MIA-IR 75-19.01 L/R
MIA County · est $5.9M
Bid dateThursday, June 17—
MIA County · est $5.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 135 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2Brumbaugh Construction INC | R3Kokosing Construction Company INC | R4Great Lakes Construction CO | R5Complete General Construction Company | R6Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 5,160 CY | $195 | $198 | $195 | $219 | $198 | $220 | 24% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 7,507 SY | $54.00 | $47.00 | $12.00 | $50.00 | $50.00 | $57.00 | 9% |
| 502E11101 STRUCTURE FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $357,500 |
| Item | Quantity | R1Eagle Bridge CO | R2Brumbaugh Construction INC | R3Kokosing Construction Company INC | R4Great Lakes Construction CO | R5Complete General Construction Company | R6Sunesis Construction CO |
|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 547 SY | $20.00 | $35.00 | $32.00 | $35.00 | $17.00 | $23.16 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 962 SY | $8.00 | $9.00 | $18.00 | $20.00 | $14.00 | $5.32 |
| 202E38000 GUARDRAIL REMOVED | 2,877 FT | $4.00 | $4.00 | $4.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $385,000 |
| $325,000 |
| $515,300 |
| $450,000 |
| $382,189 |
| 8% |
| 511E32213 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 549 CY | $650 | $865 | $850 | $900 | $750 | $1,037 | 8% |
| 509E40000 REINFORCING STEEL, MISC.:GALVANIZED COATED REINFOR | 220,600 LB | $1.35 | $1.65 | $2.15 | $1.70 | $2.05 | $2.81 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200,000 | $200,000 | $200,000 | $200,000 | $234,700 | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75 | 106,096 SY | $1.80 | $1.80 | $1.80 | $1.50 | $1.80 | $1.81 | 4% |
| 507E00751 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,400 FT | $115 | $130 | $147 | $115 | $115 | $139 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $160,000 | $100,000 | $55,000 | $115,000 | $65,000 | $73,533 | 4% |
| 507E00551 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 2,400 FT | $65.00 | $63.00 | $69.50 | $60.00 | $65.00 | $69.31 | 4% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $150,000 | $293,778 | $442,756 | $90,000 | $125,000 | $118,697 | 4% |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 482 SY | $275 | $345 | $395 | $360 | $340 | $434 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 8,060 FT | $14.00 | $22.00 | $10.00 | $16.35 | $19.00 | $22.68 | 3% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 146 CY | $700 | $485 | $765 | $915 | $1,000 | $941 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $100,000 | $43,000 | $197,950 | $110,000 | $75,000 | $78,239 | 2% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $90,000 | $150,000 | $80,000 | $150,000 | $200,000 | $93,627 | 2% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 207 CY | $400 | $500 | $550 | $425 | $400 | $631 | 2% |
| 618E40101 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 7,854 FT | $10.00 | $6.50 | $6.50 | $7.25 | $6.50 | $7.93 | 2% |
| 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS | 44 CY | $1,500 | $1,100 | $1,500 | $2,500 | $1,500 | $2,055 | 2% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 3,950 FT | $16.00 | $27.00 | $15.00 | $17.49 | $22.00 | $28.16 | 1% |
| $4.00 |
| $4.00 |
| $4.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 5 EACH | $150 | $150 | $150 | $150 | $150 | $150 |
| 202E48100 CABLE BARRIER REMOVED FOR STORAGE | 2,110 FT | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 202E58100 CATCH BASIN REMOVED | 6 EACH | $250 | $365 | $687 | $530 | $300 | $189 |
| 203E10000 EXCAVATION | 1,581 CY | $25.00 | $21.50 | $19.00 | $30.00 | $17.00 | $16.46 |
| 203E20000 EMBANKMENT | 676 CY | $35.00 | $26.50 | $3.00 | $17.00 | $24.00 | $10.75 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 182 FT | $2.50 | $8.00 | $8.24 | $3.10 | $3.00 | $21.01 |
| 606E15050 GUARDRAIL, TYPE MGS | 775 FT | $19.10 | $19.10 | $19.10 | $19.10 | $19.10 | $19.10 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 1,787.5 FT | $21.30 | $21.30 | $21.30 | $21.30 | $21.30 | $21.30 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E NCHRP 350/MASH 2016 | 4 EACH | $2,400 | $2,400 | $2,400 | $2,400 | $2,400 | $2,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,125 | $1,125 | $1,125 | $1,125 | $1,125 | $1,125 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,200 | $2,200 | $2,200 | $2,200 | $2,200 | $2,200 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $350 | $350 | $350 | $350 | $350 | $350 |
