POR-Tallmadge Rd (CR 18)
POR County · est $5.8M
Bid dateThursday, February 11—
POR County · est $5.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 254 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Karvo Companies INC | R3Kenmore Construction CO INC | R4Central-allied Enterprises INC | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 452E15020 12" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 7,175 SY | $75.00 | $82.00 | $88.00 | $82.00 | $144 | 16% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 3,824 CY | $112 | $110 | $135 | $135 | $116 | 13% |
| 442E20251 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 2,634 CY | $143 | $140 | $165 | $140 | $157 | 11% |
| 441E10101 |
| Item | Quantity | R1Shelly & Sands INC | R2Karvo Companies INC | R3Kenmore Construction CO INC | R4Central-allied Enterprises INC | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,700 | $28,000 | $25,000 | $55,000 | $27,369 |
| 202E20010 HEADWALL REMOVED | 18 EACH | $150 | $150 | $300 | $500 | $410 |
| 202E30600 CONCRETE MEDIAN REMOVED | 308 SY | $7.00 | $22.75 | $20.00 | $20.00 | $13.75 |
| 202E32000 CURB REMOVED | 525 FT | $1.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,305 CY |
| $178 |
| $156 |
| $195 |
| $150 |
| $162 |
| 7% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 3,913 CY | $55.00 | $55.00 | $58.00 | $56.00 | $63.75 | 6% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 3,053 SY | $54.00 | $48.00 | $58.00 | $86.00 | $64.75 | 5% |
| 832E30000 EROSION CONTROL | 160,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 203E10000 EXCAVATION | 15,850 CY | $10.00 | $9.00 | $18.00 | $19.00 | $18.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $125,000 | $335,000 | $200,000 | $270,000 | $200,000 | 4% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 11,590 FT | $9.50 | $9.00 | $11.00 | $9.75 | $12.25 | 3% |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 2,245 CY | $45.00 | $38.00 | $58.00 | $43.50 | $62.75 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $100,000 | $262,300 | $150,000 | $238,000 | $325,500 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 762 CY | $129 | $108 | $145 | $106 | $125 | 3% |
| 202E23000 PAVEMENT REMOVED | 13,983 SY | $7.00 | $9.00 | $15.00 | $16.00 | $19.00 | 3% |
| 611E97400 CONDUIT, MISC.:12' X 4.5' CONDUIT, TYPE A, 706.05, | 97 FT | $1,000 | $870 | $897 | $1,000 | $1,191 | 3% |
| 619E16020 FIELD OFFICE, TYPE C | 27 MNTH | $3,000 | $2,000 | $2,000 | $1,625 | $2,050 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 300 CY | $220 | $75.00 | $120 | $375 | $271 | 2% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 3 EACH | $20,000 | $20,000 | $55,000 | $45,000 | $24,281 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $60,000 | $50,000 | $40,000 | $65,000 | $135,000 | 2% |
| 304E20000 AGGREGATE BASE | 862 CY | $67.00 | $50.00 | $58.00 | $56.00 | $69.00 | 2% |
| $3.75 |
| $3.00 |
| $15.00 |
| $4.25 |
| 202E32500 CURB AND GUTTER REMOVED | 1,483 FT | $1.50 | $4.00 | $3.00 | $9.00 | $4.75 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 670 FT | $16.00 | $13.25 | $20.00 | $20.00 | $30.50 |
| 202E35200 PIPE REMOVED, OVER 24" | 25 FT | $40.00 | $70.00 | $20.00 | $26.00 | $30.50 |
| 202E38000 GUARDRAIL REMOVED | 1,112 FT | $2.00 | $2.00 | $2.00 | $1.50 | $1.50 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $120 | $500 | $200 | $500 | $374 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 12" | 168 FT | $6.00 | $13.00 | $8.00 | $24.00 | $24.50 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 15" | 61 FT | $8.00 | $16.00 | $8.00 | $44.00 | $58.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 21" | 110 FT | $12.00 | $22.00 | $10.00 | $48.00 | $58.00 |
