GEA-SR 44-08.88
GEA County · est $1.6M
Bid dateThursday, March 11—
GEA County · est $1.6M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Chagrin Valley Paving INC | R3Kokosing Construction Company INC | R4Karvo Companies INC | R5Shelly Company | R6Perk Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 2,829 CY | $132 | $140 | $143 | $144 | $140 | $135 | 31% |
| 253E02000 PAVEMENT REPAIR | 2,000 CY | $115 | $122 | $125 | $123 | $115 | $135 | 19% |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1873 CY | $110 | $125 | $122 |
| Item | Quantity | R1Ronyak Paving INC | R2Chagrin Valley Paving INC | R3Kokosing Construction Company INC | R4Karvo Companies INC | R5Shelly Company | R6Perk Company INC |
|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 2,050 FT | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 203E40000 BORROW | 32 CY | $62.50 | $62.50 | $62.50 | $62.50 | $62.50 | $62.00 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 20.4 STA | $130 | $130 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $134 |
| $110 |
| $115 |
| 17% |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $350 | $150 | $125 | $178 | $325 | $230 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $57,100 | $95,000 | $76,428 | $54,900 | $72,000 | $50,000 | 5% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 70,739 SY | $0.70 | $0.75 | $0.65 | $0.70 | $1.15 | $1.50 | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 490.2 CY | $52.00 | $45.00 | $40.00 | $40.00 | $50.00 | $40.00 | 2% |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (87 CY | $270 | $150 | $267 | $178 | $260 | $240 | 2% |
| 646E10010 EDGE LINE, 6" | 8.28 MILE | $2,600 | $2,600 | $2,600 | $2,600 | $2,600 | $2,500 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 10,454 GAL | $1.85 | $2.00 | $1.87 | $2.10 | $2.50 | $2.00 | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 887.5 FT | $19.60 | $19.60 | $19.60 | $19.60 | $19.60 | $19.60 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (MASH 2016) | 7 EACH | $2,420 | $2,460 | $2,420 | $2,460 | $2,420 | $2,420 | 1% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 51 CY | $319 | $150 | $300 | $208 | $290 | $275 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 16.8 MILE | $899 | $899 | $700 | $899 | $899 | $800 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 700 FT | $18.40 | $18.80 | $18.40 | $18.80 | $18.40 | $18.40 | 1% |
| 646E10200 CENTER LINE | 4.2 MILE | $2,795 | $2,795 | $2,795 | $2,795 | $2,795 | $4,800 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 16.56 MILE | $698 | $698 | $650 | $698 | $698 | $575 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $11,288 | $35,700 | $40,000 | $36,000 | $40,000 | $40,000 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 5,462 LB | $2.00 | $2.00 | $0.58 | $0.68 | $1.55 | $1.90 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,251 | $9,700 | $7,000 | $5,000 | $4,000 | $19,000 | 1% |
| $130 |
| $130 |
| $130 |
| $130 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 396 STA | $1.00 | $5.00 | $12.00 | $22.00 | $38.00 | $30.00 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 7.51 MILE | $245 | $250 | $650 | $650 | $1,500 | $1,500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 6 EACH | $975 | $975 | $975 | $975 | $975 | $925 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $550 | $500 | $800 | $430 | $700 | $450 |
| 623E39600 MONUMENT BOX RECONSTRUCTED TO GRADE | 1 EACH | $700 | $1,000 | $1,100 | $500 | $800 | $1,000 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $1,100 | $1,250 | $1,100 | $785 | $800 | $850 |
| 611E99151 INLET ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $1,100 | $1,250 | $1,100 | $1,080 | $800 | $1,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 500 LB | $2.00 | $1.50 | $2.00 | $1.50 | $1.25 | $2.50 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 200 SY | $18.00 | $35.00 | $87.50 | $72.00 | $38.75 | $30.00 |
| 254E01011 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER | 167 SY | $11.00 | $2.00 | $1.20 | $6.15 | $10.00 | $30.00 |
| 304E20000 AGGREGATE BASE | 50 CY | $30.00 | $50.00 | $43.50 | $35.00 | $40.00 | $40.00 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $525 | $500 | $525 | $400 | $600 | $450 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED, TYPE C | 4 EACH | $75.00 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED, TYPE D | 4 EACH | $75.00 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 621E00100 RPM | 296 EACH | $30.76 | $29.10 | $30.76 | $30.76 | $30.75 | $32.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 222 EACH | $1.00 | $1.00 | $4.00 | $2.00 | $4.50 | $5.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 31 EACH | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 646E10300 CHANNELIZING LINE, 8" | 150 FT | $1.48 | $1.48 | $1.48 | $1.48 | $1.50 | $1.90 |
| 646E10400 STOP LINE | 200 FT | $11.00 | $11.00 | $11.00 | $11.00 | $11.00 | $11.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 145 FT | $6.50 | $6.50 | $6.50 | $6.50 | $6.50 | $8.00 |
| 646E20300 LANE ARROW | 3 EACH | $160 | $160 | $160 | $160 | $160 | $165 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $350 | $350 | $350 | $350 | $350 | $750 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 6 EACH | $950 | $950 | $950 | $950 | $1,100 | $950 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $60.00 | $60.00 | $65.00 | $65.00 | $65.00 | $75.00 |
| 614E12460 WORK ZONE MARKING SIGN | 22 EACH | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 | $150 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $55.00 | $25.00 | $100 | $200 | $115 | $250 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $900 | $900 | $900 | $900 | $900 | $1,200 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.2 MILE | $800 | $800 | $600 | $800 | $800 | $800 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 8.28 MILE | $550 | $550 | $500 | $550 | $550 | $575 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 300 FT | $0.62 | $0.62 | $0.62 | $0.62 | $0.60 | $0.95 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 150 FT | $0.55 | $0.55 | $0.55 | $0.55 | $0.55 | $0.95 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 290 FT | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 145 FT | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $1.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 400 FT | $2.90 | $2.90 | $2.00 | $2.90 | $2.90 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 200 FT | $2.70 | $2.70 | $1.75 | $2.70 | $2.70 | $3.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 6 EACH | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 | $50.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 3 EACH | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 | $50.00 |
| 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A | 300 SF | $20.00 | $20.00 | $15.00 | $20.00 | $20.00 | $20.00 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $500 | $1,500 | $3,000 | $2,000 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,776 | $50.00 | $1,700 | $1,600 | $2,000 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 2,829 CY | $132 | $373k | 29% |
| 253E02000 PAVEMENT REPAIR | 2,000 CY | $115 | $230k | 18% |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1873 CY | $110 | $206k | 16% |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $350 | $73k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $57,100 | $57k | 4% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 70,739 SY | $0.7 | $50k | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 490.2 CY | $52 | $25k | 2% |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (87 CY | $270 | $23k | 2% |
| 646E10010 EDGE LINE, 6" | 8.28 MILE | $2,600 | $22k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 10,454 GAL | $1.85 | $19k | 1% |