 | $50,000 | $15,000 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 36 MNTH | $1,520 | $5,020 | $3,500 | $6,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $231,000 | $275,509 | $300,000 | $280,000 |
| 623E11000 PROVIDING ELECTRONIC INSTRUMENTATION | 1 LS | $48,188 | $29,146 | $30,000 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 50,032 CY | $122.5 | $6.13M | 13% |
| 304E20000 AGGREGATE BASE | 44,490 CY | $54.08 | $2.41M | 5% |
| 452E16050 13.5" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1 | 21,778 SY | $104.44 | $2.27M | 5% |
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9,946 CY | $190 | $1.89M | 4% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 38,914 SY | $45.5 | $1.77M | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 105,800 FT | $15.1 | $1.60M | 3% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 8,212 CY | $165 | $1.35M | 3% |
| 203E10000 EXCAVATION | 114,258 CY | $11.45 | $1.31M | 3% |
| 832E30000 EROSION CONTROL | 1,248,307 EACH | $1 | $1.25M | 3% |
| 206E10500 CEMENT | 5,759 TON | $166 | $956k | 2% |