| 202E75000 FENCE REMOVED | 2,101 FT | $2.00 | $1.50 | $2.00 | $3.00 | $3.00 |
| 203E20000 EMBANKMENT | 11,055 CY | $5.00 | $6.25 | $15.00 | $8.00 | $8.25 |
| 203E98000 ROADWAY, MISC.:57 AGGREGATE | 46 CY | $50.00 | $50.00 | $75.00 | $75.00 | $116 |
| 204E10000 SUBGRADE COMPACTION | 25,875 SY | $2.00 | $0.90 | $2.00 | $1.50 | $1.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 2,149 CY | $13.00 | $14.00 | $16.00 | $13.00 | $24.75 |
| 204E20001 EMBANKMENT, AS PER PLAN | 1,808 CY | $20.00 | $4.50 | $18.00 | $12.00 | $16.25 |
| 204E45000 PROOF ROLLING | 12 HOUR | $200 | $170 | $150 | $150 | $869 |
| 204E50000 GEOTEXTILE FABRIC | 3,880 SY | $1.00 | $0.90 | $2.00 | $1.55 | $1.75 |
| 204E51000 GEOGRID | 292 SY | $1.00 | $6.75 | $3.00 | $3.55 | $11.00 |
| 209E60200 LINEAR GRADING | 26 STA | $150 | $250 | $210 | $190 | $1,073 |
| 606E15050 GUARDRAIL, TYPE MGS | 2,024 FT | $19.00 | $17.40 | $17.00 | $15.90 | $16.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 356 FT | $19.00 | $18.80 | $18.80 | $17.25 | $17.50 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 88 FT | $21.00 | $23.60 | $24.00 | $24.50 | $24.75 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $1,850 | $1,920 | $1,920 | $2,225 | $2,247 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 4 EACH | $2,412 | $2,380 | $2,380 | $2,650 | $2,677 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 11 EACH | $950 | $975 | $975 | $985 | $995 |
| 607E23000 FENCE, TYPE CLT | 2,335 FT | $24.00 | $17.80 | $16.00 | $17.05 | $17.25 |
| 607E70000 FENCELINE SEEDING AND MULCHING | 2,335 FT | $1.50 | $1.00 | $1.00 | $2.05 | $1.25 |
| 623E38500 MONUMENT ASSEMBLY | 1 EACH | $900 | $900 | $950 | $1,340 | $1,282 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 6 EACH | $1,430 | $600 | $850 | $1,100 | $682 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 7 EACH | $132 | $160 | $200 | $275 | $163 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 4 EACH | $210 | $235 | $300 | $430 | $224 |
| 690E98000 SPECIAL - VERTICAL CLEARANCE | 1 EACH | $530 | $1,000 | $3,000 | $1,500 | $10,332 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 42 SY | $105 | $100 | $150 | $84.00 | $70.50 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 9 CY | $120 | $200 | $250 | $175 | $121 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 1 CY | $365 | $415 | $500 | $300 | $195 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $300 | $100 | $150 | $109 |
| 659E00300 TOPSOIL | 232 CY | $39.00 | $50.00 | $25.00 | $37.75 | $40.50 |
| 659E10000 SEEDING AND MULCHING | 30,218 SY | $0.75 | $0.85 | $0.75 | $0.50 | $0.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,511 SY | $0.70 | $1.00 | $2.00 | $0.40 | $0.50 |
| 659E15000 INTER-SEEDING | 1,511 SY | $0.70 | $0.05 | $2.00 | $0.40 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 4.22 TON | $680 | $600 | $150 | $595 | $638 |
| 659E31000 LIME | 6.25 ACRE | $162 | $0.11 | $75.00 | $87.00 | $93.25 |
| 659E35000 WATER | 167 MGAL | $1.00 | $0.01 | $1.00 | $5.00 | $5.25 |
| 670E00500 SLOPE EROSION PROTECTION | 555 SY | $1.50 | $2.50 | $2.50 | $2.25 | $2.50 |
