LOR-SR 58-24.66
LOR County · est $1.5M
Bid dateThursday, March 11—
LOR County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 75 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Erie Blacktop INC | R3Chagrin Valley Paving INC | R4Kokosing Construction Company INC | R5Shelly Company | R6Ronyak Paving INC | R7Cross-roads Asphalt Recycling INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3,964 CY | $144 | $147 | $125 | $148 | $130 | $150 | $160 | 52% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $85,000 | $42,000 | $150,000 | $81,000 | $129,000 | $68,897 | $153,500 | 8% |
| 254E01000 |
| Item | Quantity | R1Karvo Companies INC | R2Erie Blacktop INC | R3Chagrin Valley Paving INC | R4Kokosing Construction Company INC | R5Shelly Company | R6Ronyak Paving INC | R7Cross-roads Asphalt Recycling INC |
|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 24 SY | $75.00 | $28.35 | $40.00 | $18.00 | $27.00 | $40.00 | $40.00 |
| 202E30000 WALK REMOVED | 2,361 SF | $5.00 | $3.05 | $1.50 | $2.00 | $2.90 | $1.50 | $1.50 |
| 202E32000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 94,293 SY |
| $0.90 |
| $1.05 |
| $1.00 |
| $1.00 |
| $1.50 |
| $1.25 |
| $2.10 |
| 8% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 205 CY | $250 | $550 | $290 | $640 | $360 | $280 | $350 | 5% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 230 CY | $185 | $210 | $215 | $270 | $220 | $260 | $275 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $35,084 | $40,000 | $56,350 | $40,000 | $40,000 | $60,000 | $40,000 | 3% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 26 EACH | $950 | $890 | $850 | $850 | $850 | $850 | $950 | 2% |
| 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 172 SY | $138 | $161 | $175 | $125 | $154 | $139 | $139 | 2% |
| 608E52000 CURB RAMP | 2,588 SF | $9.00 | $10.00 | $25.00 | $10.00 | $9.50 | $16.25 | $16.75 | 2% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 20 EACH | $900 | $630 | $900 | $600 | $835 | $700 | $700 | 2% |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 7 EACH | $2,425 | $735 | $1,250 | $1,900 | $1,340 | $1,550 | $1,550 | 2% |
| 256E10000 BONDED PATCHING OF PORTLAND CEMENT CONCRETE PAVEME | 688 SF | $22.00 | $36.75 | $30.00 | $20.00 | $35.00 | $61.75 | $61.75 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $5,000 | $10,000 | $5,500 | $5,000 | $11,720 | $15,000 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 7,597 GAL | $1.90 | $1.90 | $2.00 | $2.00 | $2.50 | $2.00 | $4.00 | 1% |
| 646E10000 EDGE LINE, 4" | 0.12 MILE | $110,000 | $8,925 | $8,500 | $8,500 | $20,000 | $8,500 | $31,600 | 1% |
| 646E10000 EDGE LINE, 4" (BIKE LANE) | 0.12 MILE | $110,000 | $8,925 | $8,500 | $8,500 | $20,000 | $8,500 | $31,600 | 1% |
| 646E10100 LANE LINE, 4" | 0.12 MILE | $110,000 | $6,825 | $6,500 | $6,500 | $20,000 | $6,500 | $31,000 | 1% |
| 617E10100 COMPACTED AGGREGATE | 296 CY | $42.00 | $60.00 | $50.00 | $35.00 | $50.00 | $50.00 | $80.00 | 1% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 38 SY | $320 | $192 | $295 | $125 | $183 | $139 | $139 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $3,000 | $1,900 | $1,500 | $1,200 | $2,500 | $1,500 | $2,000 | 1% |
| 238 FT |
| $8.50 |
| $8.03 |
| $10.00 |
| $10.00 |
| $7.65 |
| $10.00 |
| $10.00 |
| 202E38000 GUARDRAIL REMOVED | 218.75 FT | $2.00 | $2.10 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 31.25 FT | $2.60 | $2.70 | $2.60 | $2.60 | $2.60 | $2.60 | $2.60 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $135 | $141 | $135 | $135 | $135 | $135 | $135 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 5 EACH | $95.00 | $100 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 6 EACH | $40.00 | $42.00 | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 1 EACH | $95.00 | $100 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 44 CY | $62.50 | $65.00 | $62.50 | $62.50 | $62.50 | $62.50 | $62.50 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 5.06 STA | $50.00 | $52.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 209E60501 LINEAR GRADING, AS PER PLAN | 3.64 MILE | $1,425 | $1,700 | $250 | $2,000 | $2,400 | $705 | $1,500 |
