GEA-US 6-08.86
GEA County · est $1.4M
Bid dateThursday, October 14—
GEA County · est $1.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Kokosing Construction Company INC | R3Karvo Companies INC | R4Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 3,117 CY | $160 | $168 | $175 | $170 | 36% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (2071 CY | $145 | $142 | $160 | $160 | 22% |
| 253E02000 PAVEMENT REPAIR | 400 CY | $215 | $204 | $265 | $225 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $80,000 | $84,490 | $75,000 | $175,000 |
| Item | Quantity | R1Ronyak Paving INC | R2Kokosing Construction Company INC | R3Karvo Companies INC | R4Chagrin Valley Paving INC |
|---|---|---|---|---|---|
| 209E60201 LINEAR GRADING, AS PER PLAN | 507 STA | $3.00 | $46.00 | $32.00 | $20.00 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 9.6 MILE | $850 | $538 | $375 | $500 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $790 | $790 | $700 | $1,000 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 77,675 SY | $1.00 | $1.00 | $1.10 | $1.00 | 6% |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $480 | $402 | $270 | $300 | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 626 CY | $65.00 | $40.00 | $62.00 | $60.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $64,000 | $104,400 | 3% |
| 646E10010 EDGE LINE, 6" | 9.62 MILE | $2,890 | $2,600 | $2,600 | $2,600 | 2% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 600 SY | $45.00 | $82.00 | $80.00 | $60.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 11,484 GAL | $2.00 | $2.10 | $2.25 | $2.00 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 55 CY | $375 | $355 | $225 | $300 | 2% |
| 512E33010 TYPE 3 WATERPROOFING | 300 SY | $56.00 | $36.28 | $45.00 | $40.00 | 1% |
| 646E10200 CENTER LINE | 4.81 MILE | $2,950 | $4,450 | $4,450 | $4,450 | 1% |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 4.81 MILE | $2,800 | $4,250 | $4,000 | $2,500 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 19.24 MILE | $595 | $635 | $635 | $635 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,889 | $5,000 | $10,000 | $20,000 | 1% |
| 621E00100 RPM | 351 EACH | $31.00 | $31.00 | $34.50 | $31.00 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 9.62 MILE | $990 | $1,000 | $1,000 | $1,000 | 1% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 6 CY | $1,500 | $168 | $900 | $250 | 1% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $1,000 | $1,100 | $1,200 | $2,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 500 LB | $2.00 | $2.00 | $2.00 | $3.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 25 CY | $50.00 | $47.00 | $30.00 | $150 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 4.81 MILE | $675 | $675 | $1,250 | $2,300 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 263 EACH | $1.00 | $2.00 | $2.00 | $1.00 |
| 646E10400 STOP LINE | 245 FT | $10.50 | $15.50 | $15.50 | $15.50 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $450 | $800 | $1,000 | $800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $70.00 | $65.00 | $75.00 | $75.00 |
| 614E12460 WORK ZONE MARKING SIGN | 16 EACH | $60.00 | $60.00 | $60.00 | $60.00 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 25 CY | $110 | $100 | $75.00 | $250 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $450 | $900 | $900 | $900 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.81 MILE | $850 | $1,000 | $1,000 | $1,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 9.62 MILE | $500 | $585 | $585 | $585 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 490 FT | $2.50 | $3.00 | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 245 FT | $2.50 | $3.00 | $3.00 | $3.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $20.00 | $20.00 | $20.00 | $20.00 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $2,000 | $2,000 | $750 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,397 | $2,000 | $2,000 | $500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 3,117 CY | $160 | $499k | 35% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (2071 CY | $145 | $300k | 21% |
| 253E02000 PAVEMENT REPAIR | 400 CY | $215 | $86k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $80,000 | $80k | 6% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 77,675 SY | $1 | $78k | 5% |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $480 | $56k | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 626 CY | $65 | $41k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 646E10010 EDGE LINE, 6" | 9.62 MILE | $2,890 | $28k | 2% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 600 SY | $45 | $27k | 2% |