MIA-CR 25A-03.54
MIA County · est $1.5M
Bid dateThursday, April 29—
MIA County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 117 more items below.
| Item | Quantity | R1Milcon Concrete INC | R2Barrett Paving Materials INC | R3Outdoor Enterprise LLC | R4Eagle Bridge CO | R5Brumbaugh Construction INC | R6Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,429 CY | $127 | $110 | $136 | $134 | $132 | $129 | 20% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,224 CY | $34.00 | $38.00 | $30.00 | $40.00 | $40.00 | $42.00 | 8% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 2 EACH | $29,800 | $29,800 | $32,000 |
| Item | Quantity | R1Milcon Concrete INC | R2Barrett Paving Materials INC | R3Outdoor Enterprise LLC | R4Eagle Bridge CO | R5Brumbaugh Construction INC | R6Eclipse CO LLC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,800 | $4,000 | $14,000 | $4,000 | $6,000 | $3,500 |
| 202E23000 PAVEMENT REMOVED | 1,346 SY | $11.00 | $12.00 | $18.00 | $18.00 | $8.50 | $14.00 |
| 202E30000 WALK REMOVED | 60 SF | $0.60 | $6.00 | $10.00 | $18.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $30,000 |
| $30,000 |
| $31,746 |
| 7% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 2,682 FT | $19.00 | $17.00 | $19.00 | $21.00 | $23.00 | $18.00 | 6% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 5,918 FT | $7.75 | $7.00 | $5.30 | $10.00 | $11.00 | $10.00 | 5% |
| 632E86151 STRAIN POLE, TYPE TC-81.11, DESIGN 13, AS PER PLAN | 4 EACH | $11,393 | $11,393 | $12,200 | $11,393 | $12,000 | $12,137 | 5% |
| 304E20000 AGGREGATE BASE | 1,107 CY | $40.00 | $47.50 | $40.00 | $60.00 | $40.00 | $46.50 | 5% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 240 CY | $170 | $170 | $182 | $192 | $185 | $184 | 5% |
| 632E64000 STRAIN POLE FOUNDATION | 8 EACH | $4,937 | $4,937 | $5,300 | $4,937 | $5,300 | $5,260 | 4% |
| 832E30000 EROSION CONTROL | 38,626 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (279 CY | $130 | $140 | $140 | $158 | $140 | $152 | 4% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,224 CY | $16.00 | $18.00 | $9.00 | $16.00 | $15.00 | $21.00 | 4% |
| 611E10400 24" CONDUIT, TYPE B, 706.02 OR 707.65 | 395 FT | $83.00 | $86.00 | $88.00 | $150 | $75.00 | $89.00 | 4% |
| 203E10000 EXCAVATION | 3,525 CY | $9.30 | $12.00 | $12.00 | $17.00 | $14.00 | $23.50 | 4% |
| 632E86130 STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 4 EACH | $7,966 | $7,966 | $8,500 | $7,966 | $8,700 | $8,486 | 4% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $7,384 | $7,384 | $7,900 | $7,384 | $8,000 | $7,866 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,170 | $40,000 | $30,000 | $30,000 | $36,000 | $45,000 | 3% |
| 809E69100 STOP LINE RADAR DETECTION | 3 EACH | $7,054 | $7,054 | $7,500 | $7,054 | $7,700 | $7,515 | 2% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 868 FT | $24.30 | $24.30 | $26.00 | $24.30 | $26.00 | $25.00 | 2% |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 234 SY | $74.00 | $65.00 | $78.00 | $65.00 | $90.00 | $91.00 | 2% |
| $5.50 |
| 202E32000 CURB REMOVED | 207 FT | $2.00 | $3.50 | $7.00 | $3.00 | $5.00 | $4.50 |
| 202E32500 CURB AND GUTTER REMOVED | 2,782 FT | $3.20 | $3.50 | $4.00 | $3.00 | $5.00 | $3.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 739 FT | $5.70 | $9.00 | $15.00 | $20.00 | $17.00 | $10.00 |
| 202E58000 MANHOLE REMOVED | 9 EACH | $370 | $580 | $400 | $400 | $650 | $385 |
| 202E58100 CATCH BASIN REMOVED | 8 EACH | $220 | $460 | $400 | $300 | $500 | $385 |
| 202E98100 REMOVAL MISC.: LANDSCAPE ROCK | 4 EACH | $5.00 | $40.00 | $100 | $75.00 | $25.00 | $75.50 |
| 203E20000 EMBANKMENT | 733 CY | $9.30 | $10.00 | $10.00 | $17.00 | $14.00 | $17.00 |
| 204E10000 SUBGRADE COMPACTION | 5,624 SY | $1.50 | $1.00 | $1.00 | $2.50 | $1.00 | $1.50 |
| 204E45000 PROOF ROLLING | 3 HOUR | $150 | $100 | $100 | $150 | $100 | $213 |