| 670E00700 DITCH EROSION PROTECTION | 2,542 SY | $1.40 | $2.50 | $2.00 | $2.25 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,300 | $5,000 | $3,000 | $3,500 | $3,030 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $17,980 | $20,000 | $25,000 | $14,000 | $15,756 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $19,740 | $20,000 | $20,000 | $23,000 | $18,852 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 84 SY | $5.00 | $0.01 | $5.00 | $7.50 | $8.00 |
| 602E20000 CONCRETE MASONRY | 3.9 CY | $1,900 | $830 | $2,000 | $1,950 | $2,136 |
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 1.1 CY | $1,900 | $2,000 | $2,000 | $1,850 | $2,009 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 3,007 FT | $14.50 | $11.00 | $13.00 | $13.50 | $15.75 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 1,966 FT | $14.00 | $11.00 | $10.00 | $17.30 | $12.75 |
| 605E31100 AGGREGATE DRAINS | 178 FT | $14.50 | $8.25 | $10.00 | $25.00 | $14.25 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 418 FT | $16.00 | $10.00 | $15.00 | $17.65 | $12.00 |
| 611E00900 6" CONDUIT, TYPE B | 270 FT | $23.00 | $10.00 | $50.00 | $18.60 | $46.00 |
| 611E01500 6" CONDUIT, TYPE F | 40 FT | $23.00 | $12.00 | $10.00 | $13.00 | $20.25 |
| 611E04400 12" CONDUIT, TYPE B | 232 FT | $69.00 | $80.00 | $59.00 | $77.50 | $85.50 |
| 611E04600 12" CONDUIT, TYPE C | 74 FT | $69.00 | $75.00 | $55.00 | $41.50 | $65.00 |
| 611E04900 12" CONDUIT, TYPE D | 144 FT | $60.00 | $82.00 | $65.00 | $85.00 | $56.25 |
| 611E05700 15" CONDUIT, TYPE A | 215 FT | $85.00 | $92.00 | $100 | $119 | $73.50 |
| 611E05700 15" CONDUIT, TYPE A, 706.02 (CLASS V) | 64 FT | $85.00 | $100 | $84.00 | $148 | $102 |
| 611E05900 15" CONDUIT, TYPE B | 541 FT | $65.00 | $85.00 | $80.00 | $69.50 | $80.25 |
| 611E06100 15" CONDUIT, TYPE C | 231 FT | $59.00 | $75.00 | $75.00 | $53.50 | $62.50 |
| 611E07200 18" CONDUIT, TYPE A, 706.02 | 173 FT | $85.00 | $105 | $92.00 | $115 | $87.00 |
| 611E08700 21" CONDUIT, TYPE A, 706.02 (CLASS V) | 128 FT | $103 | $115 | $115 | $176 | $113 |
| 611E52200 14" X 23" CONDUIT, TYPE A, 706.04(CLASS HE-IV) | 172 FT | $125 | $175 | $160 | $164 | $146 |
| 611E98150 CATCH BASIN, NO. 3 | 6 EACH | $3,600 | $4,000 | $3,000 | $4,260 | $3,914 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $3,050 | $3,300 | $2,600 | $2,925 | $3,292 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 3 EACH | $3,150 | $3,350 | $2,700 | $2,925 | $3,324 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $3,300 | $3,200 | $2,400 | $4,490 | $3,182 |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $4,180 | $4,000 | $3,300 | $3,525 | $5,861 |
| 611E98470 CATCH BASIN, NO. 2-2B | 4 EACH | $1,940 | $2,875 | $1,500 | $2,125 | $2,895 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,600 | $3,500 | $3,100 | $3,450 | $5,193 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 21 EACH | $200 | $180 | $200 | $300 | $319 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $1.00 | $1.25 | $2.00 | $1.75 | $2.25 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,025 SY | $40.00 | $22.00 | $28.00 | $30.00 | $30.25 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE ,0.5" MIN / 5.5 | 20,789 SY | $2.00 | $0.80 | $3.50 | $2.50 | $2.25 |
| 407E13900 TACK COAT, 702.13 | 1,554 GAL | $3.00 | $2.50 | $3.00 | $3.15 | $3.50 |
| 407E20000 NON-TRACKING TACK COAT | 4,371 GAL | $3.00 | $2.25 | $3.00 | $2.75 | $3.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 287 GAL | $3.00 | $4.25 | $3.00 | $7.50 | $4.00 |
| 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 113 CY | $190 | $200 | $250 | $230 | $192 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $350 | $300 | $275 | $260 | $303 |