| 209E80000 GRADING MAILBOX APPROACHES | 47 EACH | $62.59 | $80.00 | $10.00 | $15.00 | $93.15 | $5.96 | $125 |
| 606E13000 GUARDRAIL, TYPE 5 | 218.75 FT | $19.40 | $19.50 | $19.40 | $18.60 | $18.60 | $18.60 | $18.60 |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 31.25 FT | $14.40 | $13.00 | $14.40 | $12.40 | $12.40 | $12.40 | $12.40 |
| 606E17000 RAISING TYPE 5 GUARDRAIL | 50 FT | $7.80 | $8.20 | $7.80 | $7.80 | $7.80 | $7.80 | $7.80 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 2 EACH | $2,160 | $2,225 | $2,160 | $2,120 | $2,120 | $2,120 | $2,120 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 3 EACH | $770 | $810 | $770 | $770 | $770 | $770 | $770 |
| 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 1 EACH | $1,040 | $1,095 | $1,040 | $1,040 | $1,040 | $1,040 | $1,040 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 6 EACH | $870 | $860 | $870 | $820 | $820 | $820 | $820 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 2 EACH | $1,080 | $1,135 | $1,080 | $1,080 | $1,080 | $1,080 | $1,080 |
| 608E10000 4" CONCRETE WALK | 455 SF | $5.00 | $10.00 | $6.00 | $5.00 | $9.50 | $7.50 | $7.50 |
| 609E14000 CURB, TYPE 2-A | 45 FT | $13.25 | $12.60 | $45.00 | $25.00 | $12.00 | $45.00 | $45.00 |
| 609E16000 CURB, TYPE 2-B | 19 FT | $14.75 | $17.85 | $55.00 | $25.00 | $17.00 | $45.00 | $45.00 |
| 609E20000 CURB, TYPE 3-A | 27 FT | $12.00 | $12.60 | $45.00 | $25.00 | $12.00 | $45.00 | $45.00 |
| 609E26000 CURB, TYPE 6 | 189 FT | $13.75 | $16.80 | $40.00 | $25.00 | $16.00 | $32.00 | $32.00 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 1 EACH | $500 | $700 | $1,000 | $650 | $450 | $600 | $600 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 3 EACH | $135 | $140 | $135 | $135 | $135 | $135 | $135 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $265 | $275 | $265 | $265 | $265 | $265 | $265 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 9 EACH | $950 | $525 | $900 | $600 | $765 | $700 | $700 |
| 611E99150 INLET ADJUSTED TO GRADE | 7 EACH | $1,200 | $630 | $900 | $600 | $1,125 | $860 | $860 |
| 611E99155 INLET RECONSTRUCTED TO GRADE, AS PER PLAN | 3 EACH | $2,275 | $735 | $1,250 | $1,900 | $1,820 | $1,550 | $1,550 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $1.50 | $2.60 | $1.50 | $1.00 | $2.25 | $1.50 | $1.50 |
| 253E02000 PAVEMENT REPAIR (LONGITUDINAL) | 25 CY | $225 | $210 | $230 | $300 | $640 | $250 | $600 |
| 253E02000 PAVEMENT REPAIR (TRANSVERSE) | 20 CY | $250 | $550 | $325 | $900 | $700 | $285 | $600 |
| 254E01600 PATCHING PLANED SURFACE | 488 SY | $1.00 | $8.00 | $5.00 | $1.25 | $1.50 | $1.00 | $6.50 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 1,092 FT | $2.25 | $2.85 | $3.00 | $3.00 | $2.70 | $2.00 | $2.00 |
| 257E10000 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 753 SY | $8.00 | $10.90 | $8.00 | $15.40 | $10.10 | $15.50 | $122 |
| 617E20000 SHOULDER PREPARATION | 4,271 SY | $0.65 | $0.40 | $0.25 | $0.35 | $0.40 | $1.00 | $1.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 11 EACH | $500 | $600 | $650 | $550 | $225 | $550 | $550 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (1WAY) | 19 EACH | $8.00 | $8.40 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $115 | $120 | $100 | $50.00 | $115 | $150 | $115 |
| 646E10200 CENTER LINE | 0.06 MILE | $110,000 | $19,000 | $18,000 | $18,000 | $25,000 | $18,000 | $38,000 |
| AA1 642E00100 EDGE LINE, 4", TYPE 1 (ALTERNATE 1) | 3.68 MILE | $525 | $550 | $525 | $525 | $525 | $650 | $525 |
| AA1 642E00100 EDGE LINE, 4", TYPE 1 (BIKE LANE) (ALTERNATE 1) | 5.09 MILE | $525 | $550 | $525 | $525 | $525 | $650 | $525 |
| AA1 642E00200 LANE LINE, 4", TYPE 1 (ALTERNATE 1) | 3.76 MILE | $450 | $470 | $450 | $450 | $450 | $550 | $450 |
| AA1 642E00300 CENTER LINE, TYPE 1 (ALTERNATE 1) | 3.25 MILE | $895 | $940 | $895 | $895 | $895 | $950 | $895 |
