CUY-IR 90-18.22/VAR
CUY County · est $4.4M
Bid dateThursday, September 30—
CUY County · est $4.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 4.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 72 more items below.
| Item | Quantity | R1Northstar Contracting INC | R2Marra Services INC | R3Kenmore Construction CO INC | R4Eclipse CO LLC | R5Turn-key Tunneling INC | % of bid |
|---|---|---|---|---|---|---|---|
| 837E10001 LINER PIPE, AS PER PLAN (9'-0") | 530 FT | $850 | $1,211 | $1,170 | $1,042 | $2,028 | 16% |
| 837E10001 LINER PIPE, AS PER PLAN (7'-10" x 5'-2" AND 8'-11" | 480 FT | $850 | $1,020 | $900 | $748 | $1,739 | 14% |
| 837E10001 LINER PIPE, AS PER PLAN (8'-11" x 5'-5" AND 10'-0" | 440 FT | $850 | $1,123 | $1,080 | $958 | $1,864 | 13% |
| 837E10001 LINER PIPE, AS PER PLAN (10'-11" x 6'-11" AND 11'- |
| Item | Quantity | R1Northstar Contracting INC | R2Marra Services INC | R3Kenmore Construction CO INC | R4Eclipse CO LLC | R5Turn-key Tunneling INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $28,000 | $40,000 | $25,000 | $45,000 | $79,800 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 100 FT | $7.50 | $25.00 | $10.00 | $2.75 | $12.60 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $3,500 | $1,500 | $500 | $847 | $443 |
| 203E10000 EXCAVATION | 1,352 CY | $12.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 405 FT |
| $850 |
| $1,075 |
| $1,175 |
| $1,192 |
| $2,135 |
| 12% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,520 FT | $45.00 | $74.00 | $20.00 | $32.50 | $39.90 | 6% |
| 837E21001 BACKFILL FOR LINER PIPE, AS PER PLAN | 530 FT | $175 | $200 | $120 | $236 | $210 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $90,000 | $50,000 | $100,000 | $128,979 | $364,000 | 3% |
| 832E30000 EROSION CONTROL | 87,767 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 837E10001 LINER PIPE, AS PER PLAN (9'-7" x 8'-11") | 99 FT | $850 | $1,765 | $1,150 | $1,199 | $2,063 | 3% |
| 837E21001 BACKFILL FOR LINER PIPE, AS PER PLAN | 480 FT | $175 | $250 | $100 | $224 | $226 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $80,000 | $25,000 | $30,000 | $125,000 | $201,660 | 3% |
| 611E96560 CONDUIT, FIELD PAVING OF PIPE (9'-0") | 530 FT | $150 | $47.00 | $75.00 | $122 | $129 | 3% |
| 837E21001 BACKFILL FOR LINER PIPE, AS PER PLAN | 440 FT | $175 | $200 | $100 | $262 | $207 | 3% |
| 611E96560 CONDUIT, FIELD PAVING OF PIPE (7'-10" x 5'-2" AND | 480 FT | $150 | $40.00 | $75.00 | $121 | $127 | 3% |
| 837E21001 BACKFILL FOR LINER PIPE, AS PER PLAN | 405 FT | $175 | $200 | $100 | $254 | $318 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 90 SNMT | $750 | $850 | $800 | $709 | $971 | 2% |
| 611E96560 CONDUIT, FIELD PAVING OF PIPE(8'-11" x 5'-5" AND 1 | 440 FT | $150 | $45.00 | $75.00 | $136 | $122 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $60,000 | $17,000 | $5,000 | $28,672 | $8,300 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $50,000 | $40,000 | $150,000 | $235,273 | $350,000 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $50,000 | $40,000 | $150,000 | $236,000 | $336,850 | 2% |
| $25.00 |
| $25.00 |
| $24.50 |
| $19.16 |
| 203E20000 EMBANKMENT | 1,784 CY | $10.00 | $25.00 | $20.00 | $27.75 | $18.85 |
| 606E16000 GUARDRAIL REBUILT | 100 FT | $30.00 | $50.00 | $34.00 | $42.50 | $35.70 |
| 607E23004 FENCE REBUILT, TYPE CLT | 200 FT | $20.00 | $50.00 | $37.00 | $45.25 | $38.85 |
