CUY-SR 175-07.97
CUY County · est $0.6M
Bid dateThursday, May 13—
CUY County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 11 more items below.
| Item | Quantity | R1Catts Construction INC | R2Chagrin Valley Paving INC | R3Karvo Companies INC | R4Perk Company INC | R5Lockhart Concrete CO | R6Tri-mor CORP | % of bid |
|---|---|---|---|---|---|---|---|---|
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 3,006 SY | $135 | $140 | $140 | $154 | $161 | $175 | 70% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 376 SY | $148 | $150 | $180 | $163 | $168 | $190 | 10% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $25,000 | $53,400 | $50,000 |
| Item | Quantity | R1Catts Construction INC | R2Chagrin Valley Paving INC | R3Karvo Companies INC | R4Perk Company INC | R5Lockhart Concrete CO | R6Tri-mor CORP |
|---|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 677 SF | $2.00 | $3.00 | $10.00 | $2.90 | $5.00 | $4.00 |
| 202E32000 CURB REMOVED | 90 FT | $10.00 | $10.00 | $20.00 | $6.70 | $10.00 | $10.00 |
| 204E10000 SUBGRADE COMPACTION | 1,000 SY | $1.00 | $1.00 | $1.00 | $1.50 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $28,000 |
| $49,000 |
| $55,000 |
| 4% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 10,070 FT | $2.00 | $2.00 | $2.30 | $3.40 | $2.00 | $5.00 | 4% |
| 608E52000 CURB RAMP | 609 SF | $16.50 | $25.00 | $15.00 | $24.75 | $12.00 | $25.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,400 | $5,200 | $5,000 | $8,000 | $9,403 | $15,000 | 1% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 100 CY | $62.50 | $75.00 | $35.00 | $62.00 | $46.00 | $80.00 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $711 | $900 | $900 | $1,200 | $600 | $1,000 | 1% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 3,000 LB | $1.50 | $2.00 | $1.75 | $1.25 | $1.00 | $2.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 60 HOUR | $71.00 | $75.00 | $65.00 | $65.00 | $55.00 | $75.00 | 1% |
| 832E30001 EROSION CONTROL, AS PER PLAN | 4,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $20,000 | $44,449 | $25,000 | $40,000 | $20,000 | 1% |
| 203E10001 EXCAVATION, AS PER PLAN | 100 CY | $38.00 | $30.00 | $22.00 | $30.00 | $20.00 | $60.00 | 1% |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 16 EACH | $232 | $195 | $350 | $195 | $195 | $385 | 1% |
| 632E26500 DETECTOR LOOP | 2 EACH | $1,779 | $1,500 | $1,250 | $1,500 | $1,500 | $2,000 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $750 | $1,500 | $2,500 | $1,850 | $1,000 | $1,500 | 1% |
| 451E32000 SPECIAL - PRESSURE RELIEF JOINT, TYPE C | 53 FT | $56.60 | $200 | $105 | $140 | $130 | $55.00 | 1% |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 1,020 FT | $2.70 | $2.25 | $1.50 | $2.25 | $2.25 | $2.00 | 0% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $550 | $750 | $475 | $900 | $400 | $250 | 0% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 3 EACH | $700 | $1,000 | $700 | $900 | $1,000 | $1,000 | 0% |
| $5.00 |
| 608E10000 4" CONCRETE WALK | 100 SF | $7.50 | $15.00 | $10.00 | $20.00 | $10.00 | $25.00 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 2 EACH | $550 | $750 | $400 | $1,025 | $1,000 | $500 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,000 | $1,750 | $850 | $1,500 | $4,000 | $1,200 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 2 EACH | $850 | $1,250 | $925 | $1,100 | $3,000 | $1,200 |
| 638E98000 WATER WORK, MISC.: CWD VAULT ADJUSTED TO GRADE | 2 EACH | $525 | $750 | $1,750 | $1,200 | $1,000 | $1,652 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1.15 MILE | $10.00 | $8,500 | $10,000 | $8,500 | $8,500 | $12,000 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 70 FT | $6.00 | $5.00 | $6.00 | $5.00 | $5.00 | $7.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $800 | $100 | $3,000 | $2,500 | $19,000 | $1,600 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 3,006 SY | $134.5 | $404k | 69% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 376 SY | $148 | $56k | 10% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $25,000 | $25k | 4% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 10,070 FT | $2 | $20k | 3% |
| 608E52000 CURB RAMP | 609 SF | $16.5 | $10k | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,400 | $6k | 1% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 100 CY | $62.5 | $6k | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $711 | $6k | 1% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 3,000 LB | $1.5 | $5k | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 60 HOUR | $71 | $4k | 1% |