BEL-US 40-11.62/11.81
BEL County · est $0.3M
Bid dateThursday, May 13—
BEL County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 4.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 20 more items below.
| Item | Quantity | R1Rudzik Excavating INC | R2Ohio-west Virginia Excavating CO | R3Buds INC | R4Stanley Miller Construction Company | R5Turn-key Tunneling INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E96600 CONDUIT, BORED OR JACKED, 48" TYPE A | 154 FT | $685 | $565 | $851 | $921 | $870 | 33% |
| 611E96600 CONDUIT, BORED OR JACKED, 36" TYPE B | 164 FT | $525 | $525 | $722 | $693 | $685 | 27% |
| 832E30000 EROSION CONTROL | 19,213 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| Item | Quantity | R1Rudzik Excavating INC | R2Ohio-west Virginia Excavating CO | R3Buds INC | R4Stanley Miller Construction Company | R5Turn-key Tunneling INC |
|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $750 | $400 | $500 | $430 | $702 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 137 FT | $10.00 | $23.00 | $25.00 | $10.00 | $37.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 54 FT | $25.00 | $24.00 | $25.00 | $25.00 | $162 |
| 202E38000 GUARDRAIL REMOVED | 300 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $14,350 | $10,000 | $6,000 | $13,889 | $25,500 | 5% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 48" CMP | 142 FT | $72.50 | $135 | $135 | $124 | $136 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 300 FT | $32.00 | $35.00 | $35.00 | $37.44 | $58.00 | 3% |
| 203E20000 EMBANKMENT | 214 CY | $40.00 | $60.00 | $25.00 | $60.00 | $64.00 | 3% |
| 659E00300 TOPSOIL | 485 CY | $17.00 | $27.00 | $45.00 | $40.55 | $43.00 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,756 | $2,800 | $3,000 | $6,667 | $6,500 | 2% |
| 611E07600 18" CONDUIT, TYPE C | 68 FT | $113 | $80.00 | $250 | $77.00 | $200 | 2% |
| 602E20000 CONCRETE MASONRY | 3.56 CY | $1,750 | $1,400 | $3,000 | $1,441 | $1,404 | 2% |
| 659E10000 SEEDING AND MULCHING | 4,371 SY | $1.30 | $1.75 | $2.00 | $1.84 | $5.40 | 2% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 36" CMP | 100 FT | $50.50 | $142 | $90.00 | $105 | $113 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,730 | $6,000 | $6,000 | $6,000 | $9,260 | 1% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 28 CY | $122 | $90.00 | $150 | $193 | $162 | 1% |
| 611E98230 CATCH BASIN, NO. 4, WITH GRATE 'E' | 1 EACH | $3,094 | $3,500 | $3,500 | $2,881 | $4,940 | 1% |
| 203E10000 EXCAVATION | 51 CY | $60.00 | $60.00 | $50.00 | $47.00 | $27.00 | 1% |
| 601E11000 RIPRAP, TYPE D | 9 SY | $335 | $100 | $500 | $439 | $162 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,750 | $12,000 | $7,000 | $4,444 | $20,500 | 1% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 11 CY | $150 | $125 | $165 | $192 | $162 | 1% |
| $2.25 |
| $7.00 |
| $3.00 |
| $3.00 |
| $5.40 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $300 | $300 | $500 | $250 | $810 |
| 202E98300 REMOVAL MISC.: CHANNEL PROTECTION | 14 SY | $50.00 | $42.00 | $50.00 | $40.00 | $54.00 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $50.00 | $100 | $100 | $50.00 | $27.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 219 SY | $0.50 | $1.75 | $0.10 | $1.06 | $0.22 |
| 659E20000 COMMERCIAL FERTILIZER | 0.61 TON | $25.00 | $650 | $650 | $50.00 | $1,296 |
| 659E31000 LIME | 0.9 ACRE | $20.00 | $85.00 | $150 | $28.00 | $864 |
| 659E35000 WATER | 25 MGAL | $0.01 | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 42 SY | $8.00 | $3.25 | $3.00 | $3.78 | $16.20 |
| 611E01100 6" CONDUIT, TYPE C | 30 FT | $12.00 | $65.00 | $25.00 | $10.00 | $49.00 |
| 611E06100 15" CONDUIT, TYPE C | 8 FT | $118 | $190 | $200 | $169 | $189 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 6 EACH | $8.50 | $9.00 | $8.00 | $8.34 | $25.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 12 FT | $30.00 | $20.00 | $17.00 | $17.00 | $30.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $85.00 | $200 | $100 | $84.00 | $60.00 |
| 616E10000 WATER | 10 MGAL | $0.01 | $10.00 | $1.00 | $1.00 | $1.00 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $500 | $600 | $200 | $750 | $1,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,250 | $2,400 | $4,900 | $19,133 | $6,050 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96600 CONDUIT, BORED OR JACKED, 48" TYPE A | 154 FT | $685 | $105k | 32% |
| 611E96600 CONDUIT, BORED OR JACKED, 36" TYPE B | 164 FT | $525 | $86k | 26% |
| 832E30000 EROSION CONTROL | 19,213 EACH | $1 | $19k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $14,350 | $14k | 4% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 48" CMP | 142 FT | $72.5 | $10k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 300 FT | $32 | $10k | 3% |
| 203E20000 EMBANKMENT | 214 CY | $40 | $9k | 3% |
| 659E00300 TOPSOIL | 485 CY | $17 | $8k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,756 | $8k | 2% |
| 611E07600 18" CONDUIT, TYPE C | 68 FT | $113 | $8k | 2% |