| 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (66 CY | $300 | $275 | $225 | $220 | $248 |
| 441E50700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (76 CY | $250 | $250 | $300 | $320 | $202 |
| 442E20250 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 188 CY | $137 | $150 | $175 | $190 | $162 |
| 609E24000 CURB, TYPE 4-A | 423 FT | $37.00 | $15.00 | $7.00 | $15.00 | $36.25 |
| 609E26000 CURB, TYPE 6 | 3,083 FT | $15.00 | $14.00 | $19.00 | $19.50 | $33.00 |
| 609E70000 4" CONCRETE MEDIAN | 638 SY | $38.00 | $35.00 | $42.00 | $40.50 | $10.50 |
| 609E72000 CONCRETE MEDIAN | 364 SY | $75.00 | $70.00 | $50.00 | $66.50 | $112 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 41 CY | $145 | $115 | $100 | $120 | $99.50 |
| 617E20000 SHOULDER PREPARATION | 716 SY | $1.00 | $5.00 | $2.00 | $1.00 | $3.25 |
| 617E25000 WATER | 2 MGAL | $900 | $5.00 | $1.00 | $1.00 | $58.25 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 0.17 MILE | $16,930 | $16,000 | $16,000 | $16,000 | $16,160 |
| 618E40700 RUMBLE STRIPS, SHOULDER (CONCRETE) | 0.16 MILE | $16,930 | $16,000 | $16,000 | $16,000 | $16,160 |
| 638E02400 12" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, PU | 30 FT | $358 | $285 | $346 | $335 | $496 |
| 638E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE | 4 EACH | $4,600 | $500 | $2,800 | $1,500 | $2,417 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 2 EACH | $2,200 | $500 | $1,300 | $870 | $1,033 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 10 EACH | $1,400 | $500 | $350 | $525 | $556 |
| 638E98000 WATER WORK, MISC.:DRY SUMP REMOVED | 1 EACH | $366 | $125 | $500 | $525 | $904 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $750 | $1,200 | $350 | $530 | $423 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $1,866 | $1,200 | $950 | $1,890 | $1,409 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 4 EACH | $1,177 | $1,250 | $2,400 | $1,230 | $1,601 |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 2 EACH | $1,866 | $1,250 | $2,600 | $2,030 | $1,465 |
| 621E00100 RPM | 104 EACH | $35.00 | $88.35 | $55.00 | $55.00 | $55.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 46 EACH | $11.00 | $2.50 | $4.00 | $15.00 | $10.25 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, BI-DIRECTIONAL | 34 EACH | $9.00 | $8.80 | $7.00 | $15.00 | $9.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, ONE WAY | 7 EACH | $9.00 | $8.80 | $7.00 | $15.00 | $9.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 456.5 FT | $13.00 | $9.60 | $9.00 | $10.00 | $9.75 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 444.6 FT | $13.00 | $11.00 | $11.00 | $10.00 | $11.25 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 207.1 FT | $13.00 | $20.00 | $20.00 | $17.00 | $20.50 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 137.1 FT | $14.00 | $23.00 | $23.00 | $18.00 | $23.50 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 64.1 FT | $26.00 | $39.00 | $39.00 | $28.00 | $39.75 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 93.2 FT | $18.00 | $27.00 | $27.00 | $21.00 | $27.50 |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 106.3 FT | $40.00 | $53.00 | $53.00 | $45.00 | $54.25 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 87.8 FT | $15.00 | $12.50 | $13.00 | $12.00 | $12.75 |
| 630E08600 SIGN POST REFLECTOR | 50 EACH | $40.00 | $40.00 | $40.00 | $45.00 | $41.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 35 EACH | $370 | $320 | $320 | $325 | $327 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 9 EACH | $529 | $365 | $365 | $385 | $373 |