| 608E12000 5" CONCRETE WALK | 850 SF | $11.80 | $10.00 | $12.50 | $12.00 | $12.00 | $15.50 |
| 608E52000 CURB RAMP | 405 SF | $18.00 | $16.00 | $20.00 | $18.00 | $20.00 | $24.50 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $150 | $160 | $100 | $150 | $250 | $239 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 250 TON | $42.00 | $40.00 | $30.00 | $40.00 | $100 | $50.50 |
| 616E10000 WATER | 50 MGAL | $105 | $5.00 | $10.00 | $19.87 | $5.00 | $18.00 |
| 659E00300 TOPSOIL | 536 CY | $23.00 | $35.00 | $19.00 | $15.00 | $45.00 | $42.00 |
| 659E10000 SEEDING AND MULCHING | 4,827 SY | $0.75 | $0.72 | $1.00 | $2.00 | $2.00 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 241 SY | $0.35 | $0.35 | $2.00 | $2.00 | $2.00 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.65 TON | $1,000 | $1,000 | $800 | $1,250 | $750 | $1,066 |
| 659E31000 LIME | 1 ACRE | $200 | $200 | $250 | $5.00 | $5.00 | $213 |
| 659E35000 WATER | 26.1 MGAL | $10.00 | $10.00 | $10.00 | $15.00 | $5.00 | $10.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,600 | $1,500 | $1,600 | $2,000 | $1,500 | $1,172 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,350 | $6,800 | $4,400 | $15,000 | $8,000 | $7,085 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,690 | $12,000 | $12,000 | $6,000 | $12,000 | $11,673 |
| 602E20000 CONCRETE MASONRY | 3 CY | $1,420 | $1,400 | $3,000 | $1,000 | $1,000 | $1,325 |
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 3 CY | $685 | $900 | $1,500 | $1,500 | $1,100 | $856 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 200 FT | $14.50 | $17.00 | $4.00 | $18.00 | $25.00 | $11.50 |
| 611E04400 12" CONDUIT, TYPE B, 706.02 OR 707.65 | 148 FT | $81.00 | $68.00 | $60.00 | $75.00 | $54.00 | $77.50 |
| 611E04600 12" CONDUIT, TYPE C, 706.02 OR 707.65 | 96 FT | $33.00 | $52.00 | $60.00 | $45.00 | $63.00 | $52.00 |
| 611E05900 15" CONDUIT, TYPE B, 706.02 OR 707.65 | 28 FT | $170 | $70.00 | $86.00 | $125 | $66.00 | $174 |
| 611E07400 18" CONDUIT, TYPE B, 706.02 OR 707.65 | 76 FT | $89.00 | $70.00 | $90.00 | $90.00 | $105 | $75.50 |
| 611E57600 49" X 33" CONDUIT, TYPE A, 706.04 | 13 FT | $534 | $248 | $250 | $300 | $250 | $362 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 3 EACH | $3,890 | $4,900 | $3,900 | $5,500 | $4,600 | $3,690 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 6 EACH | $1,840 | $2,800 | $2,600 | $3,000 | $1,600 | $2,407 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $420 | $550 | $700 | $2,000 | $800 | $517 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $2,390 | $3,500 | $2,600 | $3,500 | $2,500 | $3,232 |
| 611E99580 MANHOLE, NO. 3 WITH 84" BASE I.D. AND 6" WEIR | 1 EACH | $8,100 | $7,000 | $6,300 | $7,500 | $8,700 | $8,092 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $341 | $280 | $300 | $250 | $250 | $341 |
| 895E10010 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 1 | 1 EACH | $16,415 | $19,000 | $19,000 | $15,500 | $20,000 | $19,185 |
| 305E13010 9" CONCRETE BASE, CLASS QC 1P | 3 SY | $90.00 | $80.00 | $200 | $80.00 | $250 | $284 |
| 407E10000 TACK COAT | 310 GAL | $5.00 | $3.00 | $5.50 | $4.00 | $5.00 | $4.50 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 57 FT | $40.00 | $35.00 | $39.00 | $40.00 | $44.00 | $56.00 |
| 609E26000 CURB, TYPE 6 | 79 FT | $37.50 | $30.00 | $35.00 | $35.00 | $37.00 | $43.00 |
| 638E10500 FIRE HYDRANT REMOVED AND RESET | 1 EACH | $2,575 | $5,000 | $4,200 | $5,000 | $3,000 | $4,137 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $110 | $270 | $180 | $250 | $250 | $259 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 408 FT | $9.50 | $9.50 | $10.00 | $9.50 | $10.00 | $10.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 75 FT | $30.00 | $30.00 | $32.00 | $30.00 | $30.00 | $32.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 4 EACH | $360 | $360 | $385 | $360 | $400 | $384 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 9 EACH | $175 | $175 | $187 | $175 | $200 | $187 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 12 EACH | $125 | $125 | $134 | $125 | $130 | $133 |