| 606E55020 SPECIAL - CABLE BARRIER, REPLACEMENT CABLE | 2,110 FT | $14.33 | $12.90 | $7.90 | $12.90 | $12.90 | $12.90 |
| 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY | 4 EACH | $5,650 | $5,650 | $5,650 | $5,650 | $5,650 | $5,650 |
| 606E55180 SPECIAL - CABLE BARRIER, SPLICE | 2 EACH | $1,225 | $1,225 | $1,225 | $1,225 | $1,225 | $1,225 |
| 606E55190 SPECIAL - CABLE BARRIER, POST REFLECTOR | 23 EACH | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 606E55200 SPECIAL - CABLE BARRIER, TENSIONING | 2 EACH | $850 | $850 | $850 | $850 | $850 | $850 |
| 606E98100 GUARDRAIL, MISC.:CABLE BARRIER ANCHOR ASSEMBLY REM | 2 EACH | $275 | $275 | $275 | $275 | $275 | $275 |
| 609E24510 CURB, TYPE 4-C | 84 FT | $45.00 | $25.00 | $55.50 | $60.00 | $70.00 | $27.79 |
| 690E98300 SPECIAL - MOW STRIP | 962 SY | $50.00 | $38.00 | $75.00 | $86.00 | $90.00 | $118 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,000 | $5,500 | $14,900 | $15,000 | $9,000 | $2,980 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 188 FT | $10.00 | $36.00 | $25.00 | $15.00 | $30.00 | $24.60 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 58 SY | $65.00 | $77.00 | $102 | $100 | $129 | $99.56 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 397 CY | $75.00 | $90.00 | $129 | $105 | $74.00 | $97.25 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $300 | $50.00 | $50.00 | $50.00 | $75.00 | $50.00 |
| 659E00300 TOPSOIL | 304 CY | $30.00 | $25.00 | $22.00 | $30.00 | $30.00 | $26.24 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 2,735 SY | $2.75 | $2.25 | $1.60 | $1.60 | $3.70 | $2.79 |
| 659E14000 REPAIR SEEDING AND MULCHING | 137 SY | $2.00 | $2.00 | $0.70 | $0.70 | $3.65 | $0.70 |
| 659E15000 INTER-SEEDING | 137 SY | $2.00 | $2.00 | $0.50 | $0.50 | $3.65 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.38 TON | $1,500 | $650 | $450 | $450 | $600 | $450 |
| 659E31000 LIME | 0.57 ACRE | $10.00 | $50.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 659E35000 WATER | 15 MGAL | $15.00 | $5.00 | $10.00 | $10.00 | $8.00 | $10.00 |
| 659E40000 MOWING | 6 MSF | $20.00 | $100 | $50.00 | $50.00 | $75.00 | $50.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $1,325 | $1,325 | $2,000 | $1,400 | $1,325 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $20,000 | $8,160 | $12,450 | $12,000 | $10,000 | $10,140 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,000 | $12,500 | $18,000 | $6,000 | $12,500 | $12,403 |
| 832E30000 EROSION CONTROL | 45,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 133 FT | $14.00 | $25.00 | $30.00 | $17.00 | $16.00 | $14.64 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 45 FT | $20.00 | $17.00 | $36.00 | $26.00 | $58.00 | $19.14 |
| 611E05900 15" CONDUIT, TYPE B | 525 FT | $65.00 | $82.00 | $98.00 | $54.00 | $80.00 | $73.16 |
| 611E98410 CATCH BASIN, NO. 8 | 6 EACH | $2,500 | $2,160 | $5,700 | $4,300 | $3,600 | $5,514 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $250 | $285 | $366 | $365 | $200 | $340 |
| 204E10000 SUBGRADE COMPACTION | 456 SY | $10.00 | $2.30 | $7.00 | $1.38 | $3.00 | $3.89 |
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 300 SY | $200 | $200 | $200 | $123 | $200 | $100 |
| 254E01601 PATCHING PLANED SURFACE, AS PER PLAN | 50 SY | $50.00 | $50.00 | $50.00 | $4.00 | $50.00 | $100 |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 146 CY | $240 | $240 | $280 | $275 | $240 | $225 |
| 304E20000 AGGREGATE BASE | 161 CY | $80.00 | $65.00 | $110 | $95.00 | $88.00 | $92.96 |
| 407E10000 TACK COAT | 189 GAL | $3.00 | $3.00 | $3.00 | $4.00 | $3.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 9,020 GAL | $3.00 | $3.00 | $3.00 | $5.00 | $3.00 | $1.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 132 CY | $100 | $77.00 | $100 | $78.00 | $120 | $93.46 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 5,160 CY | $8.00 | $8.00 | $8.00 | $7.00 | $8.00 | $7.00 |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 64 CY | $300 | $300 | $300 | $180 | $300 | $220 |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 78 CY | $255 | $255 | $285 | $465 | $255 | $302 |
| 617E10100 COMPACTED AGGREGATE | 589 CY | $100 | $90.00 | $93.00 | $57.38 | $90.00 | $100 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 1,089 SY | $12.00 | $12.00 | $12.00 | $20.50 | $12.00 | $7.13 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 44,564 FT | $0.40 | $0.15 | $0.19 | $0.33 | $1.00 | $0.46 |
