SUM-North River Road
SUM County · est $0.6M
Bid dateThursday, May 27—
SUM County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 20 more items below.
| Item | Quantity | R1Barbicas Construction Company INC | R2Chagrin Valley Paving INC | R3Karvo Companies INC | R4Kenmore Construction CO INC | R5Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (897 CY | $135 | $140 | $110 | $148 | $140 | 20% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 666 CY | $170 | $140 | $150 | $155 | $190 | 19% |
| 690E98300 SPECIAL - GLASPAVE 25 PAVEMENT INTERLAYER | 18,302 SY | $3.00 | $3.14 | $3.14 | $3.25 | $3.14 | 9% |
| Item | Quantity | R1Barbicas Construction Company INC | R2Chagrin Valley Paving INC | R3Karvo Companies INC | R4Kenmore Construction CO INC | R5Shelly & Sands INC |
|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 23 SY | $20.00 | $2.00 | $15.00 | $100 | $760 |
| 202E30000 WALK REMOVED | 506 SF | $4.00 | $5.00 | $6.00 | $2.00 | $7.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 155 CY | $18.00 | $5.00 | $15.00 | $20.00 | $24.00 |
| 204E10000 SUBGRADE COMPACTION (FOR PAVEMENT REPAIR) | 925 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $50,000 |
| $32,600 |
| $43,250 |
| $10,000 |
| $20,000 |
| 8% |
| 253E01000 PAVEMENT REPAIR | 925 SY | $50.00 | $40.00 | $65.00 | $55.00 | $100 | 8% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=VARIES) | 18,302 SY | $2.25 | $2.00 | $1.53 | $2.55 | $1.20 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $45,000 | $72,000 | $25,000 | $59,159 | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 925 SY | $20.00 | $20.00 | $45.00 | $30.00 | $32.00 | 3% |
| 202E98400 REMOVAL MISC.:CONCRETE PATCHES REMOVED AND REPLACE | 1,250 SF | $14.00 | $5.00 | $20.00 | $45.00 | $18.00 | 3% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 17 EACH | $1,000 | $1,250 | $1,475 | $1,500 | $1,600 | 3% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 23 EACH | $700 | $1,000 | $2,150 | $1,800 | $1,450 | 3% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 32 EACH | $400 | $1,000 | $850 | $900 | $700 | 2% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 10,000 LB | $1.15 | $1.00 | $1.50 | $2.00 | $2.00 | 2% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $5,000 | $7,800 | $15,000 | $3,851 | 2% |
| 609E98000 CURB, MISC.:CURB REMOVED AND REPLACED | 300 FT | $30.00 | $75.00 | $45.00 | $40.00 | $18.00 | 2% |
| 608E52000 CURB RAMP | 542 SF | $12.50 | $30.00 | $15.00 | $28.00 | $27.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 2,581 GAL | $2.50 | $3.00 | $2.50 | $3.00 | $3.00 | 1% |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 8 EACH | $800 | $1,000 | $1,000 | $1,500 | $850 | 1% |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 155 CY | $40.00 | $20.00 | $30.00 | $40.00 | $30.00 | 1% |
| $0.50 |
| $0.50 |
| $1.00 |
| $1.00 |
| $1.00 |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 44.54 STA | $100 | $75.00 | $28.00 | $75.00 | $40.00 |
| 608E10000 4" CONCRETE WALK | 30 SF | $10.00 | $15.00 | $12.00 | $30.00 | $28.00 |
| 608E53020 DETECTABLE WARNING | 8 SF | $40.00 | $150 | $55.00 | $24.00 | $38.00 |
| 690E98400 SPECIAL - PRECONSTRUCTION VIDEORECORDING | 1 LS | $600 | $682 | $750 | $1,500 | $3,000 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 64 CY | $70.00 | $75.00 | $100 | $100 | $102 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.85 MILE | $785 | $785 | $785 | $785 | $785 |
| 642E00300 CENTER LINE, TYPE 1 | 1.12 MILE | $985 | $985 | $985 | $985 | $985 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 100 FT | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 642E00500 STOP LINE, TYPE 1 | 23 FT | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 642E00600 CROSSWALK LINE, TYPE 1 | 172 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 1 | 4 EACH | $300 | $300 | $300 | $300 | $300 |
| 642E01300 LANE ARROW, TYPE 1 | 6 EACH | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 2 EACH | $1,800 | $1,300 | $1,300 | $1,250 | $1,300 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $65.00 | $75.00 | $75.00 | $75.00 | $65.00 |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 2.3 MILE | $675 | $675 | $675 | $675 | $675 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.15 MILE | $1,175 | $1,175 | $1,175 | $1,175 | $1,175 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (897 CY | $135 | $121k | 19% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 666 CY | $170 | $113k | 18% |
| 690E98300 SPECIAL - GLASPAVE 25 PAVEMENT INTERLAYER | 18,302 SY | $3 | $55k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $50,000 | $50k | 8% |
| 253E01000 PAVEMENT REPAIR | 925 SY | $50 | $46k | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=VARIES) | 18,302 SY | $2.25 | $41k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 925 SY | $20 | $19k | 3% |
| 202E98400 REMOVAL MISC.:CONCRETE PATCHES REMOVED AND REPLACE | 1,250 SF | $14 | $18k | 3% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 17 EACH | $1,000 | $17k | 3% |