| 630E80100 SIGN, FLAT SHEET | 746.8 SF | $15.00 | $12.50 | $12.00 | $14.00 | $12.75 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 933.5 SF | $19.00 | $16.00 | $16.00 | $22.00 | $16.25 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 29 EACH | $685 | $650 | $620 | $850 | $665 |
| 630E84501 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, | 4 EACH | $1,320 | $1,130 | $1,100 | $1,050 | $1,155 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 101 EACH | $20.00 | $10.00 | $10.00 | $20.00 | $10.25 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $89.00 | $61.00 | $61.00 | $75.00 | $62.25 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 6 EACH | $196 | $95.00 | $95.00 | $75.00 | $97.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 75 EACH | $20.00 | $12.00 | $12.00 | $30.00 | $12.25 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 27 EACH | $342 | $165 | $165 | $150 | $169 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 1 EACH | $342 | $195 | $195 | $100 | $199 |
| 644E00104 EDGE LINE, 6" | 1.95 MILE | $4,325 | $4,085 | $3,000 | $3,200 | $4,126 |
| 644E00204 LANE LINE, 6" | 1.06 MILE | $2,300 | $2,165 | $1,400 | $1,400 | $2,187 |
| 644E00300 CENTER LINE | 0.92 MILE | $5,075 | $4,795 | $4,000 | $4,200 | $4,843 |
| 644E00404 CHANNELIZING LINE, 12" | 3,503 FT | $1.50 | $1.50 | $1.75 | $1.75 | $1.50 |
| 644E00500 STOP LINE | 354 FT | $6.00 | $5.75 | $6.00 | $6.00 | $5.75 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 766 FT | $6.00 | $5.65 | $5.00 | $5.75 | $5.75 |
| 644E00720 CHEVRON MARKING | 313 FT | $3.80 | $5.65 | $5.00 | $5.75 | $5.75 |
| 644E00900 ISLAND MARKING | 351 SF | $3.80 | $3.60 | $3.50 | $3.50 | $3.75 |
| 644E01300 LANE ARROW | 48 EACH | $80.00 | $75.00 | $90.00 | $95.00 | $75.75 |
| 644E01510 DOTTED LINE, 6" | 2,096 FT | $1.50 | $1.45 | $3.00 | $3.00 | $1.50 |
| 646E10010 EDGE LINE, 6" | 1.94 MILE | $4,170 | $3,940 | $3,000 | $3,400 | $3,980 |
| 646E10110 LANE LINE, 6" | 0.48 MILE | $3,165 | $2,990 | $1,800 | $1,800 | $3,020 |
| 646E10310 CHANNELIZING LINE, 12" | 1,148 FT | $2.65 | $2.50 | $2.25 | $2.25 | $2.50 |
| 646E10400 STOP LINE | 106 FT | $13.00 | $12.50 | $10.00 | $12.00 | $12.75 |
| 646E20300 LANE ARROW | 9 EACH | $265 | $250 | $150 | $165 | $253 |
| 646E20320 WRONG WAY ARROW | 3 EACH | $318 | $300 | $220 | $235 | $303 |
| 646E20504 DOTTED LINE, 6" | 885 FT | $2.40 | $2.25 | $3.00 | $3.00 | $2.25 |
| 646E20800 YIELD LINE | 14 FT | $22.00 | $20.00 | $18.00 | $18.00 | $20.25 |
| 611E00400 4" CONDUIT, TYPE E | 220 FT | $4.20 | $4.00 | $3.00 | $3.75 | $3.00 |
| 625E25400 CONDUIT, 2", 725.04 | 92 FT | $19.00 | $18.00 | $20.00 | $15.00 | $28.00 |
| 625E25500 CONDUIT, 3", 725.04 | 223 FT | $29.00 | $28.00 | $30.00 | $24.00 | $38.25 |
| 625E25600 CONDUIT, 4", 725.04 | 323 FT | $37.00 | $35.00 | $35.00 | $33.00 | $44.25 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 500 FT | $65.00 | $65.00 | $50.00 | $68.00 | $58.50 |
| 625E29000 TRENCH | 608 FT | $10.00 | $10.00 | $20.00 | $7.00 | $8.25 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $1,058 | $1,000 | $900 | $570 | $933 |
| 625E30706 PULL BOX, 725.08, 24" | 8 EACH | $1,269 | $1,200 | $1,100 | $785 | $1,134 |