| AA1 642E00400 CHANNELIZING LINE, 8", TYPE 1 (ALTERNATE 1) | 1,730 FT | $0.50 | $0.52 | $0.50 | $0.50 | $0.50 | $0.95 | $0.50 |
| AA1 642E00500 STOP LINE, TYPE 1 (ALTERNATE 1) | 1,027 FT | $3.00 | $3.15 | $3.00 | $3.00 | $3.00 | $3.25 | $3.00 |
| AA1 642E00600 CROSSWALK LINE, TYPE 1 (ALTERNATE 1) | 2,156 FT | $2.00 | $2.10 | $2.00 | $2.00 | $2.00 | $2.25 | $2.00 |
| AA1 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 (ALTERNATE 1) | 999 FT | $3.00 | $3.15 | $3.00 | $3.00 | $3.00 | $2.50 | $3.00 |
| AA1 642E00900 ISLAND MARKING, TYPE 1 (ALTERNATE 1) | 156 SF | $3.00 | $3.15 | $3.00 | $3.00 | $3.00 | $2.00 | $3.00 |
| AA1 642E01000 RAILROAD SYMBOL MARKING, TYPE 1 (ALTERNATE 1) | 2 EACH | $300 | $315 | $300 | $300 | $300 | $350 | $300 |
| AA1 642E01300 LANE ARROW, TYPE 1 (ALTERNATE 1) | 72 EACH | $45.00 | $47.25 | $45.00 | $45.00 | $45.00 | $55.00 | $45.00 |
| AA1 642E01312 LANE REDUCTION ARROW, TYPE 1 (ALTERNATE 1) | 2 EACH | $100 | $105 | $100 | $100 | $100 | $185 | $100 |
| AA1 642E01500 DOTTED LINE, 4", TYPE 1 (ALTERNATE 1) | 1,046 FT | $0.50 | $0.52 | $0.50 | $0.50 | $0.50 | $2.00 | $0.50 |
| AA1 642E01602 BIKE LANE SYMBOL MARKING, TYPE 1 (ALTERNATE 1) | 51 EACH | $65.00 | $68.00 | $65.00 | $65.00 | $65.00 | $145 | $65.00 |
| AA1 642E19000 SHARED LANE MARKING, TYPE 1 (ALTERNATE 1) | 11 EACH | $65.00 | $68.00 | $65.00 | $65.00 | $65.00 | $185 | $65.00 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $2,975 | $4,725 | $4,500 | $4,500 | $4,500 | $4,500 | $2,975 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $65.00 | $68.00 | $70.00 | $55.00 | $75.00 | $65.00 | $65.00 |
| 614E12460 WORK ZONE MARKING SIGN | 134 EACH | $55.00 | $58.00 | $55.00 | $55.00 | $55.00 | $55.00 | $55.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $100 | $250 | $100 | $100 | $195 | $125 | $300 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 7.84 MILE | $500 | $525 | $500 | $400 | $500 | $500 | $500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.94 MILE | $795 | $835 | $795 | $600 | $795 | $1,100 | $795 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 8.32 MILE | $395 | $415 | $395 | $300 | $395 | $750 | $395 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 3,460 FT | $0.50 | $0.52 | $0.50 | $0.40 | $0.50 | $0.95 | $0.50 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 1,998 FT | $2.75 | $2.90 | $2.75 | $1.75 | $2.75 | $2.50 | $2.75 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 2,054 FT | $3.00 | $3.15 | $3.00 | $2.00 | $3.00 | $3.50 | $3.00 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 4,312 FT | $2.25 | $2.35 | $2.25 | $2.00 | $2.25 | $2.25 | $2.25 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 136 EACH | $40.00 | $42.00 | $40.00 | $30.00 | $40.00 | $50.00 | $40.00 |
| 517E76300 RAILING, MISC.: DEEP BEAM RAILING PANELS | 175 FT | $14.40 | $15.00 | $14.40 | $14.40 | $14.40 | $14.40 | $14.40 |
| 517E76300 RAILING, MISC.: DEEP BEAM RAILING PANELS | 137.5 FT | $14.40 | $15.00 | $14.40 | $14.40 | $14.40 | $14.40 | $14.40 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $4,000 | $2,500 | $5,000 | $2,500 | $2,500 | $5,000 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $3,000 | $50.00 | $1,450 | $3,000 | $3,711 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3,964 CY | $144 | $571k | 43% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $85,000 | $85k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 94,293 SY | $0.9 | $85k | 6% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 205 CY | $250 | $51k | 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 230 CY | $185 | $43k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $35,084 | $35k | 3% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 26 EACH | $950 | $25k | 2% |
| 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 172 SY | $138 | $24k | 2% |
| 608E52000 CURB RAMP | 2,588 SF | $9 | $23k | 2% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 20 EACH | $900 | $18k | 1% |