| 630E80100 SIGN, FLAT SHEET | 256 SF | $13.50 | $13.50 | $14.00 | $13.50 | $15.00 | $14.50 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 72 SF | $39.70 | $39.70 | $42.00 | $39.70 | $40.00 | $42.50 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 4 EACH | $950 | $950 | $1,000 | $950 | $1,000 | $1,012 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 25 EACH | $25.00 | $25.00 | $27.00 | $25.00 | $25.00 | $26.50 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 2 EACH | $175 | $175 | $190 | $175 | $200 | $187 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 18 EACH | $35.00 | $35.00 | $37.00 | $35.00 | $40.00 | $37.50 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 4 EACH | $225 | $225 | $240 | $225 | $250 | $240 |
| 644E00100 EDGE LINE, 4" | 0.24 MILE | $3,695 | $3,696 | $4,000 | $3,696 | $4,000 | $3,937 |
| 644E00200 LANE LINE, 4" | 1.29 MILE | $1,100 | $1,100 | $1,200 | $1,100 | $1,200 | $1,172 |
| 644E00300 CENTER LINE | 1.06 MILE | $5,250 | $5,250 | $5,600 | $5,250 | $5,600 | $5,593 |
| 644E00400 CHANNELIZING LINE, 8" | 759 FT | $1.50 | $1.46 | $1.60 | $1.46 | $1.60 | $1.50 |
| 644E00500 STOP LINE | 248 FT | $9.00 | $9.08 | $10.00 | $9.08 | $10.00 | $9.50 |
| 644E00600 CROSSWALK LINE | 151 FT | $4.50 | $4.54 | $5.00 | $4.54 | $5.00 | $5.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 144 FT | $6.00 | $5.98 | $6.50 | $5.98 | $6.50 | $6.50 |
| 644E01300 LANE ARROW | 26 EACH | $86.00 | $86.08 | $92.00 | $86.08 | $95.00 | $91.50 |
| 644E01630 BIKE LANE SYMBOL MARKING | 4 EACH | $346 | $346 | $370 | $346 | $375 | $369 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 10 EACH | $104 | $104 | $110 | $104 | $110 | $111 |
| 644E30030 REMOVAL OF PAVEMENT MARKING | 2.51 MILE | $2,490 | $2,491 | $2,700 | $2,491 | $2,700 | $2,654 |
| 646E10100 LANE LINE, 4" | 0.07 MILE | $38,125 | $38,123 | $41,000 | $38,123 | $41,000 | $40,613 |
| 625E25400 CONDUIT, 2", 725.04 | 36 FT | $36.25 | $36.25 | $40.00 | $36.25 | $40.00 | $38.50 |
| 625E25500 CONDUIT, 3", 725.04 | 76 FT | $55.00 | $55.00 | $60.00 | $55.00 | $875 | $58.50 |
| 625E29000 TRENCH | 83 FT | $14.25 | $14.25 | $15.00 | $14.25 | $15.00 | $15.00 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $860 | $860 | $920 | $860 | $950 | $916 |
| 625E32000 GROUND ROD | 12 EACH | $248 | $248 | $265 | $248 | $275 | $264 |
| 625E98100 LIGHTING, MISC.: PLASTIC CAUTION TAPE | 83 FT | $1.30 | $1.30 | $1.40 | $1.30 | $1.25 | $1.50 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 13 EACH | $817 | $817 | $875 | $817 | $850 | $871 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 3 EACH | $1,062 | $1,062 | $1,200 | $1,062 | $1,150 | $1,132 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 2 EACH | $575 | $575 | $615 | $575 | $625 | $613 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 16 EACH | $38.75 | $38.75 | $42.00 | $38.75 | $40.00 | $41.50 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 2 EACH | $17.85 | $17.85 | $20.00 | $17.85 | $20.00 | $19.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 2 EACH | $241 | $241 | $260 | $241 | $250 | $257 |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 868 FT | $19.40 | $19.40 | $21.00 | $19.40 | $20.00 | $20.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 489 FT | $2.40 | $2.40 | $2.50 | $2.40 | $2.75 | $2.50 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,468 FT | $2.75 | $2.75 | $2.90 | $2.75 | $3.00 | $3.00 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 497 FT | $2.00 | $2.00 | $2.15 | $2.00 | $2.00 | $2.00 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 174 FT | $5.10 | $5.10 | $5.50 | $5.10 | $5.50 | $5.50 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 56 FT | $6.65 | $5.65 | $7.00 | $6.65 | $7.50 | $7.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 2 EACH | $2,496 | $2,496 | $2,700 | $2,496 | $2,700 | $2,659 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 2 EACH | $4,924 | $4,924 | $5,300 | $4,924 | $5,500 | $5,246 |