| 625E32000 GROUND ROD | 14 EACH | $210 | $200 | $150 | $150 | $163 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 608 FT | $0.25 | $0.25 | $0.40 | $0.25 | $0.50 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, MOGADORE RD. NOR | 1 EACH | $529 | $500 | $1,958 | $1,850 | $1,978 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, TALLMADGE RD. / | 1 EACH | $529 | $500 | $1,958 | $1,850 | $1,978 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, TALLMADGE RD. / | 1 EACH | $529 | $500 | $1,958 | $1,850 | $1,978 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 22 EACH | $870 | $825 | $800 | $785 | $820 |
| 632E05065 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS, | 1 EACH | $1,050 | $1,000 | $1,000 | $775 | $1,051 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 5 EACH | $1,320 | $1,250 | $1,200 | $1,225 | $1,330 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 28 EACH | $40.00 | $38.00 | $15.00 | $35.00 | $20.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,847 FT | $3.00 | $3.00 | $3.25 | $3.50 | $3.50 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,343 FT | $4.00 | $4.00 | $4.75 | $3.20 | $5.00 |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 8 EACH | $5,290 | $5,000 | $3,000 | $4,355 | $3,133 |
| 632E64020 PEDESTAL FOUNDATION | 3 EACH | $846 | $800 | $1,200 | $475 | $1,267 |
| 632E70001 POWER SERVICE, AS PER PLAN | 3 EACH | $2,645 | $2,500 | $2,500 | $4,170 | $2,731 |
| 632E75400 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 8 POLE, WITH | 1 EACH | $17,985 | $17,000 | $18,500 | $14,750 | $19,251 |
| 632E80103 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 1, AS PER PL | 1 EACH | $5,554 | $5,250 | $6,300 | $4,570 | $6,498 |
| 632E80603 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 12, AS PER P | 1 EACH | $12,168 | $11,500 | $11,400 | $8,610 | $12,039 |
| 632E80621 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 13, AS PER P | 3 EACH | $13,755 | $13,000 | $13,000 | $11,415 | $14,136 |
| 632E80629 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 14, AS PER P | 2 EACH | $12,697 | $12,000 | $14,800 | $12,700 | $15,716 |
| 632E90010 PEDESTAL, MISC.: PEDESTAL, 16', TRANSFORMER BASE | 3 EACH | $2,645 | $2,500 | $1,000 | $1,295 | $1,101 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 2 EACH | $2,645 | $2,500 | $3,500 | $4,125 | $3,967 |
| 632E90400 SIGNALIZATION, MISC.:SIGNAL SUPPORT, MECHANICAL DA | 3 EACH | $1,058 | $1,000 | $450 | $600 | $469 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 3 EACH | $11,111 | $10,500 | $11,000 | $10,800 | $11,364 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 3 EACH | $2,645 | $2,500 | $2,000 | $1,195 | $2,170 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 3 EACH | $529 | $500 | $550 | $245 | $562 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 3 EACH | $2,645 | $2,500 | $1,800 | $1,770 | $1,976 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 3 EACH | $6,348 | $6,000 | $5,000 | $5,400 | $5,416 |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 6 EACH | $7,400 | $7,000 | $7,000 | $7,500 | $7,390 |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 6 EACH | $7,100 | $6,750 | $6,300 | $7,125 | $6,882 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 3 EACH | $4,500 | $4,250 | $4,000 | $4,480 | $4,341 |
| 251E01030 PARTIAL DEPTH PAVEMENT REPAIR (442) | 50 CY | $695 | $450 | $500 | $640 | $404 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 30 CY | $130 | $75.00 | $30.00 | $95.00 | $56.75 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 103 CY | $63.00 | $135 | $30.00 | $120 | $87.75 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $75.00 | $65.00 | $70.00 | $85.00 | $65.75 |