| 863E00300 GEOGRID, TYPE P3 | 1,400 SY | $3.00 | $2.50 | $4.00 | $4.75 | $6.56 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 80 FT | $15.00 | $93.00 | $10.00 | $22.75 | $66.73 |
| 601E11000 RIPRAP, TYPE D | 8 SY | $175 | $625 | $300 | $321 | $605 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 271 SY | $30.00 | $40.00 | $60.00 | $54.25 | $48.25 |
| 601E34000 ROCK CHANNEL PROTECTION, TYPE A WITHOUT FILTER | 281 CY | $125 | $170 | $95.00 | $111 | $153 |
| 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER | 35 CY | $100 | $458 | $150 | $108 | $318 |
| 659E00100 SOIL ANALYSIS TEST | 5 EACH | $125 | $200 | $100 | $158 | $105 |
| 659E00300 TOPSOIL | 1,713 CY | $25.00 | $50.00 | $25.00 | $44.50 | $29.14 |
| 659E10000 SEEDING AND MULCHING | 15,428 SY | $1.25 | $1.80 | $0.75 | $2.00 | $2.63 |
| 659E14000 REPAIR SEEDING AND MULCHING | 772 SY | $1.00 | $1.00 | $1.00 | $0.50 | $4.13 |
| 659E15000 INTER-SEEDING | 772 SY | $1.00 | $1.00 | $1.00 | $0.11 | $4.13 |
| 659E20000 COMMERCIAL FERTILIZER | 2.16 TON | $650 | $1,800 | $1,000 | $448 | $1,638 |
| 659E31000 LIME | 3.19 ACRE | $100 | $450 | $250 | $112 | $1,294 |
| 659E35000 WATER | 83.4 MGAL | $20.00 | $20.00 | $10.00 | $1.00 | $164 |
| 659E40000 MOWING | 104 MSF | $10.00 | $50.00 | $1.00 | $22.50 | $123 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $3,000 | $2,500 | $6,500 | $7,875 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $15,000 | $5,000 | $7,500 | $7,500 | $29,400 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,000 | $5,000 | $15,000 | $11,613 | $13,965 |
| 601E34100 ROCK CHANNEL PROTECTION, TYPE B WITHOUT FILTER | 45 CY | $75.00 | $356 | $94.00 | $105 | $199 |
| 611E05900 15" CONDUIT, TYPE B | 11 FT | $100 | $1,000 | $80.00 | $122 | $165 |
| 611E08900 21" CONDUIT, TYPE B | 80 FT | $125 | $500 | $130 | $118 | $364 |
| 611E11200 24" CONDUIT, TYPE F | 20 FT | $100 | $1,000 | $195 | $69.50 | $270 |
| 611E98300 CATCH BASIN, NO. 5 | 1 EACH | $4,000 | $3,500 | $3,600 | $7,481 | $4,578 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $5,000 | $6,000 | $3,600 | $8,027 | $6,431 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,500 | $1,600 | $2,200 | $2,048 | $3,150 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,500 | $1,600 | $2,200 | $2,048 | $3,990 |
| 614E12500 REPLACEMENT SIGN | 10 EACH | $120 | $150 | $120 | $57.75 | $126 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.06 MILE | $11,610 | $12,600 | $11,610 | $13,519 | $12,191 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.19 MILE | $8,710 | $9,700 | $8,710 | $7,140 | $9,146 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 30 FT | $2.80 | $3.80 | $2.80 | $5.00 | $2.94 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $5,000 | $10,000 | $200,000 | $63,147 | $1,016,000 |
| 616E10000 WATER | 5 MGAL | $1,000 | $100 | $20.00 | $31.25 | $47.25 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $75.00 | $65.00 | $75.00 | $68.25 | $153 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (1 WAY) | 70 EACH | $7.50 | $50.00 | $8.00 | $11.25 | $12.02 |
| 614E13350 OBJECT MARKER, ONE WAY (1 WAY) | 70 EACH | $25.00 | $50.00 | $12.00 | $11.25 | $16.80 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $20,000 | $10,000 | $25,000 | $36,897 | $223,434 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 72 CY | $55.00 | $140 | $70.00 | $86.00 | $188 |