| 633E65510 CABINET, TYPE TS-2 | 2 EACH | $8,484 | $8,484 | $9,000 | $8,484 | $9,300 | $9,038 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 2 EACH | $1,530 | $1,530 | $1,600 | $1,530 | $1,700 | $1,630 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 2 EACH | $557 | $557 | $600 | $557 | $600 | $594 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $5,569 | $5,569 | $6,000 | $5,569 | $6,000 | $5,933 |
| 809E69122 ATC V6.24 CONTROLLER | 2 EACH | $3,823 | $3,823 | $4,000 | $3,823 | $4,200 | $4,073 |
| 815E30000 SPREAD SPECTRUM RADIO | 1 EACH | $3,438 | $3,438 | $3,700 | $3,438 | $3,800 | $3,663 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 20 CY | $40.00 | $50.00 | $40.00 | $65.00 | $50.00 | $50.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 20 CY | $40.00 | $50.00 | $40.00 | $65.00 | $60.00 | $67.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $85.00 | $75.00 | $70.00 | $80.00 | $75.00 | $64.00 |
| 614E12500 REPLACEMENT SIGN | 6 EACH | $225 | $225 | $50.00 | $225 | $130 | $240 |
| 614E12600 REPLACEMENT DRUM | 50 EACH | $60.00 | $60.00 | $20.00 | $50.00 | $50.00 | $64.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $300 | $150 | $320 | $250 | $375 | $205 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 1.36 MILE | $300 | $303 | $320 | $303 | $330 | $323 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.71 MILE | $980 | $977 | $1,000 | $977 | $1,050 | $1,041 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.06 MILE | $660 | $651 | $700 | $651 | $700 | $693 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 1.18 MILE | $730 | $730 | $780 | $730 | $800 | $778 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.24 MILE | $425 | $424 | $450 | $424 | $450 | $452 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 759 FT | $0.50 | $0.54 | $0.60 | $0.54 | $0.60 | $0.50 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 4", 642 PAINT | 1,080 FT | $0.60 | $0.59 | $0.60 | $0.59 | $0.70 | $0.50 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 103 FT | $3.00 | $2.98 | $3.20 | $2.98 | $3.15 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 248 FT | $2.50 | $2.51 | $2.70 | $2.51 | $2.75 | $2.50 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 151 FT | $2.25 | $2.25 | $2.40 | $2.25 | $2.30 | $2.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,590 | $4,379 | $15,000 | $20,000 | $10,000 | $22,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,465 | $1,000 | $1,000 | $2,000 | $500 | $776 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,450 | $15,000 | $10,000 | $20,000 | $15,000 | $18,500 |
| 624E10000 MOBILIZATION | 1 LS | $12,250 | $7,000 | $20,000 | $40,000 | $42,117 | $59,378 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,429 CY | $127 | $181k | 13% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 2,224 CY | $34 | $76k | 6% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 2 EACH | $29,800 | $60k | 4% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 2,682 FT | $19 | $51k | 4% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 5,918 FT | $7.75 | $46k | 3% |
| 632E86151 STRAIN POLE, TYPE TC-81.11, DESIGN 13, AS PER PLAN | 4 EACH | $11,393 | $46k | 3% |
| 304E20000 AGGREGATE BASE | 1,107 CY | $40 | $44k | 3% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 240 CY | $170 | $41k | 3% |
| 632E64000 STRAIN POLE FOUNDATION | 8 EACH | $4,937 | $39k | 3% |
| 832E30000 EROSION CONTROL | 38,626 EACH | $1 | $39k | 3% |