| 621E00100 RPM | 341 EACH | $31.50 | $31.50 | $30.75 | $31.50 | $31.50 | $31.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 323 EACH | $8.50 | $8.50 | $10.00 | $9.84 | $8.50 | $10.00 |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 49.4 FT | $57.00 | $57.00 | $57.00 | $57.00 | $57.00 | $57.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $250 | $250 | $250 | $250 | $250 | $250 |
| 630E82000 SIGN BACKING ASSEMBLY | 1 EACH | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $1,250 | $1,250 | $1,250 | $1,250 | $1,250 | $1,250 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 1 EACH | $450 | $450 | $450 | $450 | $450 | $450 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $175 | $175 | $175 | $175 | $175 | $175 |
| 644E00104 EDGE LINE, 6" | 5.42 MILE | $3,645 | $3,645 | $3,645 | $3,645 | $3,645 | $3,645 |
| 644E00204 LANE LINE, 6" | 2.71 MILE | $1,735 | $1,735 | $1,735 | $1,735 | $1,735 | $1,735 |
| 646E10010 EDGE LINE, 6" | 0.12 MILE | $46,600 | $46,600 | $46,600 | $46,600 | $46,600 | $46,600 |
| 646E10110 LANE LINE, 6" | 0.06 MILE | $45,920 | $45,920 | $45,920 | $45,920 | $45,920 | $45,920 |
| 646E10400 STOP LINE | 24 FT | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 646E10500 CROSSWALK LINE | 233 FT | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 646E20320 WRONG WAY ARROW | 2 EACH | $500 | $500 | $500 | $500 | $500 | $500 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 0.14 MILE | $46,065 | $46,065 | $46,065 | $46,065 | $46,065 | $46,065 |
| 807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG | 9.16 MILE | $5,730 | $5,730 | $5,730 | $5,730 | $5,730 | $5,730 |
| 807E14110 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, LAN | 4.28 MILE | $4,380 | $4,380 | $4,380 | $4,380 | $4,380 | $4,380 |
| 807E14310 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CHA | 2,825 FT | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 807E14410 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, DOT | 1,476 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,640 | $2,640 | $2,640 | $2,640 | $2,640 | $3,166 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 | $2.00 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.70 | $1.70 | $1.70 | $1.70 | $1.70 | $2.53 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $7,500 | $7,500 | $7,500 | $7,500 | $7,500 | $11,711 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $90.00 | $75.00 | $104 | $70.00 | $85.00 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 305 FT | $1.50 | $3.10 | $0.45 | $3.10 | $3.10 | $3.10 |
| 614E12385 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,100 | $2,100 | $3,400 | $2,100 | $2,100 | $3,982 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,000 | $8,320 | $11,000 | $8,320 | $8,320 | $10,151 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 12 EACH | $185 | $185 | $360 | $185 | $185 | $185 |
| 614E12500 REPLACEMENT SIGN | 15 EACH | $135 | $135 | $330 | $135 | $135 | $135 |
| 614E12600 REPLACEMENT DRUM | 300 EACH | $30.00 | $55.00 | $90.00 | $55.00 | $55.00 | $55.00 |
| 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM | 2 EACH | $26,500 | $26,500 | $26,500 | $26,500 | $36,000 | $28,789 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 2,386 EACH | $6.50 | $6.50 | $6.00 | $6.50 | $6.50 | $22.61 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 75 CY | $225 | $300 | $35.00 | $510 | $225 | $300 |
| 614E13310 BARRIER REFLECTOR, TYPE 1(ONE WAY) | 215 EACH | $6.00 | $10.00 | $5.00 | $10.00 | $10.00 | $10.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2(ONE WAY) | 39 EACH | $6.00 | $11.00 | $11.00 | $11.00 | $11.00 | $11.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 92 EACH | $9.00 | $13.00 | $16.00 | $13.00 | $13.00 | $13.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 81 EACH | $10.00 | $15.00 | $18.00 | $15.00 | $15.00 | $15.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $600 | $900 | $650 | $900 | $900 | $900 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 0.47 MILE | $1,275 | $1,275 | $1,275 | $1,275 | $1,275 | $1,275 |
| 614E20056 WORK ZONE LANE LINE, CLASS I, 6", 807 PAINT | 4.28 MILE | $595 | $595 | $595 | $595 | $595 | $595 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 2.63 MILE | $1,070 | $1,070 | $1,070 | $1,070 | $1,070 | $1,070 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 7.4 MILE | $1,610 | $1,610 | $1,610 | $1,610 | $1,610 | $1,610 |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 8.56 MILE | $1,935 | $1,935 | $1,935 | $1,935 | $1,935 | $1,935 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 5.27 MILE | $1,245 | $1,245 | $1,245 | $1,245 | $1,245 | $1,245 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 9,017 FT | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 614E23110 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 807 PAI | 2,825 FT | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 614E28000 WORK ZONE GORE MARKING, CLASS II | 252 FT | $0.55 | $0.55 | $0.55 | $0.55 | $0.55 | $0.55 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.: WORK ZONE DOTTE | 1,476 FT | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 |
| 616E10000 WATER | 10 MGAL | $10.00 | $5.00 | $65.00 | $60.00 | $60.00 | $15.38 |
| 622E41050 PORTABLE BARRIER, "Y" CONNECTOR | 2 EACH | $1,000 | $5,000 | $1,905 | $1,145 | $1,600 | $5,000 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 24 SNMT | $450 | $850 | $450 | $675 | $850 | $907 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,050 | $2,050 | $2,000 | $2,050 | $2,050 | $2,050 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $45,000 | $56,000 | $80,000 | $75,000 | $250,000 | $35,498 |
| 202E22900 APPROACH SLAB REMOVED | 308 SY | $35.00 | $45.00 | $25.00 | $35.00 | $40.00 | $37.24 |
| 202E23500 WEARING COURSE REMOVED | 1,544 SY | $7.00 | $6.75 | $14.00 | $5.00 | $9.00 | $9.19 |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 2,275 SF | $18.00 | $38.00 | $24.00 | $21.00 | $34.00 | $44.01 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $35,000 | $50,000 | $16,500 | $50,000 | $35,000 | $25,696 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 2,090 FT | $5.00 | $5.00 | $30.00 | $16.00 | $10.00 | $25.09 |
| 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 1,260 FT | $10.00 | $5.00 | $33.00 | $15.00 | $15.00 | $31.50 |
| 509E30020 NO. 4 GFRP DEFORMED BARS | 8,976 FT | $1.75 | $1.50 | $1.85 | $1.40 | $1.84 | $1.58 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 92 CY | $650 | $700 | $700 | $700 | $850 | $682 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 34 SF | $6.00 | $10.00 | $23.00 | $14.00 | $10.00 | $3.42 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 260 SF | $10.00 | $12.00 | $11.00 | $16.00 | $11.00 | $5.68 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 202 FT | $35.00 | $33.00 | $45.00 | $50.00 | $40.00 | $35.21 |
| 516E42600 ELASTOMERIC BEARING PAD, MISC.:5"x1" ELASTOMERIC B | 202 FT | $60.00 | $37.00 | $45.00 | $50.00 | $75.00 | $68.86 |
| 518E12500 SCUPPER, MISC.:CONTINUOUS SLAB BRIDGES | 5 EACH | $1,500 | $2,350 | $1,100 | $1,500 | $875 | $1,397 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 188 CY | $95.00 | $50.00 | $110 | $90.00 | $70.00 | $75.26 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 287 FT | $12.00 | $10.00 | $15.00 | $15.00 | $8.00 | $3.19 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 20 FT | $16.00 | $10.00 | $42.00 | $60.00 | $20.00 | $24.49 |
| 523E20000 DYNAMIC LOAD TESTING | 6 EACH | $2,750 | $2,950 | $4,400 | $3,000 | $5,000 | $4,390 |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 202 FT | $120 | $160 | $220 | $225 | $175 | $173 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 866 SY | $20.00 | $22.00 | $20.50 | $20.00 | $20.00 | $20.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $60,000 | $45,000 | $31,760 | $60,000 | $40,000 | $32,547 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $1,900 | $850 | $10,000 | $3,160 | $2,500 | $1,239 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,000 | $32,500 | $55,000 | $35,000 | $20,000 | $33,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 5,160 CY | $195 | $1.01M | 17% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 7,507 SY | $54 | $405k | 7% |
| 502E11101 STRUCTURE FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $357,500 | $358k | 6% |
| 511E32213 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 549 CY | $650 | $357k | 6% |
| 509E40000 REINFORCING STEEL, MISC.:GALVANIZED COATED REINFOR | 220,600 LB | $1.35 | $298k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $200k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75 | 106,096 SY | $1.8 | $191k | 3% |
| 507E00751 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,400 FT | $115 | $161k | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $160,000 | $160k | 3% |
| 507E00551 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 2,400 FT | $65 | $156k | 3% |