| 614E11630 INCREASED BARRIER DELINEATION | 388 FT | $4.00 | $6.50 | $5.00 | $2.50 | $20.50 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,100 | $1,820 | $2,000 | $2,500 | $1,838 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,900 | $1,830 | $2,000 | $2,500 | $1,848 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,972 | $8,000 | $15,000 | $20,000 | $4,747 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 133 EACH | $9.25 | $8.75 | $45.00 | $50.00 | $59.75 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 197 EACH | $102 | $95.50 | $40.00 | $50.00 | $59.75 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 30 EACH | $4.25 | $20.00 | $12.00 | $25.00 | $9.25 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 104 EACH | $6.45 | $20.00 | $10.00 | $8.00 | $9.25 |
| 614E13350 OBJECT MARKER, ONE WAY | 104 EACH | $12.00 | $22.50 | $12.00 | $18.50 | $9.25 |
| 614E13360 OBJECT MARKER, TWO WAY | 30 EACH | $16.00 | $25.00 | $16.00 | $18.00 | $9.25 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 60 SNMT | $850 | $500 | $750 | $500 | $1,061 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.78 MILE | $2,150 | $2,015 | $500 | $500 | $2,035 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 0.14 MILE | $2,175 | $2,055 | $600 | $600 | $2,076 |
| 614E20360 WORK ZONE LANE LINE, CLASS I, 4", 648 | 0.12 MILE | $13,110 | $12,390 | $1,800 | $1,800 | $12,514 |
| 614E20366 WORK ZONE LANE LINE, CLASS I, 6", 648 | 0.48 MILE | $13,195 | $12,470 | $2,100 | $2,100 | $12,595 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.92 MILE | $2,725 | $2,575 | $1,800 | $1,800 | $2,601 |
| 614E21360 WORK ZONE CENTER LINE, CLASS I, 648 | 0.93 MILE | $14,235 | $13,455 | $6,300 | $6,300 | $13,590 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 3.95 MILE | $2,370 | $2,240 | $800 | $800 | $2,263 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 2.7 MILE | $2,530 | $2,390 | $900 | $900 | $2,414 |
| 614E22330 WORK ZONE EDGE LINE, CLASS I, 4", 648 | 1.59 MILE | $13,605 | $12,860 | $3,200 | $3,200 | $12,989 |
| 614E22336 WORK ZONE EDGE LINE, CLASS I, 6", 648 | 1.67 MILE | $13,940 | $13,170 | $3,600 | $3,600 | $13,302 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 2,187 FT | $0.60 | $0.55 | $0.95 | $0.95 | $0.50 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 3,539 FT | $0.80 | $0.75 | $1.25 | $1.25 | $0.75 |
| 614E23140 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 648 | 1,589 FT | $2.40 | $2.25 | $1.50 | $1.50 | $2.25 |
| 614E23150 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 648 | 684 FT | $2.60 | $2.50 | $2.00 | $2.00 | $2.50 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 3,124 FT | $0.55 | $0.50 | $2.00 | $2.00 | $0.50 |
| 614E24140 WORK ZONE DOTTED LINE, CLASS I, 4", 648 | 1,173 FT | $2.15 | $2.00 | $3.00 | $3.00 | $2.00 |
| 614E24142 WORK ZONE DOTTED LINE, CLASS I, 6", 648 | 528 FT | $2.25 | $2.10 | $4.00 | $4.00 | $2.00 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 615 FT | $2.40 | $2.25 | $2.00 | $2.00 | $2.25 |
| 614E25120 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 648 | 372 FT | $25.00 | $22.85 | $6.00 | $6.00 | $23.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 461 FT | $2.65 | $2.50 | $3.00 | $3.00 | $2.50 |
| 614E26120 WORK ZONE STOP LINE, CLASS I, 648 | 253 FT | $26.85 | $25.40 | $6.00 | $6.00 | $25.75 |
| 614E30000 WORK ZONE ARROW, CLASS I | 26 EACH | $59.00 | $55.00 | $50.00 | $50.00 | $55.50 |
| 614E30120 WORK ZONE ARROW, CLASS I, 648 | 25 EACH | $265 | $250 | $95.00 | $95.00 | $253 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I | 66 SF | $2.10 | $2.00 | $2.00 | $2.00 | $2.00 |
| 614E32730 WORK ZONE ISLAND MARKING, CLASS I, 648 | 16 SF | $22.00 | $20.80 | $4.00 | $4.00 | $21.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $36,000 | $48,000 | $48,000 | $80,000 | $81,094 |
| 616E10000 WATER | 170 MGAL | $31.00 | $1.00 | $10.00 | $3.00 | $27.25 |
| 622E41050 PORTABLE BARRIER, "Y" CONNECTOR | 1 EACH | $500 | $5,500 | $5,500 | $2,500 | $1,030 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 5,700 FT | $6.50 | $14.00 | $15.00 | $21.00 | $30.25 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 100 TON | $79.00 | $125 | $120 | $33.00 | $141 |
| 690E65022 SPECIAL - WORK INVOLVING NON-REGULATED WATER | 50 GAL | $25.00 | $5.00 | $10.00 | $14.00 | $8.50 |
| 690E65024 SPECIAL - WORK INVOLVING REGULATED WATER | 50 GAL | $25.00 | $7.50 | $10.00 | $21.00 | $28.50 |
| 690E70100 SPECIAL - ASBESTOS ABATEMENT, 10% CHRYSOTILE ASBES | 94 SF | $50.00 | $25.00 | $35.00 | $10.00 | $67.75 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $20,000 | $45,000 | $20,000 | $41,000 | $15,767 |
| 202E22900 APPROACH SLAB REMOVED | 163 SY | $19.00 | $47.00 | $35.00 | $47.00 | $78.00 |
| 203E35140 GRANULAR MATERIAL, TYPE E | 85 CY | $103 | $85.00 | $65.00 | $85.00 | $63.00 |
| 203E57150 SPECIAL - FOUNDATION EXCAVATION | 85 CY | $50.00 | $40.00 | $37.00 | $40.00 | $49.25 |
| 204E50000 GEOTEXTILE FABRIC | 148 SY | $0.60 | $2.00 | $5.00 | $2.00 | $2.25 |
| 204E51000 GEOGRID | 169 SY | $0.60 | $4.00 | $5.00 | $4.00 | $2.25 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $22,000 | $43,000 | $75,000 | $55,000 | $9,750 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $11,000 | $55,000 | $10,000 | $65,000 | $2,994 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,331 LB | $1.50 | $3.00 | $2.00 | $3.00 | $2.75 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 9 CY | $3,400 | $750 | $1,800 | $750 | $4,044 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 29 CY | $650 | $400 | $1,100 | $400 | $1,459 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $840 | $850 | $2,300 | $850 | $4,270 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 60 SY | $37.00 | $30.00 | $25.00 | $30.00 | $28.25 |
| 512E33000 TYPE 2 WATERPROOFING | 309 SY | $26.50 | $35.00 | $25.00 | $35.00 | $15.50 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 32 SF | $7.00 | $4.00 | $15.00 | $36.00 | $10.25 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 9 CY | $260 | $100 | $100 | $100 | $149 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 27 CY | $160 | $120 | $150 | $120 | $103 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $32,000 | $40,000 | $50,000 | $105,000 | $98,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 452E15020 12" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 7,175 SY | $75 | $538k | 9% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 3,824 CY | $112 | $428k | 8% |
| 442E20251 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 2,634 CY | $143 | $377k | 7% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,305 CY | $178 | $232k | 4% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 3,913 CY | $55 | $215k | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 3,053 SY | $54 | $165k | 3% |
| 832E30000 EROSION CONTROL | 160,000 EACH | $1 | $160k | 3% |
| 203E10000 EXCAVATION | 15,850 CY | $10 | $159k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $125,000 | $125k | 2% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 11,590 FT | $9.5 | $110k | 2% |