| 503E21100 UNCLASSIFIED EXCAVATION | 72 CY | $75.00 | $75.00 | $35.00 | $98.00 | $33.00 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 2 EACH | $5,000 | $5,000 | $16,000 | $31,436 | $28,481 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $25,000 | $10,000 | $25,000 | $36,897 | $223,434 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 59 CY | $55.00 | $140 | $70.00 | $87.00 | $188 |
| 503E21100 UNCLASSIFIED EXCAVATION | 59 CY | $75.00 | $75.00 | $35.00 | $118 | $33.00 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 2 EACH | $5,000 | $5,000 | $16,000 | $31,436 | $32,492 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $20,000 | $10,000 | $25,000 | $36,897 | $336,850 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 36 CY | $55.00 | $140 | $70.00 | $103 | $188 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $50,000 | $40,000 | $150,000 | $234,000 | $256,598 |
| 503E21100 UNCLASSIFIED EXCAVATION | 36 CY | $75.00 | $100 | $35.00 | $120 | $97.00 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 2 EACH | $5,000 | $5,000 | $16,000 | $31,436 | $33,437 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $20,000 | $2,500 | $10,000 | $8,784 | $216,086 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $50,000 | $35,000 | $150,000 | $221,000 | $263,204 |
| 511E46611 CLASS QC1 CONCRETE, HEADWALL, AS PER PLAN | 8 CY | $1,000 | $2,500 | $1,500 | $3,032 | $3,570 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 10 SY | $25.00 | $200 | $100 | $57.75 | $26.25 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $20,000 | $5,000 | $5,000 | $8,606 | $33,351 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $50,000 | $30,000 | $6,000 | $30,467 | $6,500 |
| 503E21104 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 42 CY | $125 | $100 | $80.00 | $139 | $349 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,266 LB | $1.50 | $1.40 | $3.00 | $3.00 | $3.47 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 41 CY | $575 | $1,000 | $1,000 | $1,238 | $1,351 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 8 CY | $1,500 | $2,500 | $3,000 | $4,055 | $5,206 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 33 SY | $25.00 | $100 | $100 | $47.75 | $26.25 |
| 516E25000 NYLON REINFORCED NEOPRENE SHEETING | 54 SF | $50.00 | $75.00 | $120 | $86.50 | $138 |
| 837E21001 BACKFILL FOR LINER PIPE, AS PER PLAN | 99 FT | $150 | $400 | $150 | $500 | $393 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 42 EACH | $55.00 | $150 | $35.00 | $24.25 | $219 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $35,000 | $86,000 | $50,000 | $59,000 | $150,000 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $1,000 | $1,500 | $1,600 | $950 | $3,877 |
| 690E98000 SPECIAL - NEORSD CSO FLOW EVENT, AS PER PLAN | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 837E10001 LINER PIPE, AS PER PLAN (9'-0") | 530 FT | $850 | $451k | 13% |
| 837E10001 LINER PIPE, AS PER PLAN (7'-10" x 5'-2" AND 8'-11" | 480 FT | $850 | $408k | 11% |
| 837E10001 LINER PIPE, AS PER PLAN (8'-11" x 5'-5" AND 10'-0" | 440 FT | $850 | $374k | 10% |
| 837E10001 LINER PIPE, AS PER PLAN (10'-11" x 6'-11" AND 11'- | 405 FT | $850 | $344k | 10% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,520 FT | $45 | $158k | 4% |
| 837E21001 BACKFILL FOR LINER PIPE, AS PER PLAN | 530 FT | $175 | $93k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $90,000 | $90k | 3% |
| 832E30000 EROSION CONTROL | 87,767 EACH | $1 | $88k | 2% |
| 837E10001 LINER PIPE, AS PER PLAN (9'-7" x 8'-11") | 99 FT | $850 | $84k | 2% |
| 837E21001 BACKFILL FOR LINER PIPE, AS PER PLAN | 480 FT | $175 | $84k | 2% |