GEA-SR 608-07.53
GEA County · est $0.9M
Bid dateThursday, January 28—
GEA County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Kokosing Construction Company INC | R3Chagrin Valley Paving INC | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 2,078 CY | $140 | $155 | $147 | $155 | 48% |
| 253E02000 PAVEMENT REPAIR | 900 CY | $143 | $156 | $159 | $160 | 21% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 49,873 SY | $0.80 | $0.50 | $0.87 | $0.82 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $25,500 | $20,000 | $25,000 | $32,500 |
| Item | Quantity | R1Ronyak Paving INC | R2Kokosing Construction Company INC | R3Chagrin Valley Paving INC | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 209E60501 LINEAR GRADING, AS PER PLAN | 6.32 MILE | $185 | $1,500 | $500 | $850 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $650 | $540 | $750 | $650 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 3.16 MILE | $500 | $2,750 | $500 | $4,275 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,000 SY | $23.00 | $47.00 | $32.00 | $28.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,193 | $17,650 | $66,280 | $42,000 | 3% |
| 621E00100 RPM | 629 EACH | $24.25 | $24.25 | $24.25 | $24.25 | 2% |
| 646E10010 EDGE LINE, 6" | 6.26 MILE | $1,475 | $1,475 | $1,475 | $1,475 | 2% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $1,250 | $500 | $1,750 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 4,239 GAL | $1.75 | $1.91 | $2.00 | $2.00 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 102.87 CY | $65.00 | $157 | $90.00 | $70.00 | 1% |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $20.00 | $20.00 | $20.00 | $20.00 | 1% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 3.13 MILE | $1,900 | $1,900 | $2,800 | $2,000 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $65.00 | $60.00 | $75.00 | $65.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,950 | $3,000 | $6,000 | $10,000 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 6.26 MILE | $760 | $650 | $760 | $650 | 1% |
| 646E10200 CENTER LINE | 3.13 MILE | $1,495 | $1,495 | $1,495 | $1,495 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 6.26 MILE | $550 | $550 | $550 | $550 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 3.13 MILE | $785 | $985 | $785 | $985 | 0% |
| 632E26500 DETECTOR LOOP | 2 EACH | $1,100 | $1,200 | $1,200 | $1,200 | 0% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 472 EACH | $0.25 | $5.00 | $1.00 | $1.00 |
| 646E10400 STOP LINE | 75 FT | $10.50 | $10.50 | $10.50 | $10.50 |
| 646E10500 CROSSWALK LINE | 140 FT | $7.00 | $7.00 | $7.00 | $7.00 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $1,555 | $1,555 | $1,555 | $1,555 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 50 CY | $10.00 | $100 | $50.00 | $221 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 2 SNMT | $900 | $900 | $900 | $900 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.13 MILE | $575 | $775 | $575 | $775 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 75 FT | $2.50 | $3.50 | $2.50 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 75 FT | $2.40 | $3.50 | $2.40 | $3.50 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 140 FT | $2.10 | $3.25 | $2.10 | $3.25 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 140 FT | $2.00 | $3.25 | $2.00 | $3.25 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,682 | $4,539 | $500 | $500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 2,078 CY | $140 | $291k | 46% |
| 253E02000 PAVEMENT REPAIR | 900 CY | $143 | $129k | 21% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 49,873 SY | $0.8 | $40k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $25,500 | $26k | 4% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,000 SY | $23 | $23k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,193 | $16k | 3% |
| 621E00100 RPM | 629 EACH | $24.25 | $15k | 2% |
| 646E10010 EDGE LINE, 6" | 6.26 MILE | $1,475 | $9k | 1% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $9k | 1% |
| 407E20000 NON-TRACKING TACK COAT | 4,239 GAL | $1.75 | $